Summary
PRCOM20201270
Building Permit - Commercial
Final Completion
PEREGRINE VALLEY INVESTMENTS LLC
ALTERATION COMMERCIAL
ROOF MOUNTED SOLAR - 144.8 KW
05/18/2020
05/22/2020
11/15/2020
07/10/2020
Locations
Contacts
SUNSMART TECHNOLOGIES, Address:1280 LIBERTY ST FL 1, Phone:(816) 298-7619  
PEREGRINE VALLEY INVESTMENTS LLC, Address:3730 NE TROON DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 05/29/2020 05/20/2020
Joe Frogge
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
Corrective Action Required
05/21/2020

2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. Action required: Provide guards where maintainable devices are located within 10' of roof edge. - To be field verified.
Licensed Contractors Approved 05/20/2020 05/20/2020
Joe Frogge
LC - MEP Subs
Resolved
05/20/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed Electrical Contractor.
Fire Plan Review Approved 05/29/2020 05/19/2020
Joe Frogge
Fire Department Solar Review Approved 05/20/2020 05/19/2020
Michael Weissenbach
Building Plan Review Rejected 05/20/2020 05/18/2020
Joe Frogge
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
Corrective Action Required
05/18/2020

2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. Action required: Provide guards where maintainable devices are located within 10' of roof edge.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $568.26 $568.26 Paid 05/22/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Fire Department Solar Inspection Passed 6/29/2020 6/29/2020 06/29/2020
Final Electrical Inspection - Commercial Failed 7/7/2020 7/7/2020 at 8:45 AM 07/07/2020
Misc
Corrective Action Required
07/07/2020
-Provide AC ratings at utility PV disconnect per revised plan. Plan shows incorrect 240V one phase ratings -Provide rapid shutdown labeling at utility PV disconnect per plan -Secure rooftop ent raceway -Provide DC ratings at inverters; provide other required labels per plan; label DC raceways per plan -Bond array modules. Check all -Protect all penetrations of fire-rated walls and ceiling
Final Electrical Inspection - Commercial Failed 7/9/2020 7/9/2020 at 12:55 PM 07/09/2020
Misc
Corrective Action Required
07/07/2020
-Provide AC ratings at utility PV disconnect per revised plan. Plan shows incorrect 240V one phase ratings -Provide rapid shutdown labeling at utility PV disconnect per plan **See NEC 690.56 for labeling requirement -Provide DC ratings at inverters; provide other required labels per plan; label DC raceways per plan -Protect all penetrations of fire-rated walls and ceiling
Electrical Service Inspection Passed 7/10/2020 7/10/2020 07/10/2020
Final Electrical Inspection - Commercial Failed 7/10/2020 7/10/2020 at 10:10 AM 07/10/2020
Misc
Corrective Action Required
07/09/2020
-Provide rapid shutdown labeling at utility PV disconnect per plan **one within 3 ft of PV switch and service disconnect -Provide required label at combiner panel per plan -Protect all penetrations of fire-rated walls and ceiling
Final Electrical Inspection - Commercial Passed 7/10/2020 07/10/2020
Misc
Resolved
07/10/2020
-Provide rapid shutdown labeling at utility PV disconnect per plan **one within 3 ft of PV switch and service disconnect -Provide required label at combiner panel per plan -Protect all penetrations of fire-rated walls and ceiling
Documents & Images
Date Uploaded File Type Document Name
05/18/2020 Engineer Report/Study sallee-real-estate-200-mo-EVEREST
05/18/2020 Engineer Report/Study EaglePerc G2 JKM390-410M-72HL-V-A2-US
05/18/2020 Engineer Report/Study SMA stp50-us-41 specs
05/18/2020 Engineer Report/Study D Dome R2 Technical Sheet US03-1218 (1)
05/18/2020 Engineer Report/Study Everest Commercial - CertificateofCompliance US1-1117 (1)
05/18/2020 Plans SalleeRealEstate200-MO COMPLETE DESIGN - Sealed BOTH
05/18/2020 Engineer Report/Study 2020-0836 - Existing Roof Report SalleeRealEstate
05/18/2020 Application Form Scope of Work Statement SunSmart Technologies 05-14-2020
05/19/2020 Letter Fire Building Plan Review
05/19/2020 Letter DS P/R Corrections Document
05/20/2020 Plans Old - COMPLETE DESIGN - Sealed BOTH
05/22/2020 Receipt Receipt for transaction:2020-002351
05/22/2020 Letter DS Building Permit
06/26/2020 Plans Approved - 200-MO electrical stamp_v2 (1)
07/07/2020 Letter INSPECTION SUMMARY
07/09/2020 Plans Approved - plans
07/09/2020 Letter INSPECTION SUMMARY
07/10/2020 Letter INSPECTION SUMMARY
07/10/2020 Letter INSPECTION SUMMARY
07/10/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home