Permit Application Status

PRCOM20190683


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20190683
Building Permit - Commercial
Certificate of Occupancy
BROWNSTONE PROPERTIES-LEE'S SUMMIT LLC
NEW COMMERCIAL
NEW DAYCARE FACILITY
03/25/2019
06/21/2019
12/14/2019
07/20/2020
Locations
Contacts
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
GREEN FIELD ENERGY GROUP INC, Address:5 SW 4TH ST, Phone:(816) 524-5616  
PRO CIRCUIT, Address:4925 DERAMUS AVE , Phone:(816) 474-9292  
MISSION PLUMBING, HEATING AND COOLING, Address:5725 NIEMAN RD STE C, Phone:(913) 631-6506  
Jim Hostler, Address:AJ Brown Inc  
BROWNSTONE PROPERTIES-LEE'S SUMMIT LLC, Address:3351 NE RALPH POWELL RD  
AJ BROWN INC, Address:635 TRADE CENTER BLVD, Phone:(636) 537-3636  
UHLIG ARCHITECTURE LLC, Address:12473 ROBYN ROAD, Phone:(314) 713-3255  
KRUGER TECHNOLOGIES INC, Address:8271 MELROSE DR, Phone:(913) 498-1114  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 04/30/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
04/30/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Corrective Action Required
04/30/2020

(ACTION REQUIRED) 1. Provide a smoke detector over the FACP 2. Add strobe in Room 149 3. Add Horn/Strobes in Rooms 103 and 107
Sprinkler Plan Review Released for Construction 11/22/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
11/22/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic Test.
Final Development Plan Review Approved 06/28/2019
Joe Frogge
Fire Plan Review Approved with Conditions 06/27/2019 06/24/2019
Michael Weissenbach
Fire Plan Review Approved with Conditions 06/27/2019 06/21/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
06/20/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide three sets of PE stamped shop drawings of the fire alarm system to be installed.
Address numbers required
Corrective Action Required
06/20/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Numeric address of 3395 shall be readable from the roadway (Ralph Powell road)
Knox box required
Corrective Action Required
06/20/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED:(verified at inspection) Knox box can be obtained at knoxbox.com Knox box shall be mounted on a exterior wall over or close to the Fire Department Connection. apprximately 5' off finish grade or concrete.
Construction documents - Fire protection systems
Corrective Action Required
06/20/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide three sets of PE stamped shop drawings of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
06/20/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) All field tests and acceptance testing of the fire sprinkler and fire alarm systems shall be completed prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300
Portable fire extinguishers - conspicuous locations
Corrective Action Required
06/20/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: (Verified at inspection) Provide a minimum of one 2A-10BC fire extinguisher for every 3,000 sq ft of useable space. The extinguishers are to be mounted on a wall or extinguisher cabinet on a normal path of travel close to exits. A maximum travel distance of 75' to reach a extinguisher.
Miscellaneous Correction
Resolved
06/21/2019

Classroom 103 Plan sheets throughout are inconsistant with the egress locations in room 103. ACTION REQUIRED: Provide an accurate plan sheet showing the location of two exits with exit signs for classroom 103. Provide additional exit door from 103 out West wall. Remove door and exit sign leading from Room 103 to Room 107. Reference E-2
Miscellaneous Correction
Resolved
06/21/2019

903.3.7 Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz fitting and be located within 100 feet of a fire hydrant. ACTION REQUIRED: Provide a plan sheet showing the location of the fire department connection and a fire hydrant within 100 feet of the FDC.
Miscellaneous Correction
Resolved
06/21/2019

Kitchen appliances ACTION REQUIRED: Provide information about all Kitchen appliances, stoves,ovens, grills. Type 1 kitchen hood may be required.
Miscellaneous Correction
Resolved
06/21/2019

Exit signage ACTION REQUIRED:(Verified At Inspection) Provide exit signs for the following room doors. Plan sheet E-2 (1) Room 115, add an exit sign for the door at corridor 151. (2) Room 119, add an exit sign for the door at corridor 151. (3) Room 148, add an exit sign for the door at corridor 151. (4) Room 103, remove exit and exit sign for foyer 147. Add an exit and exit sign for corridor 151
Panic and fire exit hardware
Resolved
06/21/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. ACTION REQUIRED: Provide panic hardware for all egress doors.
Door operations
Resolved
06/21/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. ACTION REQUIRED: No keyed locks on the egress side of an exit. (1) Provide information about exit door locks and hardware. (2) Provide information about any access controlled egress doors. 1008.1.9.8 Access-controlled egress doors. The entrance doors in a means of egress in buildings with an occupancy in Groups A, B, E, I-2, M, R-1 or R-2, and entrance doors to tenant spaces in occupancies in Groups A, B, E, I-2, M, R-1 or R-2, are permitted to be equipped with an approved entrance and egress access control system, listed in accordance with UL 294, which shall be installed in accordance with all of the following criteria: 1. A sensor shall be provided on the egress side arranged to detect an occupant approaching the doors. The doors shall be arranged to unlock by a signal from or loss of power to the sensor. 2. Loss of power to that part of the access control system which locks the doors shall automatically unlock the doors. 3. The doors shall be arranged to unlock from a manual unlocking device located 40 inches to 48 inches (1016 mm to 1219 mm) vertically above the floor and within 5 feet (1524 mm) of the secured doors. Ready access shall be provided to the manual unlocking device and the device shall be clearly identified by a sign that reads “PUSH TO EXIT.” When operated, the manual unlocking device shall result in direct interruption of power to the lock—independent of the access control system electronics—and the doors shall remain unlocked for a minimum of 30 seconds. 4. Activation of the building fire alarm system, if provided, shall automatically unlock the doors, and the doors shall remain unlocked until the fire alarm system has been reset. 5. Activation of the building automatic sprinkler or fire detection system, if provided, shall automatically unlock the doors. The doors shall remain unlocked until the fire alarm system has been reset.
Tenant identification
Corrective Action Required
06/20/2019

2018 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. ACTION REQUIRED:(verified at inspection) All classrooms, mechanical rooms, electrical rooms, strage rooms shall be identified off of the corridors.
Building Plan Review Approved with Conditions 06/27/2019 06/21/2019
Joe Frogge
Final Development Plan
Corrective Action Required
06/20/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 6/17/19 - acknowledged in letter
Engineered truss package
Corrective Action Required
06/20/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss and tji packages or request deferrals. 6/17/19 - Single copy of truss components provided. We need 2 copies that includes the layout drawing as well. 6/18/19 - deferred per request
Gen - Submittal documents 7-137
Resolved
06/20/2019

Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information) Action required: All drawings are to bear dated seal and signature from architect/engineer of record. Provide sealed copies of revised E, M, and S series drawings. 6/20/19 -
Licensed Contractors Approved 06/20/2019 06/20/2019
Joe Frogge
Licensed Contractors Approved 04/08/2019 06/17/2019
Joe Frogge
LC - General Contractor
Resolved
06/17/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
06/17/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 06/21/2019 06/17/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
06/14/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide three sets of PE stamped shop drawings of the fire alarm system to be installed.
Address numbers required
Corrective Action Required
06/14/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Numeric address of 3395 shall be readable from the roadway (Ralph Powell road)
Knox box required
Corrective Action Required
06/14/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED:(verified at inspection) Knox box can be obtained at knoxbox.com Knox box shall be mounted on a exterior wall over or close to the Fire Department Connection. apprximately 5' off finish grade or concrete.
Construction documents - Fire protection systems
Corrective Action Required
06/14/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide three sets of PE stamped shop drawings of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
06/14/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) All field tests and acceptance testing of the fire sprinkler and fire alarm systems shall be completed prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300
Portable fire extinguishers - conspicuous locations
Corrective Action Required
06/14/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: (Verified at inspection) Provide a minimum of one 2A-10BC fire extinguisher for every 3,000 sq ft of useable space. The extinguishers are to be mounted on a wall or extinguisher cabinet on a normal path of travel close to exits. A maximum travel distance of 75' to reach a extinguisher.
Miscellaneous Correction
Corrective Action Required
06/14/2019

Classroom 103 Plan sheets throughout are inconsistant with the egress locations in room 103. ACTION REQUIRED: Provide an accurate plan sheet showing the location of two exits with exit signs for classroom 103. Provide additional exit door from 103 out West wall. Remove door and exit sign leading from Room 103 to Room 107. Reference E-2
Miscellaneous Correction
Corrective Action Required
06/14/2019

903.3.7 Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz fitting and be located within 100 feet of a fire hydrant. ACTION REQUIRED: Provide a plan sheet showing the location of the fire department connection and a fire hydrant within 100 feet of the FDC.
Miscellaneous Correction
Corrective Action Required
06/14/2019

Kitchen appliances ACTION REQUIRED: Provide information about all Kitchen appliances, stoves,ovens, grills. Type 1 kitchen hood may be required.
Miscellaneous Correction
Corrective Action Required
06/14/2019

Exit signage ACTION REQUIRED:(Verified At Inspection) Provide exit signs for the following room doors. Plan sheet E-2 (1) Room 115, add an exit sign for the door at corridor 151. (2) Room 119, add an exit sign for the door at corridor 151. (3) Room 148, add an exit sign for the door at corridor 151. (4) Room 103, remove exit and exit sign for foyer 147. Add an exit and exit sign for corridor 151
Panic and fire exit hardware
Corrective Action Required
06/14/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. ACTION REQUIRED: Provide panic hardware for all egress doors.
Door operations
Corrective Action Required
06/14/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. ACTION REQUIRED: No keyed locks on the egress side of an exit. (1) Provide information about exit door locks and hardware. (2) Provide information about any access controlled egress doors. 1008.1.9.8 Access-controlled egress doors. The entrance doors in a means of egress in buildings with an occupancy in Groups A, B, E, I-2, M, R-1 or R-2, and entrance doors to tenant spaces in occupancies in Groups A, B, E, I-2, M, R-1 or R-2, are permitted to be equipped with an approved entrance and egress access control system, listed in accordance with UL 294, which shall be installed in accordance with all of the following criteria: 1. A sensor shall be provided on the egress side arranged to detect an occupant approaching the doors. The doors shall be arranged to unlock by a signal from or loss of power to the sensor. 2. Loss of power to that part of the access control system which locks the doors shall automatically unlock the doors. 3. The doors shall be arranged to unlock from a manual unlocking device located 40 inches to 48 inches (1016 mm to 1219 mm) vertically above the floor and within 5 feet (1524 mm) of the secured doors. Ready access shall be provided to the manual unlocking device and the device shall be clearly identified by a sign that reads “PUSH TO EXIT.” When operated, the manual unlocking device shall result in direct interruption of power to the lock—independent of the access control system electronics—and the doors shall remain unlocked for a minimum of 30 seconds. 4. Activation of the building fire alarm system, if provided, shall automatically unlock the doors, and the doors shall remain unlocked until the fire alarm system has been reset. 5. Activation of the building automatic sprinkler or fire detection system, if provided, shall automatically unlock the doors. The doors shall remain unlocked until the fire alarm system has been reset.
Tenant identification
Corrective Action Required
06/14/2019

2018 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. ACTION REQUIRED:(verified at inspection) All classrooms, mechanical rooms, electrical rooms, strage rooms shall be identified off of the corridors.
Building Plan Review Rejected 06/21/2019 06/17/2019
Joe Frogge
Final Development Plan
Corrective Action Required
06/14/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 6/17/19 - acknowledged in letter
Miscellaneous Correction
Resolved
06/17/2019

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Miscellaneous Correction
Resolved
06/17/2019

Site lighting design is incomplete. Actions required: - Provide light pole base details - Show circuitry on plans - Coordinate fixture design and locations with SL-1.
Code analysis required
Resolved
06/17/2019

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Update code analysis and code plan to show code prescribed occupant loads of 1 occupant per 35 s.f.
Miscellaneous Correction
Resolved
06/17/2019

2012 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. Action required: Relocate exhaust fan discharges to maintain 3' from openings.
Engineered truss package
Corrective Action Required
06/14/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss and tji packages or request deferrals. 6/17/19 - Single copy of truss components provided. We need 2 copies that includes the layout drawing as well. 6/18/19 - deferred per request
Miscellaneous Correction
Resolved
06/17/2019

2012 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
Bldg - Guards - Where required 1013.2
Resolved
06/17/2019

2012 IBC 1013.2 - Where required. Guards shall be located along open-sided walking surfaces, including mezzanines, equipment platforms, stairs, ramps and landings that are located more than 30 inches measured vertically to the floor or grade below at any point within 36 inches horizontally to the edge of the open side. Guards shall be adequate in strength and attachment in accordance with Section 1607.8. Guards are required at retaining walls over 30” above grade when walking surfaces are within ten (10) feet of the high side of the retaining wall. (As amended by the City of Lee’s Summit. See code section for possible exceptions.) Action required: Provide fall protection at edges of equipment platform.
Gen - Submittal documents 7-137
Corrective Action Required
06/17/2019

Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information) Action required: All drawings are to bear dated seal and signature from architect/engineer of record. Provide sealed copies of revised E, M, and S series drawings.
Special Inspections Review Approved 06/17/2019
Joe Frogge
Building Plan Review Rejected 04/08/2019 04/01/2019
Joe Frogge
Final Development Plan
Corrective Action Required
04/01/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
04/01/2019

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Miscellaneous Correction
Corrective Action Required
04/01/2019

Site lighting design is incomplete. Actions required: - Provide light pole base details - Show circuitry on plans - Coordinate fixture design and locations with SL-1.
Code analysis required
Corrective Action Required
04/01/2019

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Update code analysis and code plan to show code prescribed occupant loads of 1 occupant per 35 s.f.
Miscellaneous Correction
Corrective Action Required
04/01/2019

2012 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. Action required: Relocate exhaust fan discharges to maintain 3' from openings.
Engineered truss package
Corrective Action Required
04/01/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss and tji packages or request deferrals.
Miscellaneous Correction
Corrective Action Required
04/01/2019

2012 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
Miscellaneous Correction
Resolved
04/05/2019

Ductwork is routed outside of conditioned space. Action required: Specify duct insulation type, thickness, etc. Must comply with IMC 604.
Miscellaneous Correction
Resolved
04/05/2019

2012 IPC 708.3.5 Building drain and building sewer junction. There shall be a cleanout near the junction of the building drain and the building sewer. The cleanout shall be either inside or outside the building wall and shall be brought up to the finished ground level or to the basement floor level. (see code for additional information) Action required: Provide cleanout where sewer leaves building footprint.
Bldg - Guards - Where required 1013.2
Corrective Action Required
04/01/2019

2012 IBC 1013.2 - Where required. Guards shall be located along open-sided walking surfaces, including mezzanines, equipment platforms, stairs, ramps and landings that are located more than 30 inches measured vertically to the floor or grade below at any point within 36 inches horizontally to the edge of the open side. Guards shall be adequate in strength and attachment in accordance with Section 1607.8. Guards are required at retaining walls over 30” above grade when walking surfaces are within ten (10) feet of the high side of the retaining wall. (As amended by the City of Lee’s Summit. See code section for possible exceptions.) Action required: Provide fall protection at edges of equipment platform.
Licensed Contractors Rejected 04/08/2019 04/01/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
04/01/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
04/01/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 04/08/2019 03/28/2019
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
03/28/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED:(information purposes) Have the fire alarm system contractor provide three sets of PE stamped shop drawings of the fire alarm system to be installed.
Address numbers required
Corrective Action Required
03/28/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(verified at inspection) Numeric address of 3395 shall be readable from the roadway (Ralph Powell road)
Knox box required
Corrective Action Required
03/28/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED:(verified at inspection) Knox box can be obtained at knoxbox.com Knox box shall be mounted on a exterior wall over or close to the Fire Department Connection. apprximately 5' off finish grade or concrete.
Construction documents - Fire protection systems
Corrective Action Required
03/28/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED:(information purposes) Have the fire sprinkler system contractor provide three sets of PE stamped shop drawings of the fire sprinkler system to be installed.
Installation acceptance testing
Corrective Action Required
03/28/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) All field tests and acceptance testing of the fire sprinkler and fire alarm systems shall be completed prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300
Portable fire extinguishers - conspicuous locations
Corrective Action Required
03/28/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: (Verified at inspection) Provide a minimum of one 2A-10BC fire extinguisher for every 3,000 sq ft of useable space. The extinguishers are to be mounted on a wall or extinguisher cabinet on a normal path of travel close to exits. A maximum travel distance of 75' to reach a extinguisher.
Miscellaneous Correction
Corrective Action Required
03/28/2019

Classroom 103 Plan sheets throughout are inconsistant with the egress locations in room 103. ACTION REQUIRED: Provide an accurate plan sheet showing the location of two exits with exit signs for classroom 103.
Miscellaneous Correction
Corrective Action Required
03/28/2019

903.3.7 Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz fitting and be located within 100 feet of a fire hydrant. ACTION REQUIRED: Provide a plan sheet showing the location of the fire department connection and a fire hydrant within 100 feet of the FDC.
Miscellaneous Correction
Corrective Action Required
03/28/2019

Kitchen appliances ACTION REQUIRED: Provide information about all Kitchen appliances, stoves,ovens, grills. Type 1 kitchen hood may be required.
Miscellaneous Correction
Corrective Action Required
03/28/2019

Exit signage ACTION REQUIRED: Provide exit signs for the following room doors. Plan sheet E-2 (1) Room 115, add an exit sign for the door at corridor 151. (2) Room 119, add an exit sign for the door at corridor 151. (3) Room 148, add an exit sign for the door at corridor 151. (4) Room 103, remove exit and exit sign for foyer 147. Add an exit and exit sign for corridor 151
Panic and fire exit hardware
Corrective Action Required
03/28/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. ACTION REQUIRED: Provide panic hardware for all egress doors.
Door operations
Corrective Action Required
03/28/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. ACTION REQUIRED: No keyed locks on the egress side of an exit. (1) Provide information about exit door locks and hardware. (2) Provide information about any access controlled egress doors. 1008.1.9.8 Access-controlled egress doors. The entrance doors in a means of egress in buildings with an occupancy in Groups A, B, E, I-2, M, R-1 or R-2, and entrance doors to tenant spaces in occupancies in Groups A, B, E, I-2, M, R-1 or R-2, are permitted to be equipped with an approved entrance and egress access control system, listed in accordance with UL 294, which shall be installed in accordance with all of the following criteria: 1. A sensor shall be provided on the egress side arranged to detect an occupant approaching the doors. The doors shall be arranged to unlock by a signal from or loss of power to the sensor. 2. Loss of power to that part of the access control system which locks the doors shall automatically unlock the doors. 3. The doors shall be arranged to unlock from a manual unlocking device located 40 inches to 48 inches (1016 mm to 1219 mm) vertically above the floor and within 5 feet (1524 mm) of the secured doors. Ready access shall be provided to the manual unlocking device and the device shall be clearly identified by a sign that reads “PUSH TO EXIT.” When operated, the manual unlocking device shall result in direct interruption of power to the lock—independent of the access control system electronics—and the doors shall remain unlocked for a minimum of 30 seconds. 4. Activation of the building fire alarm system, if provided, shall automatically unlock the doors, and the doors shall remain unlocked until the fire alarm system has been reset. 5. Activation of the building automatic sprinkler or fire detection system, if provided, shall automatically unlock the doors. The doors shall remain unlocked until the fire alarm system has been reset.
Tenant identification
Corrective Action Required
03/28/2019

2018 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. ACTION REQUIRED:(verified at inspection) All classrooms, mechanical rooms, electrical rooms, strage rooms shall be identified off of the corridors.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Commercial $7,200.00 $7,200.00 Paid 06/21/2019
8331507-Sewer Connection Fee $1,770.00 $1,770.00 Paid 06/21/2019
8331506-EFHB Maybrook, Full $2,513.99 $2,513.99 Paid 06/21/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Partial 8/19/2019 at 1:10 PM 08/19/2019
Misc
Partial Correction
08/19/2019
-INTERIOR COLUMN PIER PADS OK: PADS ON LINES 3-15
Footing Inspection - Commercial Failed 8/21/2019 8/21/2019 at 1:10 PM 08/21/2019
Misc
Corrective Action Required
08/21/2019
EAST HALF OF THE FOOTING ALREADY POURED WITHOUT INSPCTION FROM CITY
Footing Inspection - Commercial Partial 8/28/2019 8/28/2019 at 11:15 AM 08/28/2019
Misc
Partial Correction
08/28/2019
OBSERVED THE OVERDUG FOOTING TRENCH. SOIL APPEARS TO BE ORIGINAL SOIL. 3RD PARTY SPECIAL INSPECTION IS ON SITE TO TEST THE SOIL. FLOWABLE FILL WILL BE POURED TO FOOTING LEVEL UPON APPROVAL OF THE SPECIAL INSPECTOR.
Footing Inspection - Commercial Partial 8/29/2019 8/29/2019 at 11:30 AM 08/29/2019
Misc
Partial Correction
08/28/2019
EXTERIOR WALL GRADE BEAM AND COLUMN PADS AND INTERIOR PADS-OK
Underslab Plumbing Inspection - Commercial Passed 9/11/2019 09/11/2019
Informational
09/11/2019
interior underslab and sewer 5' out side the building.
Underslab Electrical Inspection - Commercial Passed 9/18/2019 9/18/2019 at 9:15 AM 09/18/2019
Rough Framing Inspection - Commercial Partial 12/16/2019 12/16/2019 at 11:20 AM 12/16/2019
Misc
Partial Correction
12/16/2019
-EXTERIOR WALL SHEATHING NAILING AND STRAPPING AT WINDOWS-OK
Footing Inspection - Commercial Passed 12/23/2019 12/23/2019 12/16/2019
Misc
Resolved
12/16/2019
EXTERIOR WALL GRADE BEAM AND COLUMN PADS AND INTERIOR PADS-OK
All Rough Inspection - Commercial Failed 12/17/2019 12/17/2019 at 1:50 PM 12/17/2019
Misc
Partial Correction
12/17/2019
ABOVE CEILING ALL-ROUGH ONLY: -Complete all above-ceiling trades -Need floor and roof truss package on site. Engineer address change of mezzanine floor TJIs to trusses. Mezzanine floor trusses need to be tied down to I beam -Tie down girder trusses at exterior wall and I beam per truss package -Tie down all trusses at both the exterior wall and I beam
All Rough Inspection - Commercial Failed 12/19/2019 12/19/2019 at 10:15 AM 12/19/2019
Misc
Partial Correction
12/17/2019
ABOVE CEILING ALL-ROUGH ONLY: -Complete all above-ceiling trades -Need floor and roof truss package on site. Engineer address change of mezzanine floor TJIs to trusses. Mezzanine floor trusses need to be tied down to I beam -Tie down girder trusses at exterior wall and I beam per truss package -Tie down all trusses at both the exterior wall and I beam **12/19-WASN'T SURE WHAT THE BUILDER WANT ME TO INSPECT. SUB STILL INSTALLING THEIR STUFFS
Miscellaneous Inspection Partial 12/23/2019 at 9:55 AM 12/23/2019
Misc
Partial Correction
12/23/2019
-INSPECTION OF THE COLUMN BASE GROUTING-OK IN PROGRESS
Gas Piping Inspection - Commercial Passed 1/7/2020 1/7/2020 01/07/2020
Misc
Informational
01/07/2020
Release one gas meter , steady at 30 psi
In-wall Inspection Partial 1/7/2020 1/7/2020 01/07/2020
Misc
Informational
01/07/2020
DWV 3 gauges steady at 5 psi Two receptacles in columns each end front entry OK to cover
All Rough Inspection - Commercial Failed 1/28/2020 1/28/2020 at 1:15 PM 01/28/2020
Misc
Partial Correction
12/19/2019
ABOVE HARD-LID CEILING ALL-ROUGH ONLY: -Engineer address change of mezzanine floor TJIs to trusses. Mezzanine floor trusses need to be tied down to I beam -Tie down girder trusses at I beam -Complete all mechanical: return air ducting, complete and insulating all supply ducting, and all exhaust ducting
All Rough Inspection - Commercial Failed 2/5/2020 at 2:10 PM 02/05/2020
Misc
Partial Correction
01/28/2020
ABOVE HARD-LID CEILING ALL-ROUGH ONLY: -Engineer address change of mezzanine floor TJIs to trusses. -Complete all mechanical: return air ducting, complete and insulating all supply ducting, and all exhaust ducting
All Rough Inspection - Commercial Partial 2/7/2020 2/7/2020 at 1:40 PM 02/07/2020
Misc
Partial Correction
02/05/2020
ABOVE HARD-LID CEILING ALL-ROUGH ONLY-OK TO ROCK CEILING HARD-LID
In-wall Inspection Failed 3/3/2020 at 1:50 PM 03/03/2020
Misc
Corrective Action Required
03/03/2020
-Anchor sill plates per code. Anchor within 12" of plate breaks; min 2 anchors per short plate; tighten all nuts. Some anchors do not have any wahser and nuts -Reinforce studs at sink carriers -Complete dryer vent
In-wall Inspection Passed 3/5/2020 3/5/2020 at 1:35 PM 03/05/2020
Misc
Resolved
03/05/2020
-Anchor sill plates per code. Anchor within 12" of plate breaks; min 2 anchors per short plate; tighten all nuts. Some anchors do not have any wahser and nuts -Reinforce studs at sink carriers -Complete dryer vent
All Rough Inspection - Commercial Passed 3/3/2020 03/05/2020
Misc
Resolved
03/05/2020
ABOVE HARD-LID CEILING ALL-ROUGH ONLY-OK TO ROCK CEILING HARD-LID
Electrical Service Inspection Failed 3/5/2020 at 2:30 PM 03/05/2020
Misc
Corrective Action Required
03/05/2020
-SERVICE INSTALLATION NOT PER PLAN. A SERVICE DISCONNECT IS NOW INSTALLED OUTSIDE, WITH THE MDP AND ALL PANELS ON THE LOAD SIDE OF THE SERVICE DISCONNECTING MEAN. HAVE ENGINEER REDRAW SERVICE DIAGRAM. -THE GROUNDING ELECTRODE CONDUCTOR (1/0 CU) MUST GO TO AND GROUND THE SERVICE DISCONNECT OUTSIDE. ALL EQUIPMENT GROUNDING CONDUCTORS AND GROUNDED CONDUCTORS IN THE PANELS WILL NEED TO BE ISOLATED -BOND THE METAL RACEWAY BETWEEN THE METER AND THE SERVICE DISCONNECT PER 250.92 -THE UNGROUNDED SERVICE FEEDER CONDUCTORS (500 KCMIKL) MUST BE PROTECTED AT THE SERVICE DISCONNECT WHERE THE CONDUCTORS RECEIVE THE SUPPLY. THE CURRENT FEEDER CONDUCTORS DO NOT MEET ANY FEEDER TAP REQUIREMENT OF 240.21(B) SINCE THE PROVISION OF 240.4(B) SHALL NOT BE PERMITTED. EITHER INCREASE SIZE OF FEEDER TO 600 KCMIL CONDUCTORS OR PROVIDE OVERCURRENT PROTECTION FOR THE FEEDER INSIDE THE SERVICE DISCONNECT
Electrical Service Inspection Passed 3/16/2020 3/16/2020 at 1:40 PM 03/16/2020
Misc
Resolved
03/16/2020
-SERVICE INSTALLATION NOT PER PLAN. A SERVICE DISCONNECT IS NOW INSTALLED OUTSIDE, WITH THE MDP AND ALL PANELS ON THE LOAD SIDE OF THE SERVICE DISCONNECTING MEAN. HAVE ENGINEER REDRAW SERVICE DIAGRAM. -THE GROUNDING ELECTRODE CONDUCTOR (1/0 CU) MUST GO TO AND GROUND THE SERVICE DISCONNECT OUTSIDE. ALL EQUIPMENT GROUNDING CONDUCTORS AND GROUNDED CONDUCTORS IN THE PANELS WILL NEED TO BE ISOLATED -BOND THE METAL RACEWAY BETWEEN THE METER AND THE SERVICE DISCONNECT PER 250.92 -THE UNGROUNDED SERVICE FEEDER CONDUCTORS (500 KCMIKL) MUST BE PROTECTED AT THE SERVICE DISCONNECT WHERE THE CONDUCTORS RECEIVE THE SUPPLY. THE CURRENT FEEDER CONDUCTORS DO NOT MEET ANY FEEDER TAP REQUIREMENT OF 240.21(B) SINCE THE PROVISION OF 240.4(B) SHALL NOT BE PERMITTED. EITHER INCREASE SIZE OF FEEDER TO 600 KCMIL CONDUCTORS OR PROVIDE OVERCURRENT PROTECTION FOR THE FEEDER INSIDE THE SERVICE DISCONNECT
Sprinkler - Hydrostatic Test Failed 4/16/2020 04/16/2020
Sprinkler - Hydrostatic Test Passed 4/21/2020 04/21/2020
Rough Framing Inspection - Commercial Passed 04/24/2020
Misc
Informational
04/24/2020
-EXTERIOR WALL SHEATHING NAILING AND STRAPPING AT WINDOWS-OK
Miscellaneous Inspection Passed 04/24/2020
Misc
Resolved
04/24/2020
-INSPECTION OF THE COLUMN BASE GROUTING-OK IN PROGRESS
Above Ceiling Inspection Failed 4/24/2020 04/24/2020
Misc
Corrective Action Required
04/24/2020
-Check to make sure CPVC in plenum to meet flame spread and smoke develop indexes. Check all cables to be plenum-rated -Return air not provided from room 142 -Install ceiling return air in rm 148 -Complete bathroom (134) fan exhaust to outside -Seal plenum from attic space
Above Ceiling Inspection Passed 5/15/2020 5/15/2020 at 11:00 AM 05/15/2020
Misc
Informational
05/15/2020
-Complete bathroom (134) fan exhaust to outside
Alarm Test Passed 6/15/2020 06/15/2020
Sprinkler - Flow Test Passed 6/15/2020 06/15/2020
Occupancy Inspection - Engineering Temporary C of O 6/18/2020 06/18/2020
Misc
Informational
06/18/2020
Vegetation needs to be established before final occupancy.
Occupancy Inspection - Fire Passed 6/19/2020 06/19/2020
Occupancy Inspection - Codes Commercial Temporary C of O 6/19/2020 6/19/2020 at 9:15 AM 06/19/2020
Misc
Corrective Action Required
06/19/2020
-Approval required from: Field Service, Planning, Fire, and Water -Expose light pole grounding connection and raceway; Ground all light poles; verify raceway buried depth per code (min 24” under parking lot, 18” everywhere else) -Vent bath fan of NW classroom to outside -Label AC units -Install tamper-proof receptacles throughout the childcare facility as required per NEC 406.12 -Adjust all doors opening force to 5lbs or less -Receptacles located within six ft of the sinks must be gfci-protected (microwave, refrigerator, tv, etc) -Protect exposed plumbing under kitchen sinks -All single phase receptacles rated 50 amperes or less located in the kitchen must be gfci-protected. NEC 210.8(B) -Install receptacle cover plate inside closet of SE classroom -Support receptacle yoke at sink in room with access to mezzanine -Complete gas supply to furnace; complete insulating fresh air ducting
Occupancy Inspection - Planning Temporary C of O 06/19/2020
Miscellaneous Correction
Corrective Action Required
06/19/2020
Complete Landscaping
Miscellaneous Correction
Corrective Action Required
06/19/2020
Install required ADA parking signage.
Occupancy Inspection - Engineering Temporary C of O 6/19/2020 06/19/2020
Misc
Informational
06/18/2020
Vegetation needs to be established before final occupancy.
Misc
Informational
06/19/2020
1. Vegetaiton needs to be established 2. We will also need as-builds for the water line going to the backflow preventer by the fire hydrant.
Occupancy Inspection - Water Utilities Passed 07/15/2020
Occupancy Inspection - Codes Commercial Temporary C of O 7/15/2020 7/15/2020 at 9:45 AM 07/15/2020
Misc
Corrective Action Required
06/19/2020
-Approval required from Field Service
Occupancy Inspection - Engineering Temporary C of O 7/15/2020 07/15/2020
Misc
Informational
06/19/2020
Vegetation needs to be established before final occupancy.
Misc
Informational
06/19/2020
1. Vegetaiton needs to be established 2. We will also need as-builds for the water line going to the backflow preventer by the fire hydrant.
Corrective Action Required
07/15/2020
Need to finish sodding on the north side of the property and the hill in the back of the building needs to have some kind of vegetation.
Occupancy Inspection - Planning Passed 07/15/2020
Miscellaneous Correction
Corrective Action Required
06/19/2020
Landscaping remains to be installed on the north and east sides. this will be handles by Engineering
Occupancy Inspection - Codes Commercial Full C of O 07/20/2020
Misc
Corrective Action Required
07/15/2020
-Approval required from Field Service
Documents & Images
Date Uploaded File Type Document Name
03/28/2019 Letter Fire Building Plan Review
04/01/2019 Letter DS P/R Corrections Document
06/17/2019 Letter Fire Building Plan Review
06/17/2019 Letter DS P/R Corrections Document
06/19/2019 Goddard deferral request_001
06/21/2019 Receipt Receipt for transaction: 2019-003969
06/21/2019 Letter Fire Building Plan Review
06/21/2019 Letter Codes Plan Review Conditions
06/21/2019 Letter Codes Building Permit
08/19/2019 image wye tie in sanitary
08/19/2019 Letter INSPECTION SUMMARY
08/21/2019 Letter INSPECTION SUMMARY
08/27/2019 Engineer Report/Study J034913.01 Special Inspection Report No. 1
08/28/2019 Letter INSPECTION SUMMARY
08/29/2019 Letter INSPECTION SUMMARY
09/11/2019 Letter INSPECTION SUMMARY
09/17/2019 Engineer Report/Study J034913.01 Special Inspection Report No. 2
09/24/2019 Engineer Report/Study J034913.01 Special Inspection Report No. 3
10/14/2019 Engineer Report/Study J034913.01 Special Inspection Report No. 4
11/11/2019 Engineer Report/Study J034913.01 Special Inspection Report No. 5
11/22/2019 Letter Fire (Sprinkler) Plan Review
11/27/2019 Engineer Report/Study J034913.01 Special Inspection Report No. 6
12/16/2019 Letter INSPECTION SUMMARY
12/16/2019 Letter INSPECTION SUMMARY
12/17/2019 Letter INSPECTION SUMMARY
12/19/2019 Letter INSPECTION SUMMARY
12/23/2019 Letter INSPECTION SUMMARY
01/07/2020 Letter INSPECTION SUMMARY
01/28/2020 Letter INSPECTION SUMMARY
02/05/2020 Letter INSPECTION SUMMARY
02/06/2020 Engineer Report/Study Goddard Letter 1
02/06/2020 Engineer Report/Study Goddard Letter 2
02/07/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
03/16/2020 Letter INSPECTION SUMMARY
03/19/2020 Engineer Report/Study J034913.01 Special Inspection Report No. 4
04/01/2020 Engineer Report/Study J034913.01 Special Inspection Report No. 7
04/24/2020 Letter INSPECTION SUMMARY
04/30/2020 Letter Fire (Alarm) Plan Review Notice
05/15/2020 Letter INSPECTION SUMMARY
05/29/2020 Engineer Report/Study J034913.01 Special Inspection Report No. 8
06/17/2020 Goddard Lee's Summit III State Fire Marshal compliance 3301 NE Ralph Powell
06/18/2020 Letter DE-Daily Inspection Summary
06/19/2020 Letter Codes Temporary Certificate of Occupancy
06/19/2020 Letter DE-Daily Inspection Summary
07/15/2020 Letter Codes Temporary Certificate of Occupancy
07/15/2020 Letter DE-Daily Inspection Summary
07/20/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home