Permit Application Status

PRCOM20191371


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20191371
Building Permit - Commercial
Certificate of Occupancy
Summit Development Co
CHANGE OF TENANT
TENANT FINISH FOR LIQUOR STORE **invite planner to final to verify screening
05/29/2019
07/09/2019
12/02/2019
10/21/2019
Locations
Contacts
Summit Development Co, Address:700 W 47th St Ste 200  
STEPHEN MASLAN & COMPANY, Address:8011 PASEO, Phone:(816) 444-6260  
HD ENGINEERING & DESIGN INC, Address:11656 W 75TH ST, Phone:(913) 631-2222  
CHIEF HEATING & COOLING INC, Address:920 NW TECHNOLOGY DR, Phone:(816) 246-4646  
PRECISE ELECTRIC LLC, Address:3205 STEEL CIR, Phone:(816) 529-1799  
SNAKE N ROOTER, Address:3370 NE RALPH POWELL RD, Phone:(816) 554-3337  
LIQUORHOUZZ@GMAIL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 08/14/2019
Michael Weissenbach
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
08/14/2019

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. (Action Required) Current annual sprinkler tag to be on the riser.
Sprinkler Plan Review Released for Construction 08/10/2019
Michael Weissenbach
Licensed Contractors Approved 07/01/2019 07/08/2019
Joe Frogge
LC - General Contractor
Resolved
07/05/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
07/08/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 7/5/19 - mechanical contractor required
Building Plan Review Approved with Conditions 07/09/2019 07/05/2019
Joe Frogge
Bldg - Types I and II construction allowable materials 602.2
Resolved
07/05/2019

2012 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Specify compliant wall construction materials. Wood is not allowed in Type IIB.
Screening - Ground mounted equipment
Corrective Action Required
07/01/2019

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. 6/21/19 - reuse of existing non-compliant screening materials approved by Hector S. To be field verified.
Fire Plan Review Approved with Conditions 07/09/2019 07/03/2019
Michael Weissenbach
Address numbers required
Corrective Action Required
07/01/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address all doors leading into the business.
Construction documents - Fire protection systems
Corrective Action Required
07/01/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action required) Provide shop drawings for fire sprinkler modifications. Coolers will need to have protection.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
07/01/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide 2 2A10BC fire extinguishers
Door operations
Corrective Action Required
07/01/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified at inspection)
Fire Plan Review Approved with Conditions 06/10/2019 06/04/2019
Michael Weissenbach
Address numbers required
Corrective Action Required
06/04/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Action required) Address all doors leading into the business.
Construction documents - Fire protection systems
Corrective Action Required
06/04/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action required) Provide shop drawings for fire sprinkler modifications. Coolers will need to have protection.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
06/04/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action required) Provide 2 2A10BC fire extinguishers
Door operations
Corrective Action Required
06/04/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified at inspection)
Building Plan Review Rejected 06/10/2019 05/31/2019
Joe Frogge
Bldg - Types I and II construction allowable materials 602.2
Corrective Action Required
05/31/2019

2012 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Specify compliant wall construction materials. Wood is not allowed in Type IIB.
Screening - Ground mounted equipment
Corrective Action Required
05/31/2019

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. 6/21/19 - reuse of existing non-compliant screening materials approved by Hector S. To be field verified.
Licensed Contractors Rejected 06/10/2019 05/31/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
05/31/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
05/31/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $44.00 $44.00 Paid 07/09/2019
8331507-Sewer Connection Fee $30.00 $30.00 Paid 07/09/2019
7232302-Commercial License Tax Fee $7,267.50 $7,267.50 Paid 07/05/2019
$7,267.50
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Failed 8/6/2019 8/6/2019 08/06/2019
Misc
Corrective Action Required
08/06/2019
Color code neutral to panel. ground water line if accessible.
Electrical Service Inspection Passed 8/7/2019 8/7/2019 08/07/2019
Misc
Resolved
08/07/2019
All Rough Inspection - Commercial Failed 10/8/2019 10/08/2019
Misc
Corrective Action Required
10/08/2019
Pre-final inspection- 205 se Melody ln 1.Open up junction boxes for inspection of all grounds at ac units. Exterior. 2. Label rear doors with 205-and remove exit sign on south end. 3. Note: No wall inspection for shop sink in wall. 4. Install Vertical grab bars for bathrooms. 5. Provide open front toilet seats. 6. Vanity sinks for restrooms at 37”max-34". 7. Mirrors over 40”, set at 46”. 8. Install correct handicap signs at both restrooms. 9. Blow off pipe for water heater needs to extend to ground on exterior of building. 10. Install auxiliary pan under water heater. 11. Vent both bath fans to exterior. 12. Install non absorbent paint or wall covering in both bathrooms. 13. Open wiring in beer cave for Ac unit. 14. Seal exterior penetrations in CMU block walls. 15. Open up junctions boxes at POS for inspection. 16. No inspection of raised floor system , open 2 junction boxes on POS for inspection. 17. provide approved POS height counter top for sales. Center counter is over maximum height. see ANSI A117 or contact the architect.
Occupancy Inspection - Fire Failed 10/17/2019 10/17/2019
Occupancy Inspection - Codes Commercial Failed 10/17/2019 10/17/2019
Misc
Corrective Action Required
10/17/2019
Pre-final inspection- 205 se Melody ln 4. Install Vertical grab bars for bathrooms, rear grab bar. 9. Blow off pipe for water heater needs to extend to ground on exterior of building. INCORRECT PIPE USED. 10. Install auxiliary pan under water heater. PIPE DOWN TO FLOOR 17. Provide approved POS height counter top for sales. Center counter is over maximum height. see ANSI A117 or contact the architect. counter installed is over 36" -additional counter does not meet code.
Occupancy Inspection - Fire Passed 10/21/2019 10/21/2019 10/21/2019
Occupancy Inspection - Codes Commercial Full C of O 10/21/2019 10/21/2019 10/21/2019
Misc
Corrective Action Required
10/18/2019
All items resolved, ok for CofO
Documents & Images
Date Uploaded File Type Document Name
06/04/2019 Letter Fire Building Plan Review
06/05/2019 Letter DS P/R Corrections Document
06/21/2019 Fwd Liquor Houzz - plan review PRCOM20191371
07/03/2019 Letter Fire Building Plan Review
07/05/2019 Letter License Tax Bill
07/08/2019 Letter Codes Plan Review Conditions
07/09/2019 Receipt Receipt for transaction: 2019-004666
07/09/2019 Letter Codes Building Permit
08/06/2019 Letter INSPECTION SUMMARY
08/07/2019 Letter INSPECTION SUMMARY
08/10/2019 Letter Fire (Sprinkler) Plan Review
08/14/2019 Letter Fire (Sprinkler) Plan Review
10/08/2019 Letter INSPECTION SUMMARY
10/17/2019 Letter INSPECTION SUMMARY
10/21/2019 Letter Field Certificate of Occupancy
10/21/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home