Permit Application Status

PRCOM20192520


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20192520
Building Permit - Commercial
Certificate of Occupancy
Hannah Reese
NEW COMMERCIAL
NEW BUILDING FOR CAR DEALERSHIP WITH SINGLE CAR WASH BAY AND EQUIPMENT MEZZANINE
09/05/2019
12/20/2019
03/10/2020
01/28/2021
Locations
Contacts
Hannah Reese, Address:704 SE Oldham Ct  
SLAGGIE ARCHITECTS INC, Address:4600 MADISON AVE STE 350, Phone:(816) 756-1958 Ext:243  
CENTRIC CONSTRUCTION GROUP, Address:520 W PENNWAY STE 100, Phone:(816) 389-8300  
HENRY MILLER MECHANICAL LLC, Address:6609 ROYAL ST, SUITE 104, Phone:(816) 883-8818  
PHAZE ONE ELECTRIC, Address:19935 W 162ND ST, Phone:(913) 747-9093  
HENRY MILLER MECHANICAL LLC, Address:6609 ROYAL ST, SUITE 104, Phone:(816) 883-8818  
CWKELLER@SLAGGIE.COM  
UES dba GEOTECHNOLOGY LLC, Address:5055 ANTIOCH RD, Phone:(913) 438-1900  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 10/15/2019 12/20/2019
Joe Frogge
Final Development Plan
Resolved
12/20/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 10/10/19 - Acknowledged in letter
License Tax Application
Corrective Action Required
10/08/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 10/10/19 - Acknowledged in letter
Project cost
Resolved
10/16/2019

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. 10/10/19 - Acknowledged in letter
Accessibility - Turning space 603.2.1
Resolved
10/10/2019

ICC A117.1-2017 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Modify drawings to show 67" turning spaces.
Plumb - Cleanouts - Building sewer 708.3.2
Corrective Action Required
10/08/2019

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements Action required: Provide cleanouts near where sewer piping leaves foundation. 10/10/19 - Civil drawing referenced in letter not found in submittal. To be field verified.
Miscellaneous Correction
Resolved
10/10/2019

Light pole base references structural drawings for structural aspects but detail not found. Action required: Provide complete light pole base detail(s) that includes depth, diameter, reinforcement, etc.
Final Development Plan Review Approved 12/20/2019
Joe Frogge
Licensed Contractors Approved 11/19/2019 11/19/2019
Dawn Bell
LC - MEP Subs
Corrective Action Required
11/19/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/10/19 - Acknowledged in letter
Alarm Plan Review Released for Construction 11/13/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
11/13/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Licensed Contractors Rejected 10/15/2019 10/10/2019
Joe Frogge
LC - General Contractor
Resolved
10/16/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 10/10/19 - Acknowledged in letter
LC - MEP Subs
Corrective Action Required
10/08/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/10/19 - Acknowledged in letter
Fire Plan Review Approved with Conditions 10/15/2019 10/10/2019
Michael Weissenbach
Construction documents for fire alarm systems
Resolved
10/10/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for fire alarm system.
Address numbers required
Corrective Action Required
10/08/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Installation acceptance testing
Resolved
10/10/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule alarm testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
10/08/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Egress through intervening spaces.
Resolved
10/10/2019

2018 IFC 1016.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. (Action Required) Remove exit sign in corridor leading into storage area.
Duct smoke detectors
Corrective Action Required
10/08/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Verified At Inspection)
Door operations
Corrective Action Required
10/08/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Building Plan Review Rejected 09/19/2019 09/12/2019
Joe Frogge
Final Development Plan
Corrective Action Required
09/12/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Corrective Action Required
09/12/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Project cost
Corrective Action Required
09/12/2019

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes.
Accessibility - Turning space 603.2.1
Corrective Action Required
09/12/2019

ICC A117.1-2017 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Modify drawings to show 67" turning spaces.
Plumb - Cleanouts - Building sewer 708.3.2
Corrective Action Required
09/12/2019

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements Action required: Provide cleanouts near where sewer piping leaves foundation.
Miscellaneous Correction
Corrective Action Required
09/12/2019

Light pole base references structural drawings for structural aspects but detail not found. Action required: Provide complete light pole base detail(s) that includes depth, diameter, reinforcement, etc.
Licensed Contractors Rejected 09/19/2019 09/12/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
09/12/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
09/12/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 09/19/2019 09/10/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
09/10/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for fire alarm system.
Address numbers required
Corrective Action Required
09/10/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Installation acceptance testing
Corrective Action Required
09/10/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule alarm testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/10/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide one additional 2A10BC in new car delivery garage area.
Egress through intervening spaces.
Corrective Action Required
09/10/2019

2018 IFC 1016.2 Egress through intervening spaces. Egress through intervening spaces shall comply with this section. (Action Required) Remove exit sign in corridor leading into storage area.
Duct smoke detectors
Corrective Action Required
09/10/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Verified At Inspection) RTU-1 will require duct detection. CFM is greater than 2000.
Door operations
Corrective Action Required
09/10/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Commercial $12,000.00 $12,000.00 Paid 12/18/2019
8331507-Sewer Connection Fee $330.00 $330.00 Paid 12/18/2019
Commercial Excise Tax Fee $16,417.50 $16,417.50 Paid 12/18/2019
Additional Permit Fee $0.02 $0.02 Paid 12/18/2019
Not Ready Inspection Fee $50.00 $50.00 Paid 09/09/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 1/27/2020 1/27/2020 01/27/2020
Misc
Informational
01/27/2020
UFER SW CORNER , FOOTING WEST WALL LINE 9-10 M THRU D OK TO POUR
Footing Inspection - Commercial Partial 1/28/2020 (1:00) 1/28/2020 01/28/2020
Misc
Informational
01/27/2020
UFER SW CORNER , FOOTING WEST WALL LINE 9-10 M THRU D OK TO POUR 1/28/20 OK TO POUR FOOTING LINE 8 - 9 / K TO J 1/2 WAY TO H 2 PADS WITH (4) 14” BOLTS EA
Footing Inspection - Commercial Partial 2/3/2020 2/3/2020 02/03/2020
Misc
Informational
01/28/2020
UFER SW CORNER , FOOTING WEST WALL LINE 9-10 M THRU D OK TO POUR 1/28/20 OK TO POUR FOOTING LINE 8 - 9 / K TO J 1/2 WAY TO H 2 PADS WITH (4) 14” BOLTS EA 2/3/02 OK to pour footing A to H2 line 7- 8
Footing Inspection - Commercial Partial 2/4/2020 2/4/2020 02/04/2020
Misc
Informational
02/03/2020
UFER SW CORNER , FOOTING WEST WALL LINE 9-10 M THRU D OK TO POUR 1/28/20 OK TO POUR FOOTING LINE 8 - 9 / K TO J 1/2 WAY TO H 2 PADS WITH (4) 14” BOLTS EA 2/3/20OK to pour footing A to H2 line 7- 8 2/4/20 ok to pour K - 9
Footing Inspection - Commercial Partial 2/6/2020 (11:00) 2/6/2020 02/06/2020
Misc
Informational
02/04/2020
UFER SW CORNER , FOOTING WEST WALL LINE 9-10 M THRU D OK TO POUR 1/28/20 OK TO POUR FOOTING LINE 8 - 9 / K TO J 1/2 WAY TO H 2 PADS WITH (4) 14” BOLTS EA 2/3/20OK to pour footing A to H2 line 7- 8 2/4/20 ok to pour K - 9 2/6/20 ok to pour K-L 9 10’ to bulkhead
Footing Inspection - Commercial Partial 2/7/2020 (11:30) 2/7/2020 02/07/2020
Misc
Informational
02/06/2020
UFER SW CORNER , FOOTING WEST WALL LINE 9-10 M THRU D OK TO POUR 1/28/20 OK TO POUR FOOTING LINE 8 - 9 / K TO J 1/2 WAY TO H 2 PADS WITH (4) 14” BOLTS EA 2/3/20OK to pour footing A to H2 line 7- 8 2/4/20 ok to pour K - 9 2/6/20 ok to pour K-L 9 10’ to bulkhead 2/7/20 3 pads line 5 F.7, H , J , FOOTING C LINE 7-6, L LINE 8.2 - 5
Footing Inspection - Commercial Partial 2/10/2020 2/10/2020 02/10/2020
Misc
Informational
02/07/2020
UFER SW CORNER , FOOTING WEST WALL LINE 9-10 M THRU D OK TO POUR 1/28/20 OK TO POUR FOOTING LINE 8 - 9 / K TO J 1/2 WAY TO H 2 PADS WITH (4) 14” BOLTS EA 2/3/20OK to pour footing A to H2 line 7- 8 2/4/20 ok to pour K - 9 2/6/20 ok to pour K-L 9 10’ to bulkhead 2/7/20 3 pads line 5 F.7, H , J , FOOTING C LINE 7-6, L LINE 8.2 - 210/20 lines 1-5 lines F-A
Footing Inspection - Commercial Partial 2/11/2020 2/11/2020 02/11/2020
Misc
Informational
02/10/2020
UFER SW CORNER , FOOTING WEST WALL LINE 9-10 M THRU D OK TO POUR 1/28/20 OK TO POUR FOOTING LINE 8 - 9 / K TO J 1/2 WAY TO H 2 PADS WITH (4) 14” BOLTS EA 2/3/20OK to pour footing A to H2 line 7- 8 2/4/20 ok to pour K - 9 2/6/20 ok to pour K-L 9 10’ to bulkhead 2/7/20 3 pads line 5 F.7, H , J , FOOTING C LINE 7-6, L LINE 8.2 - 2/10/20 lines 1-5 lines F-A 2/11/20 Pad F 7.4 H line 4-1
Footing Inspection - Commercial Partial 2/19/2020 (1:00) 2/19/2020 02/19/2020
Misc
Informational
02/11/2020
UFER SW CORNER , FOOTING WEST WALL LINE 9-10 M THRU D OK TO POUR 1/28/20 OK TO POUR FOOTING LINE 8 - 9 / K TO J 1/2 WAY TO H 2 PADS WITH (4) 14” BOLTS EA 2/3/20OK to pour footing A to H2 line 7- 8 2/4/20 ok to pour K - 9 2/6/20 ok to pour K-L 9 10’ to bulkhead 2/7/20 3 pads line 5 F.7, H , J , FOOTING C LINE 7-6, L LINE 8.2 - 2/10/20 lines 1-5 lines F-A 2/11/20 Pad F 7.4 H line 4-1 2/19/20 line L 4-5 line H -4
Footing Inspection - Commercial Partial 2/20/2020 2/20/2020 02/20/2020
Misc
Informational
02/19/2020
UFER SW CORNER , FOOTING WEST WALL LINE 9-10 M THRU D OK TO POUR 1/28/20 OK TO POUR FOOTING LINE 8 - 9 / K TO J 1/2 WAY TO H 2 PADS WITH (4) 14” BOLTS EA 2/3/20OK to pour footing A to H2 line 7- 8 2/4/20 ok to pour K - 9 2/6/20 ok to pour K-L 9 10’ to bulkhead 2/7/20 3 pads line 5 F.7, H , J , FOOTING C LINE 7-6, L LINE 8.2 - 2/10/20 lines 1-5 lines F-A 2/11/20 Pad F 7.4 H line 4-1 2/19/20 line L 4-5 line H -4 2/20/20 line 2 L & J LINE M 4,5,8.2, 9 CANOPY PAD FOOTING FOOTING FRONT DOOR CORRECTION @ 2 LINE H TO G
Underslab Plumbing Inspection - Commercial Not Ready 3/27/2020 3/27/2020 03/27/2020
Underslab Plumbing Inspection - Commercial Partial 3/31/2020 3/31/2020 03/31/2020
Informational
03/31/2020
-ROOMS 126,125,124,1234,122,121,120,119,118,102 UDERSLAB OK TO COVER
Underslab Plumbing Inspection - Commercial Partial 4/1/2020 04/01/2020
Misc
Informational
04/01/2020
- UNDER SLAB ROOF DRAIN EXIT SW SIDE OF BLDG -
Underslab Plumbing Inspection - Commercial Partial 4/2/2020 4/2/2020 04/02/2020
Misc
Informational
04/01/2020
- UNDER SLAB ROOF DRAIN EXIT SW SIDE OF BLDG - 4/2/20 - car wash & maintainence bays -
Underslab Plumbing Inspection - Commercial Partial 4/3/2020 4/3/2020 04/03/2020
Misc
Informational
04/02/2020
- UNDER SLAB ROOF DRAIN EXIT SW SIDE OF BLDG - 4/2/20 - car wash & maintainence bays - - 4/3/20 trench drain in car wash bay -
Underslab Electrical Inspection - Commercial Partial 4/8/2020 4/8/2020 04/08/2020
Misc
Informational
04/08/2020
- CAR WASH, SERVICE BAYS, SALES FLOOR -
Underslab Electrical Inspection - Commercial Partial 4/10/2020 4/10/2020 04/10/2020
Misc
Informational
04/08/2020
- CAR WASH, SERVICE BAYS, SALES FLOOR - 4/10/20 - CONDUIT FOR FLOOR BOXES NEAR COLUMNS SALES FLOOR -
Piers/Caissons Inspection - Commercial Partial 4/22/2020 (8:00) 4/22/2020 04/22/2020
Misc
Informational
04/21/2020
- LIGHT POLE BASES (6) # 7 VERT W/ #3 CIRCULAR TIES (4) NORTH @ HWY 50 (3) MIDDLE LOT EAST OF BLDG (5) W OF OLDHAM (1) MIDDLE OF LOT
Piers/Caissons Inspection - Commercial Partial 4/23/2020 (1:30) 4/23/2020 at 1:22 PM 04/23/2020
Misc
Informational
04/22/2020
- LIGHT POLE BASES (6) # 7 VERT W/ #3 CIRCULAR TIES (4) NORTH @ HWY 50 (3) MIDDLE LOT EAST OF BLDG (5) W OF OLDHAM (1) MIDDLE OF LOT - - 4/23/20 (3) @ ENTRY TO SKATING RINK -
Piers/Caissons Inspection - Commercial Partial 4/28/2020 (10:00) 4/28/2020 at 10:20 AM 04/28/2020
Misc
Informational
04/23/2020
- LIGHT POLE BASES (6) # 7 VERT W/ #3 CIRCULAR TIES (4) NORTH @ HWY 50 (3) MIDDLE LOT EAST OF BLDG (5) W OF OLDHAM (1) MIDDLE OF LOT - - 4/23/20 (3) @ ENTRY TO SKATING RINK - - 4/28/20 (10 N OF ENTRY DRIVE, (3) NEAR SKATING RINK, (2) REAR OF BUILDING NEAR JOB TRAILER -
Rough Framing Inspection - Commercial Partial 5/8/2020 5/8/2020 05/08/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/08/2020
- NORTH ELEVATION (NEW CAR DELIVERY) METAL STUD FRAMING -
All Rough Inspection - Commercial Partial 5/15/2020 5/15/2020 05/15/2020
Misc
Informational
05/15/2020
EXTERIOR FRAMING SALES AREA UPPER AND LOWER STORE FRONTS
Rough Framing Inspection - Commercial Partial 5/22/2020 5/21/2020 05/21/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/08/2020
- NORTH ELEVATION (NEW CAR DELIVERY) METAL STUD FRAMING - -EXTERIOR CANOPY FRAMING
Underground Electrical Inspection - Commercial Partial 5/21/2020 5/21/2020 05/21/2020
Misc
Informational
05/21/2020
-CONDUIT FROM TRANSFORMER TO POLE-WEST SIDE
Underground Electrical Inspection - Commercial Partial 5/22/2020 5/22/2020 05/22/2020
Misc
Informational
05/21/2020
-CONDUIT FROM TRANSFORMER TO POLE-WEST SIDE -TRANSFORMER TO CT CAB
Rated Assembly Inspection Partial 6/2/2020 6/2/2020 06/02/2020
Misc
Informational
06/02/2020
-EXTERIOR SHEATHING OK TO COVER -
In-wall Inspection Partial 6/12/2020 6/12/2020 06/12/2020
Misc
Informational
06/12/2020
- INTERIOR FRAMING, PLUMBING & ELECTRICAL, ROOMS 103 THRU 110, & 119 THRU 122 -
In-wall Inspection Partial 6/17/2020 6/17/2020 06/17/2020
Misc
Informational
06/12/2020
- INTERIOR FRAMING, PLUMBING & ELECTRICAL, ROOMS 103 THRU 110, & 119 THRU 122 - - ROOMS 100,101, 116,117,118,123,124,125,126,127
Underground Electrical Inspection - Commercial Partial 6/19/2020 6/19/2020 06/19/2020
Misc
Informational
05/22/2020
-CONDUIT FROM TRANSFORMER TO POLE-WEST SIDE -TRANSFORMER TO CT CAB
Misc
Informational
06/19/2020
- 2ND CONDUIT FROM TRANSFORMER ON POLE NORTH SIDE AT HWY 50 TO CT CABINET @ REAR DOOR -
Footing Inspection - Commercial Partial 6/19/2020 (8:00) 6/19/2020 06/19/2020
Misc
Informational
02/20/2020
UFER SW CORNER , FOOTING WEST WALL LINE 9-10 M THRU D OK TO POUR 1/28/20 OK TO POUR FOOTING LINE 8 - 9 / K TO J 1/2 WAY TO H 2 PADS WITH (4) 14” BOLTS EA 2/3/20OK to pour footing A to H2 line 7- 8 2/4/20 ok to pour K - 9 2/6/20 ok to pour K-L 9 10’ to bulkhead 2/7/20 3 pads line 5 F.7, H , J , FOOTING C LINE 7-6, L LINE 8.2 - 2/10/20 lines 1-5 lines F-A 2/11/20 Pad F 7.4 H line 4-1 2/19/20 line L 4-5 line H -4 2/20/20 line 2 L & J LINE M 4,5,8.2, 9 CANOPY PAD FOOTING FOOTING FRONT DOOR CORRECTION @ 2 LINE H TO G
Misc
Informational
06/19/2020
- FOOTING FOR TRASH ENCLOSURE SW CORNER OF LOT PER PLAN -
Underground Electrical Inspection - Commercial Partial 6/23/2020 6/23/2020 06/23/2020
Misc
Informational
06/19/2020
-CONDUIT FROM TRANSFORMER TO POLE-WEST SIDE -TRANSFORMER TO CT CAB
Misc
Informational
06/19/2020
- 2ND CONDUIT FROM TRANSFORMER ON POLE NORTH SIDE AT HWY 50 TO CT CABINET @ REAR DOOR -
Misc
Informational
06/23/2020
- (4) DRIVEN GROUND RODS REAR DOOR AT METER CAN - - BUILDING STEEL STORAGE LOFT - - WATER ROOM 126 JANITOR CLOSET - - UFER IN FOOTING @ METER CAN -
Above Ceiling Inspection Partial 6/25/2020 6/25/2020 06/25/2020
Misc
Corrective Action Required
06/25/2020
- ABOVE CEILING ALL AREAS APPROVED( EXCEPT NEW CAR DELIVERY ) -
Above Ceiling Inspection Partial 6/26/2020 6/26/2020 06/26/2020
Misc
Informational
06/26/2020
- ABOVE CEILING ALL HARD LID AREAS APPROVED -
Electrical Service Inspection Passed 6/29/2020 6/29/2020 06/29/2020
Above Ceiling Inspection Partial 6/30/2020 6/30/2020 06/30/2020
Misc
Informational
06/26/2020
- ABOVE CEILING ALL HARD LID AREAS APPROVED - - CANOPY ELECTRICAL ROUGH LIGHTS/CAMERAS -
Gas Service Inspection - Commercial Failed 7/14/2020 07/14/2020
Misc
Corrective Action Required
07/14/2020
- PROVIDE PRESSURE ON GAS LINE FOR GAS TEST -
Gas Piping Inspection - Commercial Passed 7/14/2020 7/14/2020 07/14/2020
Gas Service Inspection - Commercial Passed 7/20/2020 7/20/2020 07/20/2020
Misc
Resolved
07/20/2020
Above Ceiling Inspection Passed 7/24/2020 7/24/2020 07/24/2020
Misc
Informational
06/30/2020
- ABOVE CEILING ALL HARD LID AREAS APPROVED - - CANOPY ELECTRICAL ROUGH LIGHTS/CAMERAS - - SUSPENDED CEILING AREAS APPROVED -
Piers/Caissons Inspection - Commercial Partial 7/28/2020 (1:00) 7/28/2020 07/28/2020
Misc
Informational
04/28/2020
- LIGHT POLE BASES (6) # 7 VERT W/ #3 CIRCULAR TIES (4) NORTH @ HWY 50 (3) MIDDLE LOT EAST OF BLDG (5) W OF OLDHAM (1) MIDDLE OF LOT - - 4/23/20 (3) @ ENTRY TO SKATING RINK - - 4/28/20 (10 N OF ENTRY DRIVE, (3) NEAR SKATING RINK, (2) REAR OF BUILDING NEAR JOB TRAILER -
Misc
Informational
07/28/2020
(10) bases w/ conduit for lights on car display pads in front of skating rink
Occupancy Inspection - Codes Commercial Failed 8/12/2020 08/12/2020
Misc
Corrective Action Required
08/12/2020
- NO OCCUPANCY INSPECTIONS PERFORMED - - OK TO INSTALL DESK & PARTITIONS -
Occupancy Inspection - Water Utilities Passed 9/9/2020 09/09/2020
Piers/Caissons Inspection - Commercial Passed 9/10/2020 09/10/2020
Misc
Informational
07/28/2020
- LIGHT POLE BASES (6) # 7 VERT W/ #3 CIRCULAR TIES (4) NORTH @ HWY 50 (3) MIDDLE LOT EAST OF BLDG (5) W OF OLDHAM (1) MIDDLE OF LOT - - 4/23/20 (3) @ ENTRY TO SKATING RINK - - 4/28/20 (10 N OF ENTRY DRIVE, (3) NEAR SKATING RINK, (2) REAR OF BUILDING NEAR JOB TRAILER -
Misc
Informational
07/28/2020
(10) bases w/ conduit for lights on car display pads in front of skating rink
In-wall Inspection Passed 9/10/2020 09/10/2020
Misc
Informational
06/17/2020
- INTERIOR FRAMING, PLUMBING & ELECTRICAL, ROOMS 103 THRU 110, & 119 THRU 122 - - ROOMS 100,101, 116,117,118,123,124,125,126,127
Footing Inspection - Commercial Passed 9/10/2020 09/10/2020
Misc
Informational
06/19/2020
UFER SW CORNER , FOOTING WEST WALL LINE 9-10 M THRU D OK TO POUR 1/28/20 OK TO POUR FOOTING LINE 8 - 9 / K TO J 1/2 WAY TO H 2 PADS WITH (4) 14” BOLTS EA 2/3/20OK to pour footing A to H2 line 7- 8 2/4/20 ok to pour K - 9 2/6/20 ok to pour K-L 9 10’ to bulkhead 2/7/20 3 pads line 5 F.7, H , J , FOOTING C LINE 7-6, L LINE 8.2 - 2/10/20 lines 1-5 lines F-A 2/11/20 Pad F 7.4 H line 4-1 2/19/20 line L 4-5 line H -4 2/20/20 line 2 L & J LINE M 4,5,8.2, 9 CANOPY PAD FOOTING FOOTING FRONT DOOR CORRECTION @ 2 LINE H TO G
Misc
Informational
06/19/2020
- FOOTING FOR TRASH ENCLOSURE SW CORNER OF LOT PER PLAN -
All Rough Inspection - Commercial Passed 9/10/2020 09/10/2020
Misc
Informational
05/15/2020
EXTERIOR FRAMING SALES AREA UPPER AND LOWER STORE FRONTS
Underslab Plumbing Inspection - Commercial Passed 9/10/2020 09/10/2020
Misc
Informational
04/03/2020
- UNDER SLAB ROOF DRAIN EXIT SW SIDE OF BLDG - 4/2/20 - car wash & maintainence bays - - 4/3/20 trench drain in car wash bay -
Underslab Electrical Inspection - Commercial Passed 9/10/2020 09/10/2020
Misc
Informational
04/10/2020
- CAR WASH, SERVICE BAYS, SALES FLOOR - 4/10/20 - CONDUIT FOR FLOOR BOXES NEAR COLUMNS SALES FLOOR -
Underground Electrical Inspection - Commercial Passed 9/10/2020 09/10/2020
Misc
Informational
06/23/2020
-CONDUIT FROM TRANSFORMER TO POLE-WEST SIDE -TRANSFORMER TO CT CAB
Misc
Informational
06/23/2020
- 2ND CONDUIT FROM TRANSFORMER ON POLE NORTH SIDE AT HWY 50 TO CT CABINET @ REAR DOOR -
Misc
Informational
06/23/2020
- (4) DRIVEN GROUND RODS REAR DOOR AT METER CAN - - BUILDING STEEL STORAGE LOFT - - WATER ROOM 126 JANITOR CLOSET - - UFER IN FOOTING @ METER CAN -
Rated Assembly Inspection Passed 9/10/2020 09/10/2020
Misc
Informational
06/02/2020
-EXTERIOR SHEATHING OK TO COVER -
Rough Framing Inspection - Commercial Passed 9/10/2020 09/10/2020
Rough Electrical Inspection - Commercial Passed 9/10/2020 09/10/2020
Rough Plumbing Inspection - Commercial Passed 9/10/2020 09/10/2020
Rough Mechanical Inspection - Commercial Passed 9/10/2020 09/10/2020
Miscellaneous Inspection Passed 4/1/2020 (A.M.) 9/10/2020 09/10/2020
Misc
Corrective Action Required
04/01/2020
-ROOMS 126,125,124,1234,122,121,120,119,118,102 UDERSLAB OK TO COVER STORM DRAIN:
Underground Plumbing Inspection - Commercial Passed 4/1/2020 09/10/2020
Occupancy Inspection - Engineering Failed 9/10/2020 09/10/2020
Misc
Corrective Action Required
09/10/2020
1. Remove and replace failed or ponding areas in parking lot. 2. Complete asphalt in entrance areas at CG-1 curb. 3. Complete drivable turf area. 4. Check on the elevation of the field inlet in the drivable turf area. May be too high and needs adjustment. 5. Remove card broad rap from street light in main parking lot in front. 6. Install erosion control devices through out project.
Occupancy Inspection - Codes Commercial Failed 9/10/2020 9/10/2020 09/10/2020
Misc
Corrective Action Required
08/12/2020
- NO OCCUPANCY INSPECTIONS PERFORMED - - OK TO INSTALL DESK & PARTITIONS -
Misc
Corrective Action Required
09/10/2020
- GFCI AT METER CAN - - GFCI WOMEN'S RESTROOM - - LABLE SERVICE PANEL BREAKERS - - PROVIDE PLUGS AT SERVICE PANEL OPEN SLOTS - - LABEL DISCONNECT RTU - - AIR COMPRESSOR DISCONNECT ACCESSIBLE - - PLUG KNOCKOUT JBOX ABOVE OVERHEAD DOOR - - LABLE MAIN DISCONNECT - - SWITH FOR HEATER AT CATWALK OVER 6'6" - - THRESHOLDS AT FRONT & REAR DOORS EXCEEDS 1/4" - - CHECK GROUNDING LIGHT POLES -
Occupancy Inspection - Planning Temporary C of O 9/11/2020 09/11/2020
Corrective Action Required
09/11/2020
Complete landscaping per the approved plan.
Occupancy Inspection - Codes Commercial Temporary C of O 9/15/2020 9/15/2020 09/15/2020
Misc
Corrective Action Required
09/10/2020
- NO OCCUPANCY INSPECTIONS PERFORMED - - OK TO INSTALL DESK & PARTITIONS -
Misc
Resolved
09/15/2020
Occupancy Inspection - Engineering Temporary C of O 9/15/2020 09/15/2020
Misc
Corrective Action Required
09/10/2020
1. Remove all forming from Curb inlets throughout project. 2.Remove plastic off of ADA Mat of Oldham Road. 3. Fill abandoned sewer area at entrance to skate rink. 4. Follow up with consultant engineer about existing elevation of field inlet. 5. Maintain erosion control until 70% vegetation has been established. 6. Finish landscaping.
Occupancy Inspection - Codes Commercial Temporary C of O 9/16/2020 09/16/2020
Misc
Resolved
09/16/2020
- NO OCCUPANCY INSPECTIONS PERFORMED - - OK TO INSTALL DESK & PARTITIONS -
Misc
Corrective Action Required
09/16/2020
Planning: Completion of landscaping Field Engineering: 1. Remove all forming from Curb inlets throughout project 2. Remove plastic off of ADA mat off of Oldham Rd 3. Fill abandoned sewer area at entrance to skate rink 4. Follow up with consultant engineer about existing elevation of field inlet 5. Maintain erosion control until 70% vegetation has been established 6. Finish Landscaping
Occupancy Inspection - Codes Commercial Temporary C of O 9/25/2020 9/25/2020 09/25/2020
Misc
Corrective Action Required
09/16/2020
Planning: Completion of landscaping Field Services 5. Maintain erosion control until 70% vegetation has been established
Occupancy Inspection - Planning Passed 9/25/2020 09/25/2020
Occupancy Inspection - Codes Commercial Temporary C of O 9/25/2020 9/25/2020 09/25/2020
Misc
Corrective Action Required
09/25/2020
Field Engineering 5. Maintain erosion control until 70% vegetation has been established
Occupancy Inspection - Engineering Temporary C of O 9/25/2020 09/28/2020
Misc
Corrective Action Required
09/10/2020
1. Remove and replace failed or ponding areas in parking lot. 2. Complete asphalt in entrance areas at CG-1 curb. 3. Complete drivable turf area. 4. Check on the elevation of the field inlet in the drivable turf area. May be too high and needs adjustment. 5. Remove card broad rap from street light in main parking lot in front. 6. Install erosion control devices through out project.
Misc
Corrective Action Required
09/28/2020
1.Need 70% vegetation to be established. 2.Install rip-rap around the field inlet to keep the mulch from washing down the storm pipe.
Occupancy Inspection - Fire Passed 9/10/2020 10/20/2020
Occupancy Inspection - Engineering Passed 1/27/2021 01/27/2021
Misc
Corrective Action Required
09/28/2020
1. Remove and replace failed or ponding areas in parking lot. 2. Complete asphalt in entrance areas at CG-1 curb. 3. Complete drivable turf area. 4. Check on the elevation of the field inlet in the drivable turf area. May be too high and needs adjustment. 5. Remove card broad rap from street light in main parking lot in front. 6. Install erosion control devices through out project.
Misc
Corrective Action Required
09/28/2020
1.Need 70% vegetation to be established. 2.Install rip-rap around the field inlet to keep the mulch from washing down the storm pipe.
Misc
Informational
01/27/2021
All items have been completed.
Occupancy Inspection - Codes Commercial Full C of O 1/28/2021 01/28/2021
Misc
Resolved
01/28/2021
Field Engineering 5. Maintain erosion control until 70% vegetation has been established
Documents & Images
Date Uploaded File Type Document Name
09/10/2019 Letter Fire Building Plan Review
09/12/2019 Letter DS P/R Corrections Document
10/10/2019 Letter Fire Building Plan Review
10/16/2019 Letter License Tax Bill
11/13/2019 Letter Fire (Alarm) Plan Review Notice
12/18/2019 special inspections
12/18/2019 Receipt Receipt for transaction: 2019-007753
12/18/2019 Receipt Receipt for transaction: 2019-007759
12/20/2019 Letter DS Building Permit
01/27/2020 Letter INSPECTION SUMMARY
01/28/2020 Letter INSPECTION SUMMARY
02/03/2020 Letter INSPECTION SUMMARY
02/04/2020 Letter INSPECTION SUMMARY
02/06/2020 Letter INSPECTION SUMMARY
02/07/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter INSPECTION SUMMARY
02/11/2020 Letter INSPECTION SUMMARY
02/19/2020 Letter INSPECTION SUMMARY
02/20/2020 Letter INSPECTION SUMMARY
03/31/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/02/2020 Letter INSPECTION SUMMARY
04/03/2020 Letter INSPECTION SUMMARY
04/08/2020 Letter INSPECTION SUMMARY
04/10/2020 Letter INSPECTION SUMMARY
04/22/2020 Letter INSPECTION SUMMARY
04/23/2020 Letter INSPECTION SUMMARY
04/28/2020 Letter INSPECTION SUMMARY
05/08/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter DS Building Permit
05/15/2020 Letter Codes Plan Review Conditions
05/21/2020 Letter INSPECTION SUMMARY
05/21/2020 Letter INSPECTION SUMMARY
05/22/2020 Letter INSPECTION SUMMARY
06/02/2020 Letter INSPECTION SUMMARY
06/12/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter INSPECTION SUMMARY
06/19/2020 Letter INSPECTION SUMMARY
06/19/2020 Letter INSPECTION SUMMARY
06/23/2020 Letter INSPECTION SUMMARY
06/26/2020 Letter INSPECTION SUMMARY
06/29/2020 Letter INSPECTION SUMMARY
06/29/2020 Letter INSPECTION SUMMARY
06/30/2020 Letter INSPECTION SUMMARY
07/14/2020 Letter INSPECTION SUMMARY
07/14/2020 Letter INSPECTION SUMMARY
07/20/2020 Letter INSPECTION SUMMARY
07/24/2020 Letter INSPECTION SUMMARY
07/28/2020 Letter INSPECTION SUMMARY
08/12/2020 Letter INSPECTION SUMMARY
08/19/2020 approved 8.19.20 aristocrat FDP-GradingPlan-Detail-REVISION-20200731
08/17/2020 approved 8.17.20 BOL-RF-24-4_5_1_1
08/17/2020 approved 8.17.20 Resized_20200817_151655
09/09/2020 Receipt Receipt for transaction: 2020-006094
09/10/2020 Letter INSPECTION SUMMARY
09/10/2020 Letter INSPECTION SUMMARY
09/10/2020 Letter INSPECTION SUMMARY
09/15/2020 J031621.02 Special Inspection Report No. 2
09/15/2020 J031621.02 Special Inspection Report No. 2
09/15/2020 Letter Codes Temporary Certificate of Occupancy
09/15/2020 Letter DE-Daily Inspection Summary
09/16/2020 Letter Codes Temporary Certificate of Occupancy
09/25/2020 Letter Codes Temporary Certificate of Occupancy
09/25/2020 Letter Codes Temporary Certificate of Occupancy
09/25/2020 Letter INSPECTION SUMMARY
09/28/2020 Letter DE-Daily Inspection Summary
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
11/02/2020 Letter INSPECTION SUMMARY
01/27/2021 Letter DE-Daily Inspection Summary
01/28/2021 Letter Codes Final Certificate of Occupancy
01/28/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home