Permit Application Status

PRCOM20200281


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20200281
Building Permit - Commercial
Voided
TOP STAR LLC
NEW SHELL BUILDING
NEW SHELL BUILDING FOR FUTURE TENANTS
02/06/2020
08/17/2020
11/08/2022
Locations
Contacts
  
  
  
  
SCHARHAG ARCHITECTS, Address:6247 BROOKSIDE BLVD STE 204, Phone:(816) 656-5055  
TOP STAR LLC, Address:244 W MILL STE 101  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 03/05/2020 03/03/2020
Michael Weissenbach
Portable fire extinguishers - conspicuous locations
Corrective Action Required
02/27/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide one 2A10BC Fire Extinguisher in each space.
Building Plan Review Approved with Conditions 03/05/2020 02/28/2020
Joe Frogge
Misc
Corrective Action Required
02/27/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 2/28/20 - acknowledged in letter.
Suite address
Resolved
02/28/2020

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: This building has been assigned the addresses of 5040, 5042, 5044, 5046 NE Lakewood Way with the suites lining up with the column bays and ascending from southwest to northeast. 5020 is the Please update your records accordingly.
Engineered truss package
Corrective Action Required
02/27/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral. 2/28/20 - deferred per request
Planning - Screening of ground mounted equipment
Corrective Action Required
02/27/2020

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Comment is for informational purposes. Landscape drawing does not clearly show that condensing units will be screened from all 4 sides. To be field verified. 2/28/20 - acknowledged in letter.
Misc
Resolved
02/28/2020

Restroom locations may prove problematic in the future in that future designs are not allowed to have access to restrooms be through storage areas which are commonly in the rear of a suite. Also, most of these spaces (unless fully carpeted) will eventually be required to have mop sinks. Action required: None. Comment is for informational purposes.
ICC A117.1 305.3 Clear Floor Space
Resolved
02/28/2020

ICC A117.1 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width. 305.3. Existing Buildings and facilities. In existing buildings and facilities the clear floor space shall be 48 inches minimum in length and 30 inches minimum in width. Action required: Modify designs to show increased floor space requirement.
ICC A117.1 304.3 Turning Space
Resolved
02/28/2020

ICC A117.1 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) 304.3.1.2 Existing buildings and facilities. In existing buildings and facilities, the turning space shall be a circular space with a 60-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Modify "sanitary facilities" note #1 on sheet A102 to comply.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
02/28/2020

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle(s) to serve condensing units.
IMC 801.2 Combustion air required
Resolved
02/28/2020

2018 IMC 801.2 General. Every fuel-burning appliance shall discharge the products of combustion to a vent, factory-built chimney or masonry chimney, except for appliances vented in accordance with Section 804. The chimney or vent shall be designed for the type of appliance being ventilated. (see code for exception) Action required: Provide complete design for combustion and ventilation air serving furnaces and water heaters.
IPC 708.1 Cleanouts required
Resolved
02/28/2020

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.1 Horizontal drains within buildings. Horizontal drainage pipes in buildings shall have cleanouts located at intervals of not more than 100 feet. Building drains shall have cleanouts located at intervals of not more than 100 feet apart except where manholes are used instead of cleanouts, the manholes hall be located at intervals of not more than 400 feet. The interval length shall be measured from the cleanout or manhole opening, along the developed length of the piping to the next drainage fitting providing access for cleaning, the end of the horizontal drain or the end of the building drain. (see code for exception) 2018 IPC 708.1.2 Building sewers. Building sewers smaller than 8 inches shall have cleanouts located at intervals of not more than 100 feet. Building sewers 8 inches and larger shall have a manhole located not more than 200 feet from the junction of the building drain and the building sewer and at intervals of not more than 400 feet. The interval length shall be measured from the cleanout or manhole opening, along the developed length of the piping to the next drainage fitting providing access for cleaning, a manhole or the end of the building sewer. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. 2018 IPC 708.1.4 Changes of direction. Where a horizontal drainage pipe, a building drain or a building sewer has a change of horizontal direction greater than 45 degrees, a cleanout shall be installed at the change of direction. Where more than one change of horizontal direction greater than 45 degrees occurs within 40 feet of developed length of piping, the cleanout installed for the first change of direction shall serve as the cleanout for all changes in direction within that 40 feet of developed length of piping. Action required: Provide cleanout near where sewer piping leaves building footprint.
Licensed Contractors Rejected 02/27/2020 02/28/2020
Joe Frogge
LC - MEP Subs
Corrective Action Required
02/27/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 2/28/20 - acknowledged in letter.
LC - General Contractor
Corrective Action Required
02/27/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 2/28/20 - acknowledged in letter.
Licensed Contractors Rejected 02/21/2020 02/19/2020
Joe Frogge
LC - MEP Subs
Corrective Action Required
02/19/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Corrective Action Required
02/19/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
Building Plan Review Rejected 02/21/2020 02/19/2020
Joe Frogge
Misc
Corrective Action Required
02/19/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Suite address
Corrective Action Required
02/19/2020

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: This building has been assigned the addresses of 5040, 5042, 5044, 5046 NE Lakewood Way with the suites lining up with the column bays and ascending from southwest to northeast. 5020 is the Please update your records accordingly.
Engineered truss package
Corrective Action Required
02/19/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral.
Planning - Screening of ground mounted equipment
Corrective Action Required
02/19/2020

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Comment is for informational purposes. Landscape drawing does not clearly show that condensing units will be screened from all 4 sides. To be field verified.
Misc
Corrective Action Required
02/19/2020

Restroom locations may prove problematic in the future in that future designs are not allowed to have access to restrooms be through storage areas which are commonly in the rear of a suite. Also, most of these spaces (unless fully carpeted) will eventually be required to have mop sinks. Action required: None. Comment is for informational purposes.
ICC A117.1 305.3 Clear Floor Space
Corrective Action Required
02/19/2020

ICC A117.1 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width. 305.3. Existing Buildings and facilities. In existing buildings and facilities the clear floor space shall be 48 inches minimum in length and 30 inches minimum in width. Action required: Modify designs to show increased floor space requirement.
ICC A117.1 304.3 Turning Space
Corrective Action Required
02/19/2020

ICC A117.1 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) 304.3.1.2 Existing buildings and facilities. In existing buildings and facilities, the turning space shall be a circular space with a 60-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Modify "sanitary facilities" note #1 on sheet A102 to comply.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
02/19/2020

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle(s) to serve condensing units.
IMC 801.2 Combustion air required
Corrective Action Required
02/19/2020

2018 IMC 801.2 General. Every fuel-burning appliance shall discharge the products of combustion to a vent, factory-built chimney or masonry chimney, except for appliances vented in accordance with Section 804. The chimney or vent shall be designed for the type of appliance being ventilated. (see code for exception) Action required: Provide complete design for combustion and ventilation air serving furnaces and water heaters.
IPC 708.1 Cleanouts required
Corrective Action Required
02/19/2020

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.1 Horizontal drains within buildings. Horizontal drainage pipes in buildings shall have cleanouts located at intervals of not more than 100 feet. Building drains shall have cleanouts located at intervals of not more than 100 feet apart except where manholes are used instead of cleanouts, the manholes hall be located at intervals of not more than 400 feet. The interval length shall be measured from the cleanout or manhole opening, along the developed length of the piping to the next drainage fitting providing access for cleaning, the end of the horizontal drain or the end of the building drain. (see code for exception) 2018 IPC 708.1.2 Building sewers. Building sewers smaller than 8 inches shall have cleanouts located at intervals of not more than 100 feet. Building sewers 8 inches and larger shall have a manhole located not more than 200 feet from the junction of the building drain and the building sewer and at intervals of not more than 400 feet. The interval length shall be measured from the cleanout or manhole opening, along the developed length of the piping to the next drainage fitting providing access for cleaning, a manhole or the end of the building sewer. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. 2018 IPC 708.1.4 Changes of direction. Where a horizontal drainage pipe, a building drain or a building sewer has a change of horizontal direction greater than 45 degrees, a cleanout shall be installed at the change of direction. Where more than one change of horizontal direction greater than 45 degrees occurs within 40 feet of developed length of piping, the cleanout installed for the first change of direction shall serve as the cleanout for all changes in direction within that 40 feet of developed length of piping. Action required: Provide cleanout near where sewer piping leaves building footprint.
Fire Plan Review Approved with Conditions 02/21/2020 02/12/2020
Michael Weissenbach
Portable fire extinguishers - conspicuous locations
Corrective Action Required
02/12/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide one 2A10BC Fire Extinguisher in each space.
Final Development Plan Review Approved 02/21/2020 02/06/2020
Joe Frogge
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
02/12/2020 Letter Fire Building Plan Review
02/19/2020 Letter DS P/R Corrections Document
03/03/2020 Letter Fire Building Plan Review
10/18/2022 Letter Application Expired Notice
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home