Permit Application Status

PRCOM20200784


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20200784
Building Permit - Commercial
Certificate of Occupancy
DACUR INVESTMENT COMPANY INC
ALTERATION COMMERCIAL
RENOVATION OF EXISTING TIRE/AUTO STORE TO EXPAND EMPLOYEE WORK AREA
03/26/2020
03/27/2020
05/14/2020
Locations
Contacts
ZIPCO CONTRACTING INC, Address:4110 N CORRINGTON AVE, Phone:(816) 471-3797  
MORSE ELECTRIC, Address:815 NORTH ST, Phone:(816) 785-2385  
SCHARHAG ARCHITECTS, Address:6247 BROOKSIDE BLVD STE 204, Phone:(816) 656-5055  
DACUR INVESTMENT COMPANY INC, Address:2700 KENDALLWOOD PKWY # 208  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/27/2020
Joe Frogge
LC - General Contractor
Resolved
03/26/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
03/27/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved 04/07/2020 03/26/2020
Michael Weissenbach
Building Plan Review Approved 04/07/2020 03/26/2020
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $30.00 $30.00 Paid 03/27/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 4/2/2020 4/2/2020 04/02/2020
Occupancy Inspection - Fire Passed 05/14/2020
Above Ceiling Inspection Passed 5/14/2020 5/14/2020 05/14/2020
Occupancy Inspection - Codes Commercial Full C of O 5/18/2020 5/18/2020 05/14/2020
Rough Electrical Inspection - Commercial Passed 05/14/2020
Documents & Images
Date Uploaded File Type Document Name
03/26/2020 Letter Permit App Form
03/26/2020 Drawing Goodyear Store sealed
03/26/2020 Letter Fire Building Plan Review
03/27/2020 Receipt Receipt for transaction: 2020-001308
03/27/2020 Letter DS Building Permit
03/27/2020 signed permit
03/27/2020 Plans Approved - Goodyear drawings
04/02/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home