Permit Application Status

PRCOM20204497


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20204497
Building Permit - Commercial
Certificate of Occupancy
Summit Development Co
CHANGE OF TENANT
TENANT FINISH FOR SANDWICH SHOP **invite planner to final to verify rtu screening
11/30/2020
02/02/2021
06/12/2021
05/25/2021
Locations
Contacts
CAMM CONSTRUCTION INC, Address:PO BOX 1417, Phone:(816) 607-3602  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
ACCURATE MECHANICAL LLC, Address:205 E 13TH AVE, Phone:(816) 471-2272  
Curran Architecture, Address:5719 Lawton Loop E. Dr. @212, Phone:(317) 288-0681  
MIKE@CAMMCONSTRUCTIONINC.COM  
Summit Development Co, Address:700 W 47th St Ste 200  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 04/06/2021 04/06/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
04/06/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Sprinkler Plan Review Released for Construction 02/11/2021 02/11/2021
Michael Weissenbach
Building Plan Review Approved with Conditions 12/18/2020 02/02/2021
Joe Frogge
Health Dept Review
Resolved
01/12/2021

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 12/11/20 - not addressed
Health Dept Inspection
Corrective Action Required
12/11/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 12/11/20 - not addressed
Miscellaneous Correction
Resolved
12/11/2020

Wall details show a rated wall between adjacent tenants but the wall on the plans are shown existing. Action required: Clarify. (fyi - separation not required in this case) 12/11/20 - assuming they have the fire rated wall on detail sheet, but not actually used
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Resolved
12/11/2020

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) ICC A117.1-2017 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Self-serve tables, counters, etc. to be maximum 34" tall.
Planning - Screening of rooftop equipment
Corrective Action Required
12/11/2020

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (possibly existing? If this is a replacement, screening must be brought up to modern code.) 12/11/20 - per phone call existing screening is adequate. To be field verified.
IPC 918.1 Air admittance valve
Resolved
12/11/2020

2018 IPC 918.1 General. (as amended by LSCO 7-412) Section 918.1 is hereby amended to read as follows: Air admittance valve are only allowed when approved by the Administrative Authority. Vent systems utilizing air admittance valves shall comply with this section. Stack-type air admittance valves shall conform to ASSE 1050. Individual- and branch-type air admittance valves shall conform to ASSE 1051. Action required: Air admittance valves not approved for this project. Connect to dry vent. (AAV shown in Plumbing Equipment Schedule, not clear where the proposed location will be)
Fire Plan Review Approved with Conditions 12/18/2020 02/02/2021
Michael Weissenbach
Posting of occupant load
Corrective Action Required
02/02/2021

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load signage at 55. Mount near main exit.
Construction documents for fire alarm systems
Corrective Action Required
02/02/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
02/02/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address all exterior doors.
Construction documents - Fire protection systems
Corrective Action Required
02/02/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
02/02/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Corrective Action Required
02/02/2021

(ACTION REQUIRED) 2018 IFC 5307.3 Provide specs on CO2 tank. If more than 100 pounds of carbon dioxide used in beverage dispensing, gas detection will be required. 12/11/2020 No information provided 2/2/2021 (Verified At Inspection) Documentation provided
Panic and fire exit hardware
Corrective Action Required
02/02/2021

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. (Verified At Inspection) Provide Panic Hardware on doors 101A / 101B / 103 12/11/20 No information provided 2/2/2021 (Verified At Inspection)
Fire Plan Review Approved with Conditions 12/18/2020 01/20/2021
Joe Frogge
Posting of occupant load
Corrective Action Required
12/11/2020

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load signage at 55. Mount near main exit.
Construction documents for fire alarm systems
Corrective Action Required
12/11/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
12/11/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address all exterior doors.
Construction documents - Fire protection systems
Corrective Action Required
12/11/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
12/11/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Corrective Action Required
12/11/2020

(ACTION REQUIRED) 2018 IFC 5307.3 Provide specs on CO2 tank. If more than 100 pounds of carbon dioxide used in beverage dispensing, gas detection will be required. 12/11/2020 No information provided
Panic and fire exit hardware
Corrective Action Required
12/11/2020

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. (Verified At Inspection) Provide Panic Hardware on doors 101A / 101B / 103 12/11/20 No information provided
Licensed Contractors Approved 12/18/2020 01/20/2021
Joe Frogge
LC - MEP Subs
Corrective Action Required
12/11/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Health Department Review Approved 01/12/2021
Joe Frogge
Building Plan Review Rejected 12/10/2020 12/01/2020
Joe Frogge
Health Dept Review
Corrective Action Required
12/01/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
12/01/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
12/01/2020

Wall details show a rated wall between adjacent tenants but the wall on the plans are shown existing. Action required: Clarify. (fyi - separation not required in this case)
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
12/01/2020

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) ICC A117.1-2017 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Self-serve tables, counters, etc. to be maximum 34" tall.
Planning - Screening of rooftop equipment
Corrective Action Required
12/01/2020

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (possibly existing? If this is a replacement, screening must be brought up to modern code.)
IPC 918.1 Air admittance valve
Corrective Action Required
12/01/2020

2018 IPC 918.1 General. (as amended by LSCO 7-412) Section 918.1 is hereby amended to read as follows: Air admittance valve are only allowed when approved by the Administrative Authority. Vent systems utilizing air admittance valves shall comply with this section. Stack-type air admittance valves shall conform to ASSE 1050. Individual- and branch-type air admittance valves shall conform to ASSE 1051. Action required: Air admittance valves not approved for this project. Connect to dry vent. (AAV shown in Plumbing Equipment Schedule, not clear where the proposed location will be)
Licensed Contractors Rejected 12/10/2020 12/01/2020
Joe Frogge
LC - MEP Subs
Corrective Action Required
12/01/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 12/10/2020 12/01/2020
Michael Weissenbach
Posting of occupant load
Corrective Action Required
12/01/2020

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load signage at 55. Mount near main exit.
Construction documents for fire alarm systems
Corrective Action Required
12/01/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
12/01/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address all exterior doors.
Construction documents - Fire protection systems
Corrective Action Required
12/01/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
12/01/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Corrective Action Required
12/01/2020

(ACTION REQUIRED) 2018 IFC 5307.3 Provide specs on CO2 tank. If more than 100 pounds of carbon dioxide used in beverage dispensing, gas detection will be required.
Panic and fire exit hardware
Corrective Action Required
12/01/2020

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. (Verified At Inspection) Provide Panic Hardware on doors 101A / 101B / 103
Fees
Paid Fees Amount Paid Owing Date Paid
7232302-Commercial License Tax Fee $8,062.50 $8,062.50 Paid 12/01/2020
$8,062.50
8331507-Sewer Connection Fee $30.00 $30.00 Paid 02/02/2021
9110078-Valuation Fee for Change of Tenant $414.00 $414.00 Paid 02/02/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/25/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 2/18/2021 02/18/2021
Underslab Electrical Inspection - Commercial Passed 2/19/2021 2/19/2021 02/19/2021
In-wall Inspection Failed 3/4/2021 3/4/2021 03/04/2021
Misc
Corrective Action Required
03/04/2021
-Install boca plates at bottom track for extra 2” of plumbing protection -Secure 2” or smaller pvc at mid-wall -Secure MC cable within 12” of boxes -Install bonding pigtail for bonding devices
In-wall Inspection Passed 3/5/2021 3/5/2021 03/05/2021
Misc
Resolved
03/05/2021
-Install boca plates at bottom track for extra 2” of plumbing protection -Secure 2” or smaller pvc at mid-wall -Secure MC cable within 12” of boxes -Install bonding pigtail for bonding devices
Gas Piping Inspection - Commercial Failed 4/2/2021 4/2/2021 04/02/2021
Gas Service Inspection - Commercial Failed 4/2/2021 4/2/2021 04/02/2021
G406.4.1 Test pressure
Corrective Action Required
04/02/2021
INSPECTION, TESTING AND PURGING. AMENDED 7-608. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9 kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
Gas Service Inspection - Commercial Passed 4/5/2021 4/5/2021 04/05/2021
G406.4.1 Test pressure
Resolved
04/05/2021
INSPECTION, TESTING AND PURGING. AMENDED 7-608. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9 kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
Gas Piping Inspection - Commercial Partial 04/05/2021
Misc
Corrective Action Required
04/05/2021
-Provide protective paint on new metallic gas line for rooftop unit
Above Ceiling Inspection Partial 4/5/2021 4/5/2021 04/05/2021
Misc
Corrective Action Required
04/05/2021
-Patch holes in demising wall and clarify rating -Hard lids at bathrooms ok
Above Ceiling Inspection Passed 4/5/2021 4/5/2021 04/05/2021
Misc
Resolved
04/05/2021
-Kitchen and storage area ok -Hard lids at bathrooms ok
Electrical Service Inspection Not Ready 4/16/2021 4/16/2021 04/16/2021
Misc
Corrective Action Required
04/16/2021
-Not ready-complete installation and termination of conductors at disconnect -Provide proper clearance for service equipment per 110.26(e)(2)(b) -Multiple neutrals under same lug not permitted 408.41 -Bond interior metal water pipe, sprinkler pipe and water service per 250.104 -Provide intersystem bonding termination per 250.94(a) -Provide supplemental grounding electrode per 250.53(a)(2)
Electrical Service Inspection Failed 4/26/2021 4/26/2021 04/26/2021
Misc
Corrective Action Required
04/16/2021
-Provide proper clearance for service equipment per 110.26(e)(2)(b) -Multiple neutrals under same lug not permitted 408.41 -Bond interior metal water pipe, sprinkler pipe and water service per 250.104 -Provide intersystem bonding termination per 250.94(a) -Provide supplemental grounding electrode per 250.53(a)(2) -Ensure proper setting of main breaker per manufacturer instructions
Electrical Service Inspection Failed 4/28/2021 4/28/2021 04/28/2021
Misc
Corrective Action Required
04/26/2021
-Bond sprinkler pipe per NEC 250 -250.50 All grounding electrodes present at each building shall be bonded together to form the grounding electrode system
Electrical Service Inspection Passed 4/29/2021 4/29/2021 04/29/2021
Misc
Resolved
04/29/2021
Alarm Test Passed 05/14/2021
Occupancy Inspection - Fire Passed 5/19/2021 5/19/2021 05/19/2021
Gas Piping Inspection - Commercial Passed 05/19/2021
Misc
Resolved
05/19/2021
-Provide protective paint on new metallic gas line for rooftop unit
Occupancy Inspection - Codes Commercial Failed 5/19/2021 5/19/2021 05/19/2021
Miscellaneous Correction
Corrective Action Required
05/19/2021
-Pay all fees before occupancy -Provide health department approval -Install all equipment -Provide back flow device for beverage dispensers -Correct gaps at outlet in kitchen and switch in bathroom -Provide RTU screen as per planning division
Occupancy Inspection - Codes Commercial Full C of O 5/25/2021 5/25/2021 05/25/2021
Miscellaneous Correction
Resolved
05/25/2021
-Provide health department approval
Documents & Images
Date Uploaded File Type Document Name
11/30/2020 Application Form FHS application
11/30/2020 Application Form fhs LT
11/30/2020 Plans 11-17-20
11/30/2020 Letter License Tax Bill
12/01/2020 Letter Fire Building Plan Review
12/01/2020 Letter original DS P/R Corrections Document
12/11/2020 Plans FHS Lee's Summit MO 121120
12/11/2020 Letter Fire Building Plan Review
12/14/2020 Letter DS P/R Corrections Document
01/12/2021 Email New Food Establishment Plan Review - Approved FTG 0001831
02/02/2021 Letter Fire Building Plan Review
02/02/2021 Letter Co2 monitor form
02/02/2021 Receipt Receipt for transaction:2021-000524
02/02/2021 Letter DS Building Permit
02/03/2021 Approved Plans approved - FHS Lee's Summit MO 121120
02/11/2021 Letter Fire (Sprinkler) Plan Review
02/19/2021 Letter INSPECTION SUMMARY
02/19/2021 Letter INSPECTION SUMMARY
03/04/2021 Letter INSPECTION SUMMARY
03/05/2021 Letter INSPECTION SUMMARY
04/02/2021 Letter INSPECTION SUMMARY
04/02/2021 Letter INSPECTION SUMMARY
04/05/2021 Letter INSPECTION SUMMARY
04/05/2021 Letter INSPECTION SUMMARY
04/05/2021 Letter INSPECTION SUMMARY
04/05/2021 Letter INSPECTION SUMMARY
04/06/2021 PDF063
04/06/2021 Letter Fire (Alarm) Plan Review Notice
04/16/2021 Letter INSPECTION SUMMARY
04/26/2021 Letter INSPECTION SUMMARY
04/28/2021 Letter INSPECTION SUMMARY
04/28/2021 Letter INSPECTION SUMMARY
04/29/2021 Letter INSPECTION SUMMARY
05/14/2021 Letter Fire Loss Reduction Form
05/19/2021 Letter Fire Loss Reduction Form
05/19/2021 Letter INSPECTION SUMMARY
05/19/2021 Letter INSPECTION SUMMARY
05/19/2021 Letter Fire Building Plan Review
05/25/2021 Receipt Receipt for transaction:2021-003474
05/25/2021 health dept
05/25/2021 Letter Field Certificate of Occupancy
05/25/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home