Permit Application Status

PRCOM20183218


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20183218
Building Permit - Commercial
Certificate of Occupancy
LAW OFFICE OF CAMRON HOORFAR PC
CHANGE OF TENANT
CHANGE OF TENANT FOR HAIR SALON WITH NO NAIL SERVICE **drawings are in plan review file
09/21/2018
09/28/2018
03/24/2019
10/02/2018
Locations
Contacts
TRUE POINT CONSTRUCTION LLC, Address:802 2ND AVE S, Phone:(816) 875-0305  
BD ELECTRIC, Address:5919 S BUCKNER TARSNEY RD, Phone:(816) 305-2055  
TAYLOR MECHANICAL INC, Address:23700 E 189th st, Phone:(816) 743-9900  
JOSH@TRUEPOINTCONSTRUCTION.COM  
LAW OFFICE OF CAMRON HOORFAR PC, Address:415 SW JEFFERSON ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 10/03/2018 09/25/2018
Joe Dir
Address numbers required
Corrective Action Required
09/25/2018

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED:(veriifed at inspection) Address shall be readable form roadway
Portable fire extinguishers - general
Corrective Action Required
09/25/2018

2012 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. ACTION REQUIRED: (veriifed at inspection) If not existing provide a minimum of one 2A-10BC fire extingusiher. Fire extinguisher is to be mounted on a wall close to an exit.
Licensed Contractors Approved 10/03/2018 09/24/2018
Development Center
LC - MEP Subs
Corrective Action Required
09/24/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed Plumbing contractor.
Building Plan Review Rejected 10/03/2018 09/24/2018
Joe Frogge
License Tax Application
Corrective Action Required
09/24/2018

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Misc
Resolved
09/28/2018

Insufficient information to complete review. Action required: Provide complete MEP designs or detailed scopes of work from listed contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $30.00 $30.00 Paid 09/28/2018
8331507-Sewer Connection Fee $60.00 $60.00 Paid 09/28/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 10/1/2018 10/01/2018
Occupancy Inspection - Codes Commercial Full C of O 10/2/2018 10/2/2018 at 2:00 PM 10/02/2018
Occupancy Inspection - Fire Passed 10/2/2018 10/02/2018
Documents & Images
Date Uploaded File Type Document Name
09/25/2018 Letter Fire Building Plan Review
09/25/2018 Letter Codes P/R Corrections Document
09/28/2018 Letter Codes Plan Review Conditions
09/28/2018 Receipt Receipt for transaction: 2018-006611
09/28/2018 Letter Codes Building Permit
10/01/2018 Letter Inspection Summary
10/02/2018 scope
10/02/2018 Letter Field Certificate of Occupancy
10/03/2018 Letter Codes Final Certificate of Occupancy
07/18/2022 Lets face it letter 7_18
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home