Permit Application Status

PRCOM20172505


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20172505
Building Permit - Commercial
Certificate of Occupancy
PARROT PROPERTIES INC
NEW MULTI-FAMILY
23units BUILDING #2 NEW 2 STORY APARTMENT WITH PARKING GARAGES BENEATH FOUNDATION PERMIT - PRCOM20180698
07/24/2017
01/02/2019
11/06/2019
Locations
Contacts
CITYSCAPE CONSTRUCTION VIEW HIGH LLC, Address:10 W CARMEL DR STE 200, Phone:(317) 574-1600 Ext:100  
STANDARD HEATING & COOLING TOO LLC, Address:2006 E PRAIRIE CIRCLE , Phone:(913) 782-5409  
STANDARD ELECTRIC TOO LLC, Address:2006 E PRAIRIE CIRCLE, Phone:(913) 782-5409  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
SGN+A ARCHITECTS, Address:315 W PONCE DE LEON AVE #755, Phone:(404) 373-7370  
LATIMER SOMMERS & ASSOCIATES PA, Address:3639 SW SUMMERFIELD DR STE A, Phone:(785) 233-3232  
PARROT PROPERTIES INC, Address:11303 VIEW HIGH DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 07/25/2018 11/08/2018
Dawn Bell
Final Development Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Building Plan Review Approved 08/07/2018 02/16/2018
Joe Frogge
Special Inspections Review Approved 08/24/2017
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Multi-Family $10,486.73 $10,486.73 Paid 11/21/2018
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 11/21/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Failed 4/19/2019 4/19/2019 04/19/2019
LOWER LEVEL
Corrective Action Required
04/19/2019
•Strap top plates together •Joist Hanger Nails •Plumbing Needs to be supported every 4ft •CLP System is missing nuts •Penetrations need fire caulked •Penetrations inside chases that will be built have to be inspected •Blocks for all ground level doors •LVL hangers •Missing draft stop, and need to seal all draft stop •Anchor bolts •Pre rock for dryer vent •Garage 4 LVL, possibly a double LVL?
FIRST FLOOR
Corrective Action Required
04/19/2019
Same comments as lower level. •Strap top plates together •Joist Hanger Nails •Plumbing Needs to be supported every 4ft •CLP System is missing nuts •Penetrations need fire caulked •Penetrations inside chases that will be built have to be inspected •Blocks for all ground level doors •LVL hangers Missing draft stop, and need to seal all draft stop •Pre rock for dryer vent
SECOND FLOOR
Corrective Action Required
04/19/2019
- dead space - support flex ducts attic -fall for plumbing vents attic -fire dampers for furnaces - strap cut top plates exterior walls at porch headers. - Dryer boxes -Rock heat chase & dead spaces from attic and seal. - Plumbing colars -hurrican ties over stairs north end - joist hangers ceiling and between lvl's - hold downs provide Special inspection hold down report at re-inspect
Sprinkler - Hydrostatic Test Passed 4/24/2019 04/24/2019
All Rough Inspection - Commercial Failed 4/29/2019 4/29/2019 04/29/2019
LOWER LEVEL
Corrective Action Required
04/19/2019
•Joist Hanger Nails •Plumbing Needs to be supported every 4ft •Penetrations need fire caulked •Penetrations inside chases that will be built have to be inspected •Missing draft stop, and need to seal all draft stop
FIRST FLOOR
Corrective Action Required
04/19/2019
Same comments as lower level. •Joist Hanger Nails •Plumbing Needs to be supported every 4ft •Penetrations need fire caulked •Penetrations inside chases that will be built have to be inspected •LVL hangers Missing draft stop, and need to seal all draft stop
SECOND FLOOR
Corrective Action Required
04/19/2019
- dead space -fall for plumbing vents attic -Rock heat chase & dead spaces from attic and seal. - Plumbing colars -hurrican ties over stairs north end east side. provide Special inspection hold down report at re-inspect
All Rough Inspection - Commercial Passed 5/1/2019 5/1/2019 05/01/2019
LOWER LEVEL
Resolved
05/01/2019
•Joist Hanger Nails •Plumbing Needs to be supported every 4ft •Penetrations need fire caulked •Penetrations inside chases that will be built have to be inspected •Missing draft stop, and need to seal all draft stop
FIRST FLOOR
Resolved
05/01/2019
Same comments as lower level. •Joist Hanger Nails •Plumbing Needs to be supported every 4ft •Penetrations need fire caulked •Penetrations inside chases that will be built have to be inspected •LVL hangers Missing draft stop, and need to seal all draft stop
SECOND FLOOR
Resolved
05/01/2019
- dead space -fall for plumbing vents attic -Rock heat chase & dead spaces from attic and seal. - Plumbing colars -hurrican ties over stairs north end east side. provide Special inspection hold down report at re-inspect
Rated Assembly Inspection Partial 5/3/2019 5/3/2019 05/07/2019
SECOND FLOOR
Corrective Action Required
05/03/2019
RC CHANNEL
FIRST FLOOR
Corrective Action Required
05/03/2019
LOWER LEVEL
Corrective Action Required
05/03/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/03/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS/DEAD
Rated Assembly Inspection Partial 5/7/2019 05/07/2019
SECOND FLOOR
Corrective Action Required
05/07/2019
RC CHANNEL] TUB SHOWER CONNECTION
FIRST FLOOR
Corrective Action Required
05/07/2019
RC CHANNEL
LOWER LEVEL
Corrective Action Required
05/07/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/07/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS.
Rated Assembly Inspection Partial 5/9/2019 5/9/2019 05/09/2019
SECOND FLOOR
Corrective Action Required
05/07/2019
RC CHANNEL]- NEEDED AT WEST STAIR TOWERS TUB SHOWER CONNECTION
FIRST FLOOR
Corrective Action Required
05/07/2019
RC CHANNEL -NEEDED AT LANDING AND STAIRS -TUB SHOWER DRAINS
LOWER LEVEL
Corrective Action Required
05/07/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/07/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS.
Rated Assembly Inspection Partial 5/13/2019 5/13/2019 05/13/2019
SECOND FLOOR
Corrective Action Required
05/09/2019
RC CHANNEL]- NEEDED AT WEST STAIR TOWERS TUB SHOWER CONNECTION - rooms except 7,8,11,12
FIRST FLOOR
Corrective Action Required
05/09/2019
RC CHANNEL -NEEDED AT LANDING AND STAIRS -TUB SHOWER DRAINS
LOWER LEVEL
Corrective Action Required
05/09/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/09/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS.
Rated Assembly Inspection Partial 5/14/2019 5/14/2019 05/14/2019
SECOND FLOOR
Corrective Action Required
05/13/2019
Rooms Complete
FIRST FLOOR
Corrective Action Required
05/13/2019
RC CHANNEL -NEEDED AT LANDING AND STAIRS -TUB SHOWER DRAINS
LOWER LEVEL
Corrective Action Required
05/13/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/13/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS.
Rated Assembly Inspection Partial 5/17/2019 5/17/2019 at 11:05 AM 05/17/2019
SECOND FLOOR
Corrective Action Required
05/14/2019
Rooms Complete
FIRST FLOOR
Corrective Action Required
05/14/2019
RC CHANNEL -NEEDED AT LANDING AND STAIRS -TUB SHOWER DRAINS ROOMS APPROVED
LOWER LEVEL
Corrective Action Required
05/14/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/14/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS.
Rated Assembly Inspection Partial 5/24/2019 5/24/2019 05/24/2019
SECOND FLOOR
Corrective Action Required
05/17/2019
Rooms Complete
FIRST FLOOR
Corrective Action Required
05/17/2019
RC CHANNEL -NEEDED AT LANDING AND STAIRS -TUB SHOWER DRAINS ROOMS APPROVED
LOWER LEVEL
Corrective Action Required
05/17/2019
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/17/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS.
Rated Assembly Inspection Partial 5/28/2019 5/28/2019 05/28/2019
SECOND FLOOR
Corrective Action Required
05/24/2019
Rooms Complete
FIRST FLOOR
Corrective Action Required
05/24/2019
RC CHANNEL -NEEDED AT LANDING AND STAIRS -TUB SHOWER DRAINS ROOMS APPROVED
LOWER LEVEL
Corrective Action Required
05/24/2019
REMOVE ROCK ON STAIR TOWNERS FOR RC CHANNEL INSPECTION.
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/24/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS.
Rated Assembly Inspection Partial 5/30/2019 5/30/2019 05/30/2019
SECOND FLOOR
Corrective Action Required
05/28/2019
Rooms Complete
FIRST FLOOR
Corrective Action Required
05/28/2019
RC CHANNEL COMPETE
LOWER LEVEL
Corrective Action Required
05/28/2019
RC COMPLETE
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/28/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS. 1,2ND FLOORS
Rated Assembly Inspection Partial 6/12/2019 6/12/2019 06/12/2019
SECOND FLOOR
Corrective Action Required
05/30/2019
RC-Rooms Complete RC- STAIR TOWERS UNITS ROCKED.
FIRST FLOOR
Corrective Action Required
05/30/2019
RC CHANNEL COMPETE, UNITS ROCKED
LOWER LEVEL
Corrective Action Required
05/30/2019
RC COMPLETE, GARAGES
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/30/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS. ROCK UNITS ,GARAGES
Misc
Corrective Action Required
06/12/2019
FUR OUTS IN GARAGES DROPS FOR ELECTRICAL SOUTH GARAGE PENETRATIONS IN CORRIDOR
Rated Assembly Inspection Partial 6/14/2019 6/14/2019 at 10:10 AM 06/14/2019
SECOND FLOOR
Corrective Action Required
06/12/2019
RC-Rooms Complete RC- STAIR TOWERS UNITS ROCKED.
FIRST FLOOR
Corrective Action Required
06/12/2019
RC CHANNEL COMPETE, UNITS ROCKED
LOWER LEVEL
Corrective Action Required
06/12/2019
RC COMPLETE, GARAGES
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/12/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS. ROCK UNITS ,GARAGES STAIR TOWERS
Misc
Corrective Action Required
06/12/2019
FUR OUTS IN GARAGES DROPS FOR ELECTRICAL SOUTH GARAGE PENETRATIONS IN CORRIDOR
Rated Assembly Inspection Partial 7/1/2019 7/1/2019 07/01/2019
SECOND FLOOR
Corrective Action Required
06/14/2019
RC-Rooms Complete RC- STAIR TOWERS UNITS ROCKED.
FIRST FLOOR
Corrective Action Required
06/14/2019
RC CHANNEL COMPETE, UNITS ROCKED
LOWER LEVEL
Corrective Action Required
06/14/2019
RC COMPLETE, GARAGES,above ceiling of corridor.
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/14/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS. ROCK UNITS ,GARAGES STAIR TOWERS
Misc
Corrective Action Required
06/14/2019
FUR OUTS IN GARAGES DROPS FOR ELECTRICAL SOUTH GARAGE PENETRATIONS IN CORRIDOR
Electrical Service Inspection Passed 7/2/2019 7/2/2019 07/02/2019
Rated Assembly Inspection Partial 7/3/2019 7/3/2019 07/03/2019
SECOND FLOOR
Corrective Action Required
07/01/2019
RC-Rooms Complete RC- STAIR TOWERS UNITS ROCKED.
FIRST FLOOR
Corrective Action Required
07/01/2019
RC CHANNEL COMPETE, UNITS ROCKED
LOWER LEVEL
Corrective Action Required
07/01/2019
RC COMPLETE, GARAGES,above ceiling of corridor.
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/01/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS. ROCK UNITS ,GARAGES STAIR TOWERS
Misc
Resolved
07/03/2019
FUR OUTS IN GARAGES DROPS FOR ELECTRICAL SOUTH GARAGE PENETRATIONS IN CORRIDOR
Rated Assembly Inspection Failed 7/16/2019 7/16/2019 07/16/2019
SECOND FLOOR
Corrective Action Required
07/03/2019
RC-Rooms Complete RC- STAIR TOWERS UNITS ROCKED.
FIRST FLOOR
Corrective Action Required
07/03/2019
RC CHANNEL COMPETE, UNITS ROCKED
LOWER LEVEL
Corrective Action Required
07/03/2019
RC COMPLETE, GARAGES,above ceiling of corridor.
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/03/2019
DRYER BOXES- PRE-ROCK- TUB SHOWERS. ROCK UNITS ,GARAGES STAIR TOWERS
Misc
Corrective Action Required
07/16/2019
caulk AC line at all units
Above Ceiling Inspection Failed 7/18/2019 7/18/2019 07/18/2019
Misc
Corrective Action Required
07/18/2019
- Failed- open junction boxes above ceiling. penetrations not fire caulked. Box outs in garage for DWV are not firestopped do not cover.
Sprinkler - Flow Test Passed 9/19/2019 09/19/2019
Alarm Test Passed 9/19/2019 09/19/2019
Occupancy Inspection - Codes Commercial Failed 10/11/2019 10/11/2019 10/11/2019
Misc
Corrective Action Required
10/11/2019
ok to stock furniture on sales units. See Fire Dept, Planning, and water on separate approval. No TCO will be issued until Substantial complete is approved for site permit.
Occupancy Inspection - Planning Temporary C of O 10/11/2019
Corrective Action Required
10/11/2019
Sodding is required for all disturbed areas.
Corrective Action Required
10/11/2019
General site clean-up is needed for the parking lot and sidewalk areas.
Occupancy Inspection - Fire Failed 10/11/2019 10/11/2019
Occupancy Inspection - Fire Passed 10/15/2019 10/15/2019
Occupancy Inspection - Codes Commercial Failed 10/15/2019 10/15/2019 10/15/2019
Misc
Corrective Action Required
10/11/2019
ok to stock furniture on sales units. See Fire Dept, Planning, and water on separate approval. No TCO will be issued until Substantial complete is approved for site permit.
Occupancy Inspection - Engineering Temporary C of O 10/30/2019 11/05/2019
Occupancy Inspection - Codes Commercial Full C of O 11/6/2019 11/06/2019
Misc
Resolved
11/06/2019
Documents & Images
Date Uploaded File Type Document Name
10/16/2017 Meridian Site Map
11/21/2018 Receipt Receipt for transaction: 2018-007329
01/02/2019 Letter Codes Building Permit
04/19/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
05/01/2019 Letter INSPECTION SUMMARY
05/03/2019 Letter INSPECTION SUMMARY
05/07/2019 Letter INSPECTION SUMMARY
05/09/2019 Letter INSPECTION SUMMARY
05/13/2019 Letter INSPECTION SUMMARY
05/14/2019 Letter INSPECTION SUMMARY
05/17/2019 Letter INSPECTION SUMMARY
05/28/2019 Letter INSPECTION SUMMARY
05/30/2019 Letter INSPECTION SUMMARY
06/14/2019 Letter INSPECTION SUMMARY
07/01/2019 Letter INSPECTION SUMMARY
07/02/2019 Letter INSPECTION SUMMARY
07/16/2019 Letter INSPECTION SUMMARY
07/18/2019 Letter INSPECTION SUMMARY
10/11/2019 Letter INSPECTION SUMMARY
11/06/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home