Permit Application Status

PRCOM20193281


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20193281
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
NEW OTHER (COMMERCIAL)
NEW STORAGE BUILDING ELECTRICAL UNDER SEPARATE PERMIT - PRCOM20193265 ELECTRCIAL FOR BUILDING NOT HVAC DO FINAL BUILDING AT SAME TIME CLOSE BOTH OUT. WHEN STEVE (PARKS) HAS PLANS ON SITE
11/07/2019
11/14/2019
02/25/2020
Locations
Contacts
MORTON BUILDINGS INC, Address:2006 FRONTAGE RD, Phone:(660) 885-5759  
BRANDY ELECTRIC INC, Address:500 SW GULL POINT CT, Phone:(816) 716-4788  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 11/21/2019 11/11/2019
Michael Weissenbach
Address numbers required
Corrective Action Required
11/11/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
11/11/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide 1 2A10BC Fire Extinguisher
Building Plan Review Approved 11/21/2019 11/08/2019
Joe Frogge
Licensed Contractors Approved 11/07/2019 11/07/2019
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Other $238.50 $238.50 Paid 11/13/2019
$0.00
7232302-Industrial/Warehouse License Tax Fee $480.00 $480.00 Paid 03/24/2020
$480.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 12/20/2019 12/20/2019 at 1:05 PM 12/20/2019
Informational
12/20/2019
-COLUMN SUPPORT PIERS-OK
Final Inspection - Commercial Failed 2/18/2020 2/18/2020 02/18/2020
Misc
Corrective Action Required
02/18/2020
Steve Thomas @ 816-223-2406 RESCHEDULE WHEN APPROVED PLANS ARE ON SITE, ALL ELECTRICAL HAS BEEN OPENED UP AND JUNCTION BOXES ARE VISIABLE
Occupancy Inspection - Fire Passed 2/18/2020 02/21/2020
Final Inspection - Commercial Passed 2/26/2020 2/26/2020 02/25/2020
Misc
Resolved
02/25/2020
Steve Thomas @ 816-223-2406 RESCHEDULE WHEN APPROVED PLANS ARE ON SITE, ALL ELECTRICAL HAS BEEN OPENED UP AND JUNCTION BOXES ARE VISIABLE
Documents & Images
Date Uploaded File Type Document Name
11/07/2019 Letter License Tax Bill
11/11/2019 Letter Fire Building Plan Review
11/13/2019 Receipt Receipt for transaction: 2019-007286
11/14/2019 Letter DS Building Permit
11/20/2019 billing info
12/20/2019 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/25/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home