Review Type |
Outcome |
Est. Completion Date |
Completed |
Licensed Contractors
|
Approved
|
12/17/2019
|
12/16/2019
|
|
Joe Frogge
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
10/8/19 - Acknowledged in letter
|
|
|
Fire Plan Review
|
Approved with Conditions
|
12/17/2019
|
12/11/2019
|
|
Michael Weissenbach
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
(Action Required)
Any modifications to the alarm system, provide three sets of PE stamped shop drawings.
|
|
Hazardous material identification
Corrective Action Required
2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5.
(Verified At Inspection)
Label all rooms
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
(Action Required)
Any modifications to the sprinkler system, provide three sets of PE stamped shop drawings.
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational Purposes)
Call (816)969-1300 to schedule testing.
|
|
|
Building Plan Review
|
Approved with Conditions
|
12/17/2019
|
12/10/2019
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
The permit for these suites is tied to an incomplete shell. Occupancy for the suites will not be granted until occupancy for shell has been granted.
Action required: Comment is for informational purposes.
10/8/19 - Acknowledged in letter
|
|
Project cost
The project cost, which is used to establish the permit fee, has not been provided.
Action required: Comment is for informational purposes.
10/8/19 - Acknowledged in letter
|
|
Suite address
Corrective Action Required
This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located.
Action required: Comment is for informational purposes. This building has been assigned the address of 1980 SE Blue Pkwy. Please update your records.
The suites have been assigned the following numbers:
1100 - Bariatric
1200 - Neuro
1300 - GI
3100 - Cardiology
3200 - Surgery Clinic
3300 - Imaging
10/8/19 - Acknowledged in letter
|
|
|
Fire Plan Review
|
Approved with Conditions
|
12/17/2019
|
10/08/2019
|
|
Michael Weissenbach
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
(Action Required)
Any modifications to the alarm system, provide three sets of PE stamped shop drawings.
|
|
Hazardous material identification
Corrective Action Required
2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5.
(Verified At Inspection)
Label all rooms
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
(Action Required)
Any modifications to the sprinkler system, provide three sets of PE stamped shop drawings.
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational Purposes)
Call (816)969-1300 to schedule testing.
|
|
|
Building Plan Review
|
Approved with Conditions
|
12/17/2019
|
10/08/2019
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
The permit for these suites is tied to an incomplete shell. Occupancy for the suites will not be granted until occupancy for shell has been granted.
Action required: Comment is for informational purposes.
10/8/19 - Acknowledged in letter
|
|
Project cost
Corrective Action Required
The project cost, which is used to establish the permit fee, has not been provided.
Action required: Comment is for informational purposes.
10/8/19 - Acknowledged in letter
|
|
Suite address
Corrective Action Required
This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located.
Action required: Comment is for informational purposes. This building has been assigned the address of 1980 SE Blue Pkwy. Please update your records.
The suites have been assigned the following numbers:
1100 - Bariatric
1200 - Neuro
1300 - GI
3100 - Cardiology
3200 - Surgery Clinic
3300 - Imaging
10/8/19 - Acknowledged in letter
|
|
Plan Submittal 2012 Codes
All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit
Action required: Update code analysis to show correct accessibility code which is ICC/ANSI A117.1-2017
|
|
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
ICC A117.1-2017 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2.
Action required: Provide minimum 18" clearance at latch side of doors out of Dressing Rooms 3-310 & 3-311.
|
|
|
Licensed Contractors
|
Rejected
|
12/17/2019
|
10/08/2019
|
|
Joe Frogge
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
10/8/19 - Acknowledged in letter
|
|
|
Building Plan Review
|
Rejected
|
09/20/2019
|
09/17/2019
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
The permit for these suites is tied to an incomplete shell. Occupancy for the suites will not be granted until occupancy for shell has been granted.
Action required: Comment is for informational purposes.
|
|
Project cost
Corrective Action Required
The project cost, which is used to establish the permit fee, has not been provided.
Action required: Comment is for informational purposes.
|
|
Suite address
Corrective Action Required
This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located.
Action required: Comment is for informational purposes. This building has been assigned the address of 1980 SE Blue Pkwy. Please update your records.
The suites have been assigned the following numbers:
1100 - Bariatric
1200 - Neuro
1300 - GI
3100 - Cardiology
3200 - Surgery Clinic
3300 - Imaging
|
|
Code analysis required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Action required: Update code analysis to show correct construction type which is 1B.
10/1/19 - umm.. i was totally mistaken
|
|
Plan Submittal 2012 Codes
Corrective Action Required
All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit
Action required: Update code analysis to show correct accessibility code which is ICC/ANSI A117.1-2017
|
|
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Corrective Action Required
ICC A117.1-2017 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2.
Action required: Provide minimum 18" clearance at latch side of doors out of Dressing Rooms 3-310 & 3-311.
|
|
|
Licensed Contractors
|
Rejected
|
09/20/2019
|
09/17/2019
|
|
Joe Frogge
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
09/20/2019
|
09/11/2019
|
|
Michael Weissenbach
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
(Action Required)
Any modifications to the alarm system, provide three sets of PE stamped shop drawings.
|
|
Hazardous material identification
Corrective Action Required
2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5.
(Verified At Inspection)
Label all rooms
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
(Action Required)
Any modifications to the sprinkler system, provide three sets of PE stamped shop drawings.
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational Purposes)
Call (816)969-1300 to schedule testing.
|
|
|