Permit Application Status

PRCOM20191480


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20191480
Building Permit - Commercial
Certificate of Occupancy
MIDWEST DIVISION LSH LLC
ALTERATION COMMERCIAL
RENOVATIONS TO PHARMACY IN EXISTING HOSPITAL
06/07/2019
07/23/2019
12/15/2019
11/07/2019
Locations
Contacts
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
LEE'S SUMMIT MEDICAL CENTER, Address:2100 SE BLUE PKWY, Phone:(816) 282-5000  
MOODY NOLAN INC, Address:300 SPRUCE ST, Phone:(614) 280-1366  
PM CONTRACTING INC, Address:4015 E 143RD ST, Phone:(816) 318-9844  
HEARTLAND ELECTRIC CORPORATION, Address:947 LOCUST HILL CIR, Phone:(816) 318-8500  
LEXINGTON PLUMBING & HEATING, Address:1620 TROOST AVE, Phone:(816) 231-2254  
TIMOTHY.MCGINNIS@HCAMIDWEST.COM  
LYTLE CONSTRUCTION INC, Address:18505 E 163RD ST, Phone:(816) 524-7275  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 08/05/2019
Michael Weissenbach
Alarm Plan Review Released for Construction 07/23/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
07/23/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a fire alarm test. Life safety must pass before a final can be scheduled.
Fire Plan Review Approved 07/25/2019 07/23/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
07/18/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings of any modifications to be done to the fire alarm system.
Hazardous material identification
Corrective Action Required
07/18/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. ACTION REQUIRED:(verified at inspection) HD compounding and non HD compounding areas shall be labeled with appropriate hazardous materials labeling.
Tenant identification
Corrective Action Required
07/18/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. ACTION REQUIRED:(verified at inspection) All rooms shall be identified with room use, readable from the corridors.
Construction documents - Fire protection systems
Corrective Action Required
07/18/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings of any modification to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
07/18/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Testing of any modifications done to the fire alarm system will be required prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300.
Portable fire extinguishers - general
Corrective Action Required
07/18/2019

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide one 2A-10BC fire extinguisher for the pharmacy area if (not existing). Fire extinguisher to be mounted on a wall or in a extinguisher cabinet on a normal path of travel close to an exit.
Miscellaneous Correction
Resolved
07/23/2019

Compuonding exhaust hoods ACTION REQUIRED: provide information bout the exhaust hood systems for the compounding areas. Compounding areas shall meet the USP 795,797,800 specs. Provide manufacturers spec sheets on the exhaust systems.
Building Plan Review Approved 07/25/2019 07/18/2019
Joe Frogge
License Tax Application
Resolved
07/18/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Plan Submittal 2012 Codes
Resolved
07/18/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit Action required: Update code references.
Miscellaneous Correction
Resolved
07/18/2019

Only one copy of spec was submitted. Action required: Provide additional spec book.
Miscellaneous Correction
Resolved
07/18/2019

2018 IMC 510.6.5 Makeup air. Makeup air shall be provided at a rate approximately equal to the rate that air is exhausted by the hazardous exhaust system. Makeup air intakes shall be located in accordance with Section 401.1. Action required: Demonstrate how makeup air is accomplished at hazardous exhaust. 7/18/19 - addressed in letter
Licensed Contractors Approved 07/18/2019 07/18/2019
Joe Frogge
LC - General Contractor
Resolved
07/18/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
07/18/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 06/19/2019 06/17/2019
Joe Dir
Fire Plan Review Rejected 06/19/2019 06/17/2019
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
06/17/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide shop drawings of any modifications to be done to the fire alarm system.
Hazardous material identification
Corrective Action Required
06/17/2019

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. ACTION REQUIRED:(verified at inspection) HD compounding and non HD compounding areas shall be labeled with appropriate hazardous materials labeling.
Tenant identification
Corrective Action Required
06/17/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. ACTION REQUIRED:(verified at inspection) All rooms shall be identified with room use, readable from the corridors.
Construction documents - Fire protection systems
Corrective Action Required
06/17/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide shop drawings of any modification to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
06/17/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Testing of any modifications done to the fire alarm system will be required prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300.
Portable fire extinguishers - general
Corrective Action Required
06/17/2019

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide one 2A-10BC fire extinguisher for the pharmacy area if (not existing). Fire extinguisher to be mounted on a wall or in a extinguisher cabinet on a normal path of travel close to an exit.
Miscellaneous Correction
Resolved
07/23/2019

Compuonding exhaust hoods ACTION REQUIRED: provide information bout the exhaust hood systems for the compounding areas. Compounding areas shall meet the USP 795,797,800 specs. Provide manufacturers spec sheets on the exhaust systems.
Building Plan Review Rejected 06/19/2019 06/13/2019
Joe Frogge
License Tax Application
Corrective Action Required
06/13/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Plan Submittal 2012 Codes
Corrective Action Required
06/13/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit Action required: Update code references.
Miscellaneous Correction
Corrective Action Required
06/13/2019

Only one copy of spec was submitted. Action required: Provide additional spec book.
Miscellaneous Correction
Corrective Action Required
06/13/2019

2018 IMC 510.6.5 Makeup air. Makeup air shall be provided at a rate approximately equal to the rate that air is exhausted by the hazardous exhaust system. Makeup air intakes shall be located in accordance with Section 401.1. Action required: Demonstrate how makeup air is accomplished at hazardous exhaust.
Licensed Contractors Rejected 06/19/2019 06/13/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
06/13/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
06/13/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $596.80 $596.80 Paid 07/23/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 7/26/2019 7/26/2019 07/26/2019
FIRST FLOOR
Corrective Action Required
07/26/2019
The Following Areas are Approved: 1-PY1090 WALLS
In-wall Inspection Partial 8/20/2019 8/20/2019 08/20/2019
FIRST FLOOR
Corrective Action Required
07/26/2019
The Following Areas are Approved: 1-PY1090 WALLS. rooms 1 - py1087 and 1 -py1084.
Final Inspection - Commercial Partial 9/25/2019 09/25/2019
Misc
Corrective Action Required
09/25/2019
PARTIAL ONLY- ROOMS 1083-1087 OK TO OCCUOY FOR PHASE 3 CONSTUCTION TO TAKE PLACE. FULL FINAL ON ALL AREAS WHEN PHASE 3 IS COMPLETE
In-wall Inspection Partial 10/3/2019 10/3/2019 10/03/2019
FIRST FLOOR
Corrective Action Required
08/20/2019
The Following Areas are Approved: 1-PY1090 WALLS. rooms 1 - py1087 and 1 -py1084. wall rough at 1088- ok to rock ceiling. inspect all above ceiling at next inspection.
Above Ceiling Inspection Partial 11/1/2019 11/1/2019 at 1:50 PM 11/01/2019
Misc
Partial Correction
11/01/2019
ABOVE-CEILING-OK TO COVER: -ROOMS 1-PY1088, 1-PY1089, AND 1-PY1090
Occupancy Inspection - Fire Passed 11/7/2019 11/7/2019 11/07/2019
Final Inspection - Commercial Passed 11/7/2019 11/7/2019 11/07/2019
Misc
Resolved
11/07/2019
PARTIAL ONLY- ROOMS 1083-1087 OK TO OCCUOY FOR PHASE 3 CONSTUCTION TO TAKE PLACE. FULL FINAL ON ALL AREAS WHEN PHASE 3 IS COMPLETE
Above Ceiling Inspection Passed 11/07/2019
Misc
Resolved
11/07/2019
ABOVE-CEILING-OK TO COVER: -ROOMS 1-PY1088, 1-PY1089, AND 1-PY1090
Occupancy Inspection - Codes Commercial Full C of O 11/07/2019
Documents & Images
Date Uploaded File Type Document Name
06/11/2019 Letter License Tax Not Applicable
06/17/2019 Letter Fire Building Plan Review
06/18/2019 Letter DS P/R Corrections Document
07/23/2019 Letter Fire Building Plan Review
07/23/2019 Letter Fire (Alarm) Plan Review Notice
07/23/2019 Receipt Receipt for transaction: 2019-005012
07/23/2019 Letter Codes Plan Review Conditions
07/23/2019 Letter DS Building Permit
07/26/2019 Letter INSPECTION SUMMARY
08/05/2019 Letter Fire (Sprinkler) Plan Review
08/20/2019 Letter INSPECTION SUMMARY
09/25/2019 Letter INSPECTION SUMMARY
10/03/2019 Letter INSPECTION SUMMARY
11/01/2019 Letter INSPECTION SUMMARY
11/07/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home