Review Type |
Outcome |
Est. Completion Date |
Completed |
Fire Plan Review
|
Approved with Conditions
|
04/09/2018
|
04/09/2018
|
|
Joe Dir
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
ACTION REQUIRED:
All fire alarm system devices that are disconnected, relocated or install new will require an acceptance test prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
ACTION REQUIRED:(information purposes)
Fire sprinkler system in all areas of rennovation requires modification. Have the fire sprinkler system contractor provide shop drawings of modifications to be don the fire sprinkler system.
|
|
|
Building Plan Review
|
Approved with Conditions
|
03/14/2018
|
03/13/2018
|
|
Joe Frogge
|
|
License Tax Application
Corrective Action Required
A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Action Required: Comment is for informational purposes.
3/7/18 - acknowledged in letter
|
|
Project cost
The project cost, which is used to establish the permit fee, has not been provided.
Action Required: Comment is for informational purposes.
3/7/18 - not addressed
|
|
Plan Submittal 2012 Codes
All plans submitted for review on or after January 1, 2014 shall be designed to the requirements of the 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2012 International Fuel Gas Code, 2012 International Fire Code, 2011 National Electric Code and the ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit.
Action Required: Update code analysis to show proper IPC which is 2012.
3/7/18 - altered by hand per architect's direction
|
|
Misc
Electrical design not submitted.
Action required: Provide electrical design or detailed scope of work that includes all materials and methods.
3/7/18 - pending
|
|
|
Fire Plan Review
|
Approved with Conditions
|
03/14/2018
|
03/13/2018
|
|
Joe Frogge
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
ACTION REQUIRED:
All fire alarm system devices that are disconnected, relocated or install new will require an acceptance test prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
ACTION REQUIRED:(information purposes)
Fire sprinkler system in all areas of rennovation requires modification. Have the fire sprinkler system contractor provide shop drawings of modifications to be don the fire sprinkler system.
|
|
|
Licensed Contractors
|
Approved
|
03/07/2018
|
03/07/2018
|
|
Joe Frogge
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed Electrical Contractors.
3/7/18 - acknowledged in letter
|
|
LC - General Contractor
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
3/7/18 - acknowledged in letter
|
|
|
Fire Plan Review
|
Approved with Conditions
|
03/02/2018
|
03/05/2018
|
|
Joe Frogge
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
ACTION REQUIRED:
All fire alarm system devices that are disconnected, relocated or install new will require an acceptance test prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
ACTION REQUIRED:(information purposes)
Fire sprinkler system in all areas of rennovation requires modification. Have the fire sprinkler system contractor provide shop drawings of modifications to be don the fire sprinkler system.
|
|
|
Building Plan Review
|
Rejected
|
03/02/2018
|
02/27/2018
|
|
Joe Frogge
|
|
License Tax Application
Corrective Action Required
A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit.
Action Required: Comment is for informational purposes.
|
|
Project cost
Corrective Action Required
The project cost, which is used to establish the permit fee, has not been provided.
Action Required: Comment is for informational purposes.
|
|
Plan Submittal 2012 Codes
Corrective Action Required
All plans submitted for review on or after January 1, 2014 shall be designed to the requirements of the 2012 International Building Code, 2012 International Mechanical Code, 2012 International Plumbing Code, 2012 International Fuel Gas Code, 2012 International Fire Code, 2011 National Electric Code and the ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit.
Action Required: Update code analysis to show proper IPC which is 2012.
|
|
Misc
Corrective Action Required
Electrical design not submitted.
Action required: Provide electrical design or detailed scope of work that includes all materials and methods.
|
|
|
Licensed Contractors
|
Rejected
|
03/02/2018
|
02/27/2018
|
|
Joe Frogge
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed Electrical Contractors.
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
|
|
|