Permit Application Status

PRCOM20201750


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20201750
Building Permit - Commercial
Certificate of Occupancy
DACUR INVESTMENT COMPANY INC
CHANGE OF TENANT
TENANT FINISH FOR HAIR STYLING SCHOOL **invite planner to final to verify rooftop screening
06/26/2020
07/15/2020
01/04/2021
10/21/2020
Locations
Contacts
ZIPCO CONTRACTING INC, Address:4110 N CORRINGTON AVE, Phone:(816) 471-3797  
DONNELLY HEATING & COOLING LLC, Address:1242 HOWELL ST, Phone:(816) 399-2610  
MORSE ELECTRIC, Address:815 NORTH ST, Phone:(816) 785-2385  
HAMPTON PLUMBING INC, Address:P O BOX 552, Phone:(816) 628-5069  
SCHARHAG ARCHITECTS, Address:6247 BROOKSIDE BLVD STE 204, Phone:(816) 656-5055  
ZIPCO CONTRACTING INC, Address:4110 N CORRINGTON AVE, Phone:(816) 471-3797  
DACUR INVESTMENT COMPANY INC, Address:2700 KENDALLWOOD PKWY # 208  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 10/02/2020 10/02/2020
Michael Weissenbach
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
10/02/2020

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. (Action Required) Riser shall have a current annual inspection tag.
Fire Plan Review Approved with Conditions 09/01/2020 08/27/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
08/27/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide electronic PE stamped shop drawings to mike. weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
08/27/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide electronic PE stamped shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
08/27/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Licensed Contractors Approved 07/15/2020 07/15/2020
Joe Frogge
LC - MEP Subs
Resolved
07/15/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 7/13/20 - acknowledged in letter
Building Plan Review Approved with Conditions 07/15/2020 07/13/2020
Joe Frogge
IBC 1209.2 Finish materials
Resolved
07/13/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish material at mop sink.
Misc
Corrective Action Required
07/08/2020

HVAC design is incomplete. Provide the following: - - Verification of screening rooftop and ground if condensing unit is ground mounted. 7/13/20 - to be field verified. - -
Fire Plan Review Approved with Conditions 07/15/2020 07/10/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
07/08/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide electronic PE stamped shop drawings to mike. weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
07/08/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide electronic PE stamped shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
07/08/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Rejected 07/09/2020 07/07/2020
Joe Frogge
IBC 1209.2 Finish materials
Corrective Action Required
07/07/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish material at mop sink.
Misc
Corrective Action Required
07/07/2020

HVAC design is incomplete. Provide the following: - location of condensing unit for new HP - Verification of screening rooftop and ground if condensing unit is ground mounted. - Verification that there is a convenience receptacle with 25' of any new roof or ground mounted equipment. - Outside air calculations and method of delivery.
Licensed Contractors Rejected 07/09/2020 07/07/2020
Joe Frogge
LC - MEP Subs
Corrective Action Required
07/07/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 07/09/2020 07/07/2020
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
07/07/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide electronic PE stamped shop drawings to mike. weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
07/07/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide electronic PE stamped shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
07/07/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fire Plan Review Approved with Conditions 07/09/2020 06/29/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
06/29/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide electronic PE stamped shop drawings to mike. weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
06/29/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide electronic PE stamped shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
06/29/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $480.00 $480.00 Paid 07/15/2020
$18,705.00
8331507-Sewer Connection Fee $330.00 $330.00 Paid 07/15/2020
7232302-Commercial License Tax Fee $8,947.50 $8,947.50 Paid 06/26/2020
$8,947.50
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 7/21/2020 07/21/2020
In-wall Inspection Passed 8/27/2020 8/27/2020 08/27/2020
Gas Piping Inspection - Commercial Failed 9/28/2020 9/28/2020 09/28/2020
Misc
Corrective Action Required
09/28/2020
- PROVIDE MIN 10 PSI FOR GAS TEST -
Gas Piping Inspection - Commercial Failed 9/30/2020 9/30/2020 09/30/2020
Misc
Corrective Action Required
09/28/2020
- PROVIDE MIN 10 PSI FOR GAS TEST -
Gas Service Inspection - Commercial Passed 10/12/2020 10/12/2020 10/12/2020
Misc
Informational
10/12/2020
- PRESSURE STEADY AT 25 PSI -
Gas Piping Inspection - Commercial Passed 10/12/2020 10/12/2020
Misc
Resolved
10/12/2020
- PROVIDE MIN 10 PSI FOR GAS TEST -
Above Ceiling Inspection Partial 10/15/2020 10/15/2020 10/15/2020
Misc
Corrective Action Required
10/15/2020
- PROVIDE ACCESS TO ABOVE CEILING AT WATER HEATERS & CHECK IN ROOM - - OK TO INSTALL CEILING TILES -
Occupancy Inspection - Fire Failed 10/16/2020 10/16/2020 10/16/2020
Above Ceiling Inspection Passed 10/16/2020 10/16/2020
Misc
Resolved
10/16/2020
Rough Electrical Inspection - Commercial Passed 8/27/2020 10/16/2020
Rough Plumbing Inspection - Commercial Passed 8/27/2020 10/16/2020
All Rough Inspection - Commercial Passed 8/27/2020 10/16/2020
Rough Mechanical Inspection - Commercial Passed 10/16/2020 10/16/2020
Occupancy Inspection - Codes Commercial Failed 10/16/2020 10/16/2020 10/16/2020
Misc
Corrective Action Required
10/16/2020
- INSTALL STORE FRONT GLASS - - LABEL SERVICE PANEL - - PROVIDE HAMMER ARRESTORS WASHING MACHINE - - PROVIDE 1" CLEARANCE AT B VENT - - COMPLETE ELECTRICAL THROUGHOUT - - LIST SUBJECT TO CHANGE NOT READY 10/16/20 -
Final Mechanical Inspection Passed 10/21/2020 10/21/2020
Final Plumbing Inspection - Commercial Passed 10/21/2020 10/21/2020
Occupancy Inspection - Fire Passed 10/21/2020 10/21/2020 10/21/2020
Occupancy Inspection - Codes Commercial Full C of O 10/21/2020 10/21/2020 10/21/2020
Misc
Resolved
10/21/2020
Documents & Images
Date Uploaded File Type Document Name
06/26/2020 Application Form Z Hair Academy Application Form - 6.26.20
06/26/2020 Plans Z Hair Academy sealed - 6.26.20
06/26/2020 Letter License Tax Bill
06/29/2020 Letter Fire Building Plan Review
07/07/2020 Letter DS P/R Corrections Document
07/08/2020 Letter Response Letter - Z Hair Academy
07/08/2020 Plans Z Hair Academy City Comments - sealed - 7_8_20
07/10/2020 Letter Fire Building Plan Review
07/15/2020 Plans Old Plans - Z Hair Academy
07/15/2020 Receipt Receipt for transaction:2020-004485
07/15/2020 Plans Z Hair Academy Revised with seal 7_13_20
07/15/2020 Letter DS Building Permit
07/21/2020 Letter INSPECTION SUMMARY
08/27/2020 Letter INSPECTION SUMMARY
08/27/2020 Letter Fire Building Plan Review
08/27/2020 Approved Plans Approved - revised - plans
09/28/2020 Letter INSPECTION SUMMARY
09/30/2020 Letter INSPECTION SUMMARY
10/02/2020 Letter Fire (Sprinkler) Plan Review
10/12/2020 Letter INSPECTION SUMMARY
10/12/2020 Letter INSPECTION SUMMARY
10/15/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/21/2020 Letter INSPECTION SUMMARY
10/21/2020 Letter INSPECTION SUMMARY
10/21/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home