Permit Application Status

PRCOM20193191


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20193191
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW TENANT FINISH
FIRST WATCH - TENANT FINISH FOR BREAKFAST THEMED RESTAURANT FIRST WATCH THE DAYTIME CAFE
10/30/2019
04/17/2020
05/03/2020
09/09/2020
Locations
Contacts
SPIEGELGLASS CONSTRUCTION CO INC, Address:18 WORTHINGTON ACCESS DR, Phone:(314) 569-2300  
ARCHITECTURAL GROUP INTERNATIONAL, Address:15 W 7TH ST.  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
LBA AIR CONDITIONING, HEATING AND PLUMBING INC, Address:6850 W 47TH TER, Phone:(913) 268-6822  
KDM ELECTRICAL CONTRACTORS, Address:1103 NW CASEY BLVD STE C, Phone:(816) 443-5694  
PRODIGY PLUMBING & MECHANICAL INC, Address:8402 WESTRIDGE RD, Phone:(816) 984-9292  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 03/27/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
03/27/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing
Licensed Contractors Approved 03/17/2020 03/17/2020
Dawn Bell
LC - General Contractor
Corrective Action Required
03/17/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 11/27/19 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
03/17/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/27/19 - acknowledged in letter
Sprinkler Plan Review Released for Construction 03/17/2020
Michael Weissenbach
Licensed Contractors Rejected 12/06/2019 11/27/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
11/27/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 11/27/19 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
11/27/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/27/19 - acknowledged in letter
Building Plan Review Approved with Conditions 12/06/2019 11/27/2019
Joe Frogge
Miscellaneous Correction
Corrective Action Required
11/27/2019

This tenant finish permit is tied to a shell permit. Action required: Comment is for informational purposes. Occupancy will not be granted for the tenant prior to completion of shell permit. 11/27/19 - acknowledged in letter
Suite address
Resolved
11/27/2019

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: This suite has been assigned the address of 920 NW Pryor Rd, Unit:A. Please update your records.
Health Dept Inspection
Corrective Action Required
11/27/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 11/27/19 - acknowledged in letter
Gen - Plan submittals 2018 codes
Resolved
11/27/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update code references.
ICC A117.1 304.3 Turning Space
Resolved
11/27/2019

ICC A117.1 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) 304.3.1.2 Existing buildings and facilities. In existing buildings and facilities, the turning space shall be a circular space with a 60-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Update all turning radii to 67".
ICC A117.1 305.3 Clear Floor Space
Resolved
11/27/2019

ICC A117.1 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width. 305.3. Existing Buildings and facilities. In existing buildings and facilities the clear floor space shall be 48 inches minimum in length and 30 inches minimum in width. Action required: Update clear floor space references to 52" length.
ICC A117.1 902.4 Dining and work surfaces
Resolved
11/27/2019

ICC A117.1 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Update detail sections 10/A306 & 11/A306 to comply.
Gen - Plan submittal documents
Resolved
11/27/2019

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Provide engineer's seal on Captive Aire drawings.
IMC 506.5.3 Grease fan mounting hinge
Resolved
11/27/2019

2018 IMC 506.5.3 Exhaust fan mounting. Up-blast fans serving Type I hoods and installed in a vertical or horizontal position shall be hinged and supplied with a flexible weatherproof electrical cable to permit inspection and cleaning and shall be equipped with a means of restraint to limit the swing of the fan on its hinge. The ductwork shall extend not less than 18 inches above the roof surface. Action required: Update details for grease hood fan to show that it will be hinged.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
11/27/2019

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacles within 25' of new roof mounted condensing units.
Fire Plan Review Approved with Conditions 12/06/2019 11/27/2019
Michael Weissenbach
Posting of occupant load
Corrective Action Required
11/27/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load sign at 270 for the interior and 24 on the exterior sign.
Construction documents for fire alarm systems
Corrective Action Required
11/27/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the alarm system, provide three sets of PE stamped shop drawings. Hood systems will need to be tied into the alarm system.
Address numbers required
Corrective Action Required
11/27/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Type I hood - Where required
Resolved
11/27/2019

2018 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. (Action Required) Label hoods #1 and #2 on the hood and signage above the pull stations. Pull stations to be mounted not less than 10 feet from the hoods and no more than 20 feet.
Construction documents - Fire protection systems
Corrective Action Required
11/27/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications made to the fire sprinkler system, provide three sets of PE stamped shop drawings. Walk in cooler and freezer will need to be sprinklered.
Installation acceptance testing
Corrective Action Required
11/27/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. Life safety must pass before an occupancy inspection can be scheduled.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
11/27/2019

2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. (Verified At Inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
11/27/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide 2 2A10BC fire extinguishers.
Misc
Resolved
11/27/2019

(Informational Purposes) 2018 IFC codes apply
Duct smoke detectors
Corrective Action Required
11/27/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Verified At Inspection) Duct detection will be required with CFM greater than 2000.
Panic and fire exit hardware
Resolved
11/27/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. (Action Required) Provide panic hardware on all exits including the exterior gates.
Health Department Review Approved 11/20/2019
Joe Frogge
Building Plan Review Rejected 11/11/2019 11/05/2019
Joe Frogge
Miscellaneous Correction
Corrective Action Required
11/05/2019

This tenant finish permit is tied to a shell permit. Action required: Comment is for informational purposes. Occupancy will not be granted for the tenant prior to completion of shell permit.
Suite address
Corrective Action Required
11/05/2019

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: This suite has been assigned the address of 920 NW Pryor Rd, Unit:A. Please update your records.
Health Dept Review
Resolved
11/20/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
11/05/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Gen - Plan submittals 2018 codes
Corrective Action Required
11/05/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update code references.
ICC A117.1 304.3 Turning Space
Corrective Action Required
11/05/2019

ICC A117.1 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) 304.3.1.2 Existing buildings and facilities. In existing buildings and facilities, the turning space shall be a circular space with a 60-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Update all turning radii to 67".
ICC A117.1 305.3 Clear Floor Space
Corrective Action Required
11/05/2019

ICC A117.1 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width. 305.3. Existing Buildings and facilities. In existing buildings and facilities the clear floor space shall be 48 inches minimum in length and 30 inches minimum in width. Action required: Update clear floor space references to 52" length.
ICC A117.1 902.4 Dining and work surfaces
Corrective Action Required
11/05/2019

ICC A117.1 Section 902.4 Height. The tops of dining surfaces and work surfaces shall be 28 inches minimum and 34 inches maximum in height above the floor. Action required: Update detail sections 10/A306 & 11/A306 to comply.
Gen - Plan submittal documents
Corrective Action Required
11/05/2019

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Provide engineer's seal on Captive Aire drawings.
IMC 506.5.3 Grease fan mounting hinge
Corrective Action Required
11/05/2019

2018 IMC 506.5.3 Exhaust fan mounting. Up-blast fans serving Type I hoods and installed in a vertical or horizontal position shall be hinged and supplied with a flexible weatherproof electrical cable to permit inspection and cleaning and shall be equipped with a means of restraint to limit the swing of the fan on its hinge. The ductwork shall extend not less than 18 inches above the roof surface. Action required: Update details for grease hood fan to show that it will be hinged.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
11/05/2019

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacles within 25' of new roof mounted condensing units.
Licensed Contractors Rejected 11/11/2019 11/05/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
11/05/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
11/05/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 11/11/2019 10/31/2019
Michael Weissenbach
Posting of occupant load
Corrective Action Required
10/31/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load sign at 270 for the interior and 24 on the exterior sign.
Construction documents for fire alarm systems
Corrective Action Required
10/31/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the alarm system, provide three sets of PE stamped shop drawings. Hood systems will need to be tied into the alarm system.
Address numbers required
Corrective Action Required
10/31/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Type I hood - Where required
Corrective Action Required
10/31/2019

2018 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. (Action Required) Label hoods #1 and #2 on the hood and signage above the pull stations. Pull stations to be mounted not less than 10 feet from the hoods and no more than 20 feet.
Construction documents - Fire protection systems
Corrective Action Required
10/31/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications made to the fire sprinkler system, provide three sets of PE stamped shop drawings. Walk in cooler and freezer will need to be sprinklered.
Installation acceptance testing
Corrective Action Required
10/31/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. Life safety must pass before an occupancy inspection can be scheduled.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
10/31/2019

2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. (Verified At Inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
10/31/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Provide 2 2A10BC fire extinguishers.
Misc
Corrective Action Required
10/31/2019

(Informational Purposes) 2018 IFC codes apply
Duct smoke detectors
Corrective Action Required
10/31/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Duct detection will be required with CFM greater than 2000.
Panic and fire exit hardware
Corrective Action Required
10/31/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. (Action Required) Provide panic hardware on all exits including the exterior gates.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $1,400.00 $1,400.00 Paid 04/17/2020
8331507-Sewer Connection Fee $510.00 $510.00 Paid 04/17/2020
7232302-Commercial License Tax Fee $16,732.50 $16,732.50 Paid 09/03/2020
$16,732.50
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 6/29/2020 6/29/2020 06/29/2020
Misc
Informational
06/29/2020
- SANITARY & GREASE LINE STEADY AT 5 PSI -
Underslab Electrical Inspection - Commercial Passed 7/1/2020 7/1/2020 07/01/2020
In-wall Inspection Passed 7/15/2020 7/15/2020 07/15/2020
Electrical Service Inspection Partial 7/31/2020 7/31/2020 07/31/2020
Misc
Corrective Action Required
07/31/2020
PARTIAL FOR RELEASE-EXTERIOR DISCONNECT OK COLOR CODE EGC. AT INSIDE PANEL.
Hood/Duct Inspection Passed 8/5/2020 8/5/2020 08/05/2020
Misc
Informational
08/05/2020
- WELDS APPROVED ON 4 SECTIONS OF GREASE DUCT ON FLOOR BEFORE INSTALLED -
Hood/Duct Inspection Partial 8/6/2020 8/6/2020 08/06/2020
Misc
Informational
08/06/2020
- WELDS APPROVED FOR 1ST LAYER WRAP -
Hood/Duct Inspection Partial 8/7/2020 8/7/2020 08/07/2020
Misc
Informational
08/06/2020
- WELDS APPROVED FOR 1ST LAYER WRAP - - OK FOR SECOND LAYER WRAP -
Hood/Duct Inspection Partial 8/11/2020 8/11/2020 08/11/2020
Misc
Informational
08/07/2020
- WELDS APPROVED FOR 1ST LAYER WRAP - - OK FOR SECOND LAYER WRAP - - 2ND LAYER WRAP APPROVED -
Above Ceiling Inspection Passed 8/12/2020 8/12/2020 08/12/2020
Gas Service Inspection - Commercial Passed 8/26/2020 8/26/2020 08/26/2020
Hood/Duct Inspection Passed 9/9/2020 08/31/2020
Misc
Informational
08/11/2020
- WELDS APPROVED FOR 1ST LAYER WRAP - - OK FOR SECOND LAYER WRAP - - 2ND LAYER WRAP APPROVED -
Electrical Service Inspection Passed 9/1/2020 09/01/2020
Misc
Resolved
09/01/2020
PARTIAL FOR RELEASE-EXTERIOR DISCONNECT OK COLOR CODE EGC. AT INSIDE PANEL.
Alarm Test Passed 9/8/2020 09/08/2020
Hood/Duct Inspection Passed 9/8/2020 09/08/2020
Occupancy Inspection - Fire Passed 9/9/2020 09/09/2020
Alternate Protection Systems Inspection Passed 9/8/2020 09/09/2020
Gas Piping Inspection - Commercial Passed 9/9/2020 09/09/2020
Occupancy Inspection - Codes Commercial Full C of O 9/9/2020 9/9/2020 09/09/2020
Documents & Images
Date Uploaded File Type Document Name
10/31/2019 Letter Fire Building Plan Review
11/05/2019 Letter DS P/R Corrections Document
11/20/2019 New Food Establishment Plan Review - Approved FTG 0001597
11/27/2019 Letter Fire Building Plan Review
03/17/2020 Letter Fire (Sprinkler) Plan Review
03/27/2020 Letter Fire (Alarm) Plan Review Notice
04/17/2020 190727 - COMBINED SET 11-20-19
04/17/2020 Receipt Receipt for transaction:2020-001602
04/17/2020 Letter DS Building Permit
04/17/2020 approved - 190727 - COMBINED SET 11-20-19
06/29/2020 Letter INSPECTION SUMMARY
07/01/2020 Letter INSPECTION SUMMARY
07/15/2020 Letter INSPECTION SUMMARY
07/31/2020 Letter INSPECTION SUMMARY
08/05/2020 Letter INSPECTION SUMMARY
08/06/2020 Letter INSPECTION SUMMARY
08/07/2020 Letter INSPECTION SUMMARY
08/11/2020 Letter INSPECTION SUMMARY
08/12/2020 Letter INSPECTION SUMMARY
08/26/2020 Letter INSPECTION SUMMARY
09/01/2020 Letter INSPECTION SUMMARY
09/09/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home