Permit Application Status

PRCOM20191001


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20191001
Building Permit - Commercial
Certificate of Occupancy
PHILLIPS REIS LLC
ADDITION COMMERCIAL
ADDITION TO EXISTING FACTORY
04/19/2019
05/28/2019
11/10/2019
07/29/2022
Locations
Contacts
TEAGUE CONSTRUCTION INC, Address:4220 MAIN ST, Phone:(816) 763-1455  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD, Phone:(816) 943-8513  
APPLE ELECTRIC INTEGRATED SOLUTIONS INC, Address:PO BOX 998, Phone:(913) 837-5285  
CL HOWERTON ENTERPRISES LLC, Address:224 NW AA HWY, Phone:(816) 237-6338  
CL ARCHITECTURE (CRAIG LUEBBERT), Address:396 SW WINTERGARDEN, Phone:(816) 536-3472  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
PHILLIPS REIS LLC, Address:1440 SE BROADWAY DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 11/11/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
11/11/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Information Purposes) Call (816)969-1300 to schedule alarm testing
Sprinkler Plan Review Released for Construction 09/18/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
09/18/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) A hydrostatic test will be required. Call (816)969-1300 to schedule.
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
09/18/2019

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. (Informational Purposes) System to remain operational in existing building during construction.
Fire Plan Review Approved with Conditions 05/16/2019 08/06/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
08/06/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide three sets of PE stamped shop drawings of the modifications to be done to the fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
08/06/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide three sets of PE stamped shop drawings of the modifications to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
08/06/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field testing and acceptance testing of the fire sprinkler and fire alarm systems will be required to be completed prior to the final occupancy inspection contact the fire department to schedule testing. (816)969-1300.
Portable fire extinguishers - general
Corrective Action Required
08/06/2019

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide one 2A-10BC fire extinguisher for every 6,000 sq feet of useable space. Extingusihers are to place close to exits and placed to have a 75' travel distance to an extingusiher.
Duct smoke detectors
Corrective Action Required
08/06/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. ACTION REQUIRED:(verified at inspection) All AHU's producing over 2,000 CFM are required to have duct detection installed and monitored by the buildings fire alarm system.
Panic and fire exit hardware
Corrective Action Required
08/06/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. ACTION REQUIRED:(verified at inspection) All marked exits shall have panic hardware installed.
Door operations
Corrective Action Required
08/06/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. ACTION REQUIRED:(verified at inspection) No keyed locks on the egress side (interior) of an exit.
Final Development Plan Review Approved 05/24/2019
Joe Frogge
Building Plan Review Approved with Conditions 05/16/2019 05/21/2019
Mike Weisenborn
Final Development Plan
Resolved
05/24/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 5/2/19 - not addressed 5/10/19- acknowledged in letter
Miscellaneous Correction
Resolved
05/10/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 5/2/19 - copy of contract provided. We need the actual letter of responsibility that claims responsibility and lists inspections to be performed.
Plan Submittal 2012 Codes
Resolved
05/10/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Provide updated code analysis. 5/2/19 - Fire Code is 2018 as well.
Accessibility - Turning space 603.2.1
Resolved
05/10/2019

ICC A117.1-2017 Section 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for additional information) Action required: Update restroom designs and references to comply. 5/2/19 - Turning radius is now compliant but to accomplish this the ambulatory stall was moved into non-compliance. Provide minimum 34" clear per ICC/ANSI 604.10.
NEC - Equipment outlet 210.63
Resolved
05/10/2019

2017 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Update plans to demonstrate compliance. 5/2/19 - Singe receptacle moved to cover distant unit but now the others are not covered. (btw - elec & mech plans don't really match dimensionally which complicates this part of review)
Screening - Ground mounted equipment
Corrective Action Required
05/24/2019

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how all mechanical equipment will be screened from all 4 sides per referenced UDO section. (landscaping is shown on FDP but those plans do not match M drawings) 5/2/19 - not addressed 5/10/19 - 8' fencing not allowed unless approved by Planning. Vinyl not allowed. (note: if Planning Dept approves 8' fence, engineer of record must design piers and connections) 5/24/19 - deferred to construction. Planning has not approved alternate material nor the request for 3 sided screening.
Miscellaneous Correction
Resolved
05/10/2019

Some ductwork installed outside of thermal envelope. Action required: Specify duct insulation at exterior. (minimum R-8) 5/2/19 - not addressed. Several note references have been added but there are no notes to reference.
Fire Plan Review Approved with Conditions 05/16/2019 05/14/2019
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
05/09/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide three sets of PE stamped shop drawings of the modifications to be done to the fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
05/09/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide three sets of PE stamped shop drawings of the modifications to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
05/09/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field testing and acceptance testing of the fire sprinkler and fire alarm systems will be required to be completed prior to the final occupancy inspection contact the fire department to schedule testing. (816)969-1300.
Portable fire extinguishers - general
Corrective Action Required
05/09/2019

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide one 2A-10BC fire extinguisher for every 6,000 sq feet of useable space. Extingusihers are to place close to exits and placed to have a 75' travel distance to an extingusiher.
Duct smoke detectors
Corrective Action Required
05/09/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. ACTION REQUIRED:(verified at inspection) All AHU's producing over 2,000 CFM are required to have duct detection installed and monitored by the buildings fire alarm system.
Panic and fire exit hardware
Corrective Action Required
05/09/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. ACTION REQUIRED:(verified at inspection) All marked exits shall have panic hardware installed.
Door operations
Corrective Action Required
05/09/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. ACTION REQUIRED:(verified at inspection) No keyed locks on the egress side (interior) of an exit.
Special Inspections Review Approved 05/10/2019
Joe Frogge
Licensed Contractors Approved 05/09/2019 05/09/2019
Joe Frogge
Fire Plan Review Approved with Conditions 05/09/2019 05/03/2019
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
05/02/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide three sets of PE stamped shop drawings of the modifications to be done to the fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
05/02/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide three sets of PE stamped shop drawings of the modifications to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
05/02/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field testing and acceptance testing of the fire sprinkler and fire alarm systems will be required to be completed prior to the final occupancy inspection contact the fire department to schedule testing. (816)969-1300.
Portable fire extinguishers - general
Corrective Action Required
05/02/2019

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide one 2A-10BC fire extinguisher for every 6,000 sq feet of useable space. Extingusihers are to place close to exits and placed to have a 75' travel distance to an extingusiher.
Duct smoke detectors
Corrective Action Required
05/02/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. ACTION REQUIRED:(verified at inspection) All AHU's producing over 2,000 CFM are required to have duct detection installed and monitored by the buildings fire alarm system.
Panic and fire exit hardware
Corrective Action Required
05/02/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. ACTION REQUIRED:(verified at inspection) All marked exits shall have panic hardware installed.
Door operations
Corrective Action Required
05/02/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. ACTION REQUIRED:(verified at inspection) No keyed locks on the egress side (interior) of an exit.
Building Plan Review Rejected 05/09/2019 05/02/2019
Joe Frogge
Final Development Plan
Corrective Action Required
05/02/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 5/2/19 - not addressed
Miscellaneous Correction
Corrective Action Required
05/02/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 5/2/19 - copy of contract provided. We need the actual letter of responsibility that claims responsibility and lists inspections to be performed.
Plan Submittal 2012 Codes
Corrective Action Required
05/02/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Provide updated code analysis. 5/2/19 - Fire Code is 2018 as well.
Accessibility - Turning space 603.2.1
Corrective Action Required
05/02/2019

ICC A117.1-2017 Section 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for additional information) Action required: Update restroom designs and references to comply. 5/2/19 - Turning radius is now compliant but to accomplish this the ambulatory stall was moved into non-compliance. Provide minimum 34" clear per ICC/ANSI 604.10.
Accessibility - Vertical clearance 307.4
Resolved
05/02/2019

ICC A117.1-2017 Section 307.4 Vertical Clearance. Vertical clearance shall be 80 inches minimum. Rails or other barriers shall be provided where the vertical clearance is less than 80 inches. The leading edge of such rails or barrier shall be located 27 inches maximum above the floor. Action required: Modify documents to demonstrate how this requirement will be met. Action required: Provide barrier or other approved means under new stairs.
NEC - Equipment outlet 210.63
Corrective Action Required
05/02/2019

2017 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Update plans to demonstrate compliance. 5/2/19 - Singe receptacle moved to cover distant unit but now the others are not covered. (btw - elec & mech plans don't really match dimensionally which complicates this part of review)
Miscellaneous Correction
Resolved
05/02/2019

2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Modify foundation details to show minimum 36" frost protection at all locations. Ref: Dock, pit leveler, pilasters, etc.
Screening - Ground mounted equipment
Corrective Action Required
05/02/2019

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how all mechanical equipment will be screened from all 4 sides per referenced UDO section. (landscaping is shown on FDP but those plans do not match M drawings) 5/2/19 - not addressed
Miscellaneous Correction
Corrective Action Required
05/02/2019

Some ductwork installed outside of thermal envelope. Action required: Specify duct insulation at exterior. (minimum R-8) 5/2/19 - not addressed. Several note references have been added but there are no notes to reference.
Licensed Contractors Approved 05/09/2019 05/02/2019
Joe Frogge
Building Plan Review Rejected 05/03/2019 04/24/2019
Joe Frogge
Final Development Plan
Corrective Action Required
04/24/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
04/24/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Plan Submittal 2012 Codes
Corrective Action Required
04/24/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Provide updated code analysis.
Accessibility - Turning space 603.2.1
Corrective Action Required
04/24/2019

ICC A117.1-2017 Section 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for additional information) Action required: Update restroom designs and references to comply.
Accessibility - Vertical clearance 307.4
Corrective Action Required
04/24/2019

ICC A117.1-2017 Section 307.4 Vertical Clearance. Vertical clearance shall be 80 inches minimum. Rails or other barriers shall be provided where the vertical clearance is less than 80 inches. The leading edge of such rails or barrier shall be located 27 inches maximum above the floor. Action required: Modify documents to demonstrate how this requirement will be met. Action required: Provide barrier or other approved means under new stairs.
NEC - Equipment outlet 210.63
Corrective Action Required
04/24/2019

2017 NEC 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means.
Miscellaneous Correction
Corrective Action Required
04/24/2019

2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Modify foundation details to show minimum 36" frost protection at all locations. Ref: Dock, pit leveler, pilasters, etc.
Screening - Ground mounted equipment
Corrective Action Required
04/24/2019

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how all mechanical equipment will be screened from all 4 sides per referenced UDO section. (landscaping is shown on FDP but those plans do not match M drawings)
Miscellaneous Correction
Corrective Action Required
04/24/2019

Some ductwork installed outside of thermal envelope. Action required: Specify duct insulation at exterior. (minimum R-8)
Fire Plan Review Approved with Conditions 05/03/2019 04/23/2019
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
04/23/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide three sets of PE stamped shop drawings of the modifications to be done to the fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
04/23/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide three sets of PE stamped shop drawings of the modifications to be done to the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
04/23/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field testing and acceptance testing of the fire sprinkler and fire alarm systems will be required to be completed prior to the final occupancy inspection contact the fire department to schedule testing. (816)969-1300.
Portable fire extinguishers - general
Corrective Action Required
04/23/2019

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED:(verified at inspection) Provide one 2A-10BC fire extinguisher for every 6,000 sq feet of useable space. Extingusihers are to place close to exits and placed to have a 75' travel distance to an extingusiher.
Duct smoke detectors
Corrective Action Required
04/23/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. ACTION REQUIRED:(verified at inspection) All AHU's producing over 2,000 CFM are required to have duct detection installed and monitored by the buildings fire alarm system.
Panic and fire exit hardware
Corrective Action Required
04/23/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. ACTION REQUIRED:(verified at inspection) All marked exits shall have panic hardware installed.
Door operations
Corrective Action Required
04/23/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. ACTION REQUIRED:(verified at inspection) No keyed locks on the egress side (interior) of an exit.
Licensed Contractors Approved 04/19/2019 04/19/2019
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $6,370.00 $6,370.00 Paid 05/21/2019
8331507-Sewer Connection Fee $390.00 $390.00 Paid 05/21/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 6/14/2019 6/14/2019 at 11:30 AM 06/14/2019
Misc
Corrective Action Required
06/14/2019
Grid line middle of 8-9 A-h Grid line h from 9- 4.5 Grid line h-a on 9 4.4 from h to l OK TO POUR
Footing Inspection - Commercial Partial 6/18/2019 (2:00) 6/18/2019 at 1:45 PM 06/18/2019
Misc
Partial Correction
06/18/2019
Grid line middle of 8-9 A-h Grid line h from 9- 4.5 Grid line h-a on 9 4.4 from h to l OK TO POUR A LINE APPROVED TO POUR FROM 1 LINE TO 6.5 LINE
Footing Inspection - Commercial Partial 6/21/2019 6/25/2019 06/25/2019
Misc
Partial Correction
06/18/2019
Grid line middle of 8-9 A-h Grid line h from 9- 4.5 Grid line h-a on 9 4.4 from h to l OK TO POUR A LINE APPROVED TO POUR FROM 1 LINE TO 6.5 LINE 1 line to the E line arroved
Footing Inspection - Commercial Partial 6/27/2019 6/27/2019 06/27/2019
Misc
Partial Correction
06/25/2019
Grid line middle of 8-9 A-h Grid line h from 9- 4.5 Grid line h-a on 9 4.4 from h to l OK TO POUR A LINE APPROVED TO POUR FROM 1 LINE TO 6.5 LINE 1 line to the E line arroved 9 interior iso pads approved
Footing Inspection - Commercial Partial 6/28/2019 06/28/2019
Misc
Partial Correction
06/27/2019
Grid line middle of 8-9 A-h Grid line h from 9- 4.5 Grid line h-a on 9 4.4 from h to l OK TO POUR A LINE APPROVED TO POUR FROM 1 LINE TO 6.5 LINE 1 line to the E line arroved 9 interior iso pads approved
Misc
Corrective Action Required
06/28/2019
North wall to east corner; south to bulk head next to existing building.
Underground Electrical Inspection - Commercial Passed 6/28/2019 6/28/2019 06/28/2019
Footing Inspection - Commercial Partial 7/1/2019 7/1/2019 07/01/2019
Misc
Partial Correction
06/28/2019
PERIMTER FOOTING ALL APPROVED TO POUR 9 interior iso pads approved
Misc
Resolved
07/01/2019
North wall to east corner; south to bulk head next to existing building.
Piers/Caissons Inspection - Commercial Passed 7/11/2019 07/11/2019
Rough Plumbing Inspection - Commercial Passed 7/12/2019 7/12/2019 07/12/2019
All Rough Inspection - Commercial Passed 7/12/2019 7/12/2019 07/12/2019
Underslab Electrical Inspection - Commercial Passed 07/12/2019
Underground Electrical Inspection - Commercial Partial 8/28/2019 8/29/2019 08/29/2019
Misc
Informational
08/29/2019
2 light pole bases on north and south side of new parking lot approved
Footing Inspection - Commercial Partial 9/27/2019 9/27/2019 09/27/2019
Misc
Partial Correction
07/01/2019
PERIMTER FOOTING ALL APPROVED TO POUR 9 interior iso pads approved ——9/27/19 inspection The 15’ section of stoop at the NE corner of the building is approved to poor
Rough Electrical Inspection - Commercial Partial 10/8/2019 10/8/2019 10/08/2019
Misc
Informational
10/08/2019
All exterior wall electrical boxes are approved, need to cover ASAP as the MC lines are not rated to be outside in the weather, rain, etc. ok to cover
In-wall Inspection Passed 10/18/2019 10/18/2019 10/18/2019
Electrical Service Inspection Passed 11/1/2019 11/01/2019
Misc
Informational
11/01/2019
Ok to release
Above Ceiling Inspection Passed 11/27/2019 11/27/2019 11/27/2019
Alarm Test Passed 12/6/2019 12/06/2019
Occupancy Inspection - Fire Passed 12/9/2019 12/09/2019
Occupancy Inspection - Codes Commercial Failed 12/9/2019 12/9/2019 12/09/2019
Misc
Corrective Action Required
12/09/2019
>>Complete north bathroom grab rails and base. recall when ready. Ok to stock and setup permanent equipment not to be open to the public or employees. Recall when approved for TCO for the detention basin.
Occupancy Inspection - Planning Failed 12/9/2019 02/14/2020
Corrective Action Required
12/09/2019
LANDSCAPING. Complete landscaping in accordance with the approved landscape plan.
Corrective Action Required
12/09/2019
ADA PARKING SPACE. The new ADA parking space shall be striped (as well as the adjacent 5' access aisle) and posted with an ADA parking space sign mounted a minimum 6' above grade, measured to the bottom of the sign. The sign shall be type R7-8 (white background, green text, green border, blue wheelchair symbol) as identified in the MUTCD.
Corrective Action Required
12/09/2019
GROUND-MOUNTED EQUIPMENT. The new HVAC equipment on the south and east sides of the additional shall be fully screened from view in accordance with the approved plans.
Occupancy Inspection - Engineering Temporary C of O 3/24/2020 03/24/2020
Misc
Informational
03/24/2020
We are allowing temporary occupancy based on they have approved plans to correct the issues in the detention basin. The plans are approved and have been delivered. They will not receive substantial completion until the detention basin has been fuly completed. I spoke with Ryan Elam and we have agreed to give temporary occupancy for now.
Occupancy Inspection - Planning Passed 6/4/2020 06/04/2020
Occupancy Inspection - Codes Commercial Failed 6/4/2020 6/4/2020 06/04/2020
Misc
Informational
06/04/2020
ALL BUILDING INSPECTION ITEMS COMPLETED. PENDING APPROVAL FROM OTHER DIVISIONS. INSPECTIONS APPROVED FOR C OF O.
Rough Electrical Inspection - Commercial Passed 06/04/2020
Misc
Informational
10/08/2019
All exterior wall electrical boxes are approved, need to cover ASAP as the MC lines are not rated to be outside in the weather, rain, etc. ok to cover
Occupancy Inspection - Engineering Failed 6/4/2020 06/04/2020
Misc
Informational
03/24/2020
We are allowing temporary occupancy based on they have approved plans to correct the issues in the detention basin. The plans are approved and have been delivered. They will not receive substantial completion until the detention basin has been fuly completed. I spoke with Ryan Elam and we have agreed to give temporary occupancy for now.
Occupancy Inspection - Engineering Passed 6/16/2020 07/29/2022
Misc
Informational
06/04/2020
We are allowing temporary occupancy based on they have approved plans to correct the issues in the detention basin. The plans are approved and have been delivered. They will not receive substantial completion until the detention basin has been fuly completed. I spoke with Ryan Elam and we have agreed to give temporary occupancy for now.
Misc
Resolved
07/29/2022
The sidewalk needs to be installed, or the UDO amendment needs to be approved and payment in lieu of construction for the sidewalk needs to be made.
Occupancy Inspection - Codes Commercial Full C of O 07/29/2022
Misc
Resolved
07/29/2022
ALL BUILDING INSPECTION ITEMS COMPLETED. PENDING APPROVAL FROM OTHER DIVISIONS. INSPECTIONS APPROVED FOR C OF O.
Documents & Images
Date Uploaded File Type Document Name
04/23/2019 Letter Fire Building Plan Review
04/24/2019 Letter DS P/R Corrections Document
05/03/2019 Letter Fire Building Plan Review
05/03/2019 Letter DS P/R Corrections Document
05/14/2019 Letter Fire Building Plan Review
05/14/2019 Letter DS P/R Corrections Document
05/21/2019 Receipt Receipt for transaction: 2019-002650
05/24/2019 Letter Codes Plan Review Conditions
05/28/2019 Letter Codes Building Permit
06/14/2019 Letter INSPECTION SUMMARY
06/14/2019 Letter INSPECTION SUMMARY
06/18/2019 Letter INSPECTION SUMMARY
06/25/2019 Letter INSPECTION SUMMARY
06/27/2019 Letter INSPECTION SUMMARY
06/28/2019 Letter INSPECTION SUMMARY
06/28/2019 Letter INSPECTION SUMMARY
07/11/2019 Letter INSPECTION SUMMARY
07/12/2019 Letter INSPECTION SUMMARY
07/12/2019 Letter INSPECTION SUMMARY
07/12/2019 Letter INSPECTION SUMMARY
08/06/2019 Letter Fire Building Plan Review
08/29/2019 Letter INSPECTION SUMMARY
09/18/2019 Letter Fire (Sprinkler) Plan Review
09/27/2019 Letter INSPECTION SUMMARY
10/08/2019 Letter INSPECTION SUMMARY
10/18/2019 Letter INSPECTION SUMMARY
11/01/2019 Letter INSPECTION SUMMARY
11/11/2019 Letter Fire (Alarm) Plan Review Notice
11/27/2019 Letter INSPECTION SUMMARY
12/09/2019 Letter INSPECTION SUMMARY
03/24/2020 Letter DE-Daily Inspection Summary
06/04/2020 Letter INSPECTION SUMMARY
06/04/2020 Letter DE-Daily Inspection Summary
07/29/2022 Letter Codes Final Certificate of Occupancy
07/29/2022 Letter Field Certificate of Occupancy
07/29/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home