Summary
PRCOM20170405
Building Permit - Commercial
Certificate of Occupancy
M150 ECHELON LAND DEV LLC
NEW MULTI-FAMILY
NEW 3 STORY APARTMENT BUILDING FOUNDATION PERMIT - PRCOM20180520 *NOT TO BE ISSUED UNTIL FIRE DEPARTMENT RELEASES PERMIT
02/16/2017
08/07/2018
09/06/2019
Locations
Contacts
LUKE DRAILY CONSTRUCTION INC, Address:75 NW BUSINESS PARK LANE, Phone:(816) 459-8531  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
ELECTRICAL ENTERPRISES INC, Address:PO BOX 127, Phone:(785) 242-7971  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
KANSAS CITY TESTING & ENGINEERING, Address:1308 ADAMS STREET, Phone:(913) 321-8100  
M150 ECHELON LAND DEV LLC, Address:120 SE 30TH ST  
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Special Inspections Review Approved 04/12/2018
Joe Frogge
Fire Plan Review Approved 03/06/2017 04/12/2018
Joe Frogge
Building Plan Review Approved 06/14/2018 04/12/2018
Joe Frogge
Licensed Contractors Approved 06/14/2018 04/12/2018
Joe Frogge
Final Development Plan Review Approved 03/06/2017 02/05/2018
Joe Frogge
Alarm Plan Review Released for Construction 05/24/2017
Joe Dir
Sprinkler Plan Review Released for Construction 05/24/2017
Joe Dir
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $11,511.02 $11,511.02 Paid 12/20/2017
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 12/20/2017
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 09/26/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Above Ceiling Inspection Failed 12/14/2018 12/14/2018 at 3:45 PM 12/14/2018
Misc
Corrective Action Required
12/14/2018
CONSTRUCTION OFFICE TRAILER LOCKED. GENERAL CONTRACTOR NOT FOUND.
Sprinkler - Hydrostatic Test Passed 12/19/2018 12/19/2018
Above Ceiling Inspection Failed 1/9/2019 1/9/2019 at 11:15 AM 01/09/2019
Misc
Corrective Action Required
12/14/2018
-FIRESTOP DOUBLE WALLS, PENETRATIONS THROUGH TO ATTICE AREA
Above Ceiling Inspection Partial 1/16/2019 1/16/2019 at 10:30 AM 01/16/2019
Misc
Corrective Action Required
01/09/2019
-3rd FLOOR ABOVE CEILING, ALL APPROVED EXCEPT RATED ASSEMBLY ISSUE AT AREAS WITH CHANGES IN CEILING ELEVATIONS. HAVE DESIGN PROFESSIONAL OF RECORD ADDRESS
Above Ceiling Inspection Partial 1/23/2019 1/23/2019 at 11:00 AM 01/23/2019
Misc
Partial Correction
01/23/2019
-3rd FLOOR ABOVE CEILING, ALL APPROVED EXCEPT DAMPERS IN ASSEMBLY AT CHANGE OF ELEVATIONS. -2ND FLOOR CEILING APPROVED
All Rough Inspection - Commercial Failed 1/23/2019 1/23/2019 at 12:05 PM 01/23/2019
Misc
Corrective Action Required
01/23/2019
-INSTALL PUTTY PADS ON BOXES LOCATE WITHIN 24" OF EACH OTHER IN THE SAME SPACE.
All Rough Inspection - Commercial Partial 1/29/2019 1/29/2019 at 11:00 AM 01/29/2019
Misc
Partial Correction
01/29/2019
3RD AND SECOND FLOOR APPROVED
Electrical Service Inspection Failed 2/1/2019 2/1/2019 02/01/2019
Misc
Corrective Action Required
02/01/2019
First floor units only: SEAL PENETRATIONS IN DRAFT STOPS FOR FLOOR JOISTS. INSTALL CLEANOUTS AT THE BASE OF ALL PLUMBING STACKS. PROTECT ALL PLUMBING AT THE BASE 3” FROM THE FLOOR. NORTH UNIT, FIREBLOCK NORTH WALL DEAD SPACE. DO NOT COVER
All Rough Inspection - Commercial Partial 2/1/2019 2/1/2019 02/01/2019
Misc
Partial Correction
01/29/2019
3RD AND SECOND FLOOR APPROVED
Rated Assembly Inspection Partial 2/5/2019 2/5/2019 at 11:00 AM 02/05/2019
THIRD FLOOR
Partial Correction
02/05/2019
1st layer in units approved.
All Rough Inspection - Commercial Passed 2/11/2019 2/11/2019 at 12:12 PM 02/11/2019
Misc
Resolved
02/11/2019
3RD AND SECOND FLOOR APPROVED
Rated Assembly Inspection Failed 3/12/2019 3/12/2019 03/12/2019
Misc
Corrective Action Required
03/12/2019
THE ONLY APPROVED VISUAL RATED ASSEMBLY INSPECTION FOR THIS BUILDING IS THE FIRST LAYER LID FOR THE 3RD FLOOR AND THE UNITS. CORRIDOR FIRST LAYER. THE REST HAS BEEN MUD AND TAPED WITHOUT INSPECTION.
Rated Assembly Inspection Partial 3/13/2019 3/13/2019 at 1:00 PM 03/13/2019
Misc
Corrective Action Required
03/12/2019
THE ONLY APPROVED VISUAL RATED ASSEMBLY INSPECTION FOR THIS BUILDING IS THE FIRST LAYER LID FOR THE 3RD FLOOR AND THE UNITS. CORRIDOR FIRST LAYER. THE REST HAS BEEN MUD AND TAPED WITHOUT INSPECTION. REPORT BACK REGARDING SPECIAL INSPECTION REPORT FOR PARTY WALLS AND FLOOR CEILING ASSEMBLIES
Rated Assembly Inspection Partial 3/15/2019 3/15/2019 at 3:00 PM 03/15/2019
Misc
Corrective Action Required
03/13/2019
THE ONLY APPROVED VISUAL RATED ASSEMBLY INSPECTION FOR THIS BUILDING IS THE FIRST LAYER LID FOR THE 3RD FLOOR AND THE UNITS. CORRIDOR FIRST LAYER. THE REST HAS BEEN MUD AND TAPED WITHOUT INSPECTION. REPORT BACK REGARDING SPECIAL INSPECTION REPORT FOR PARTY WALLS AND FLOOR CEILING ASSEMBLIES 2nd LAYER LID OF BOTH STAIR TOWERS APPROVED. 1st LAYER GARAGES, AND 1ST FLOOR CORRIDOR APPROVED.
Rated Assembly Inspection Partial 3/19/2019 3/19/2019 at 12:05 PM 03/19/2019
Misc
Partial Correction
03/19/2019
THE ONLY APPROVED VISUAL RATED ASSEMBLY INSPECTION FOR THIS BUILDING IS THE FIRST LAYER LID FOR THE 3RD FLOOR AND THE UNITS. CORRIDOR FIRST LAYER. THE REST HAS BEEN MUD AND TAPED WITHOUT INSPECTION. REPORT BACK REGARDING SPECIAL INSPECTION REPORT FOR PARTY WALLS AND FLOOR CEILING ASSEMBLIES 2nd LAYER LID OF BOTH STAIR TOWERS APPROVED. 1st LAYER GARAGES, AND 1ST FLOOR CORRIDOR APPROVED. 3rd LAYER STAIR TOWER APPROVED. 2ND LAYER 3RD FLOOR CORRIDOR APPROVED
Rated Assembly Inspection Partial 3/20/2019 3/20/2019 03/20/2019
Misc
Partial Correction
03/19/2019
THE ONLY APPROVED VISUAL RATED ASSEMBLY INSPECTION FOR THIS BUILDING IS THE FIRST LAYER LID FOR THE 3RD FLOOR AND THE UNITS. CORRIDOR FIRST LAYER. THE REST HAS BEEN MUD AND TAPED WITHOUT INSPECTION. REPORT BACK REGARDING SPECIAL INSPECTION REPORT FOR PARTY WALLS AND FLOOR CEILING ASSEMBLIES 2nd LAYER LID OF BOTH STAIR TOWERS APPROVED. 1st LAYER GARAGES, AND 1ST FLOOR CORRIDOR APPROVED. 3rd LAYER AND HAT CHANNEL STAIR TOWER APPROVED. 2ND LAYER 3RD FLOOR CORRIDOR APPROVED
Rated Assembly Inspection Partial 3/22/2019 3/22/2019 03/22/2019
Misc
Partial Correction
03/20/2019
THE ONLY APPROVED VISUAL RATED ASSEMBLY INSPECTION FOR THIS BUILDING IS THE FIRST LAYER LID FOR THE 3RD FLOOR AND THE UNITS. CORRIDOR FIRST LAYER. THE REST HAS BEEN MUD AND TAPED WITHOUT INSPECTION. REPORT BACK REGARDING SPECIAL INSPECTION REPORT FOR PARTY WALLS AND FLOOR CEILING ASSEMBLIES 2nd LAYER LID OF BOTH STAIR TOWERS APPROVED. 1st LAYER GARAGES, AND 1ST FLOOR CORRIDOR APPROVED. ALL STAIR TOWER ASSEMBLIES APPROVED
Electrical Service Inspection Passed 4/3/2019 4/3/2019 at 2:14 PM 04/03/2019
Above Ceiling Inspection Passed 4/4/2019 at 11:12 AM 04/04/2019
Misc
Resolved
04/04/2019
-3rd FLOOR ABOVE CEILING, ALL APPROVED EXCEPT DAMPERS IN ASSEMBLY AT CHANGE OF ELEVATIONS. -2ND FLOOR CEILING APPROVED
Sprinkler - Flow Test Passed 6/25/2019 06/25/2019
Alarm Test Failed 6/25/2019 06/25/2019
Alarm Test Failed 7/8/2019 07/08/2019
Alarm Test Passed 7/15/2019 07/15/2019
Occupancy Inspection - Fire Not Ready 7/18/2019 07/18/2019
Occupancy Inspection - Planning Failed 7/18/2019 07/18/2019
Corrective Action Required
07/18/2019
SIDEWALK. Install the required ADA-accessible sidewalk connection from Cheddington Dr to the site.
Corrective Action Required
07/18/2019
TRASH ENCLOSURE. Complete trash enclosure construction per the approved plan.
Occupancy Inspection - Fire Temporary C of O 7/30/2019 07/30/2019
Occupancy Inspection - Codes Commercial Failed 7/30/2019 7/30/2019 07/30/2019
Misc
Corrective Action Required
07/18/2019
-Room 306 Spark ring for microwave needs adjusted to be flush with cabinet Tape covering sprinkler head in spare bedroom -Room - 309 Spark ring for microwave needs adjusted to be flush with cabinet -Stair tower 4, level 3 sprinkler head covered -Room 206 Smoke detector in spare bedroom needs installed -room 107 C/o detector needed outside of bedroom, smoke only right now -room 300 Tape on sprinkler head in bathroom and laundry room Grill missing in same bathroom Secure lines for AC units on roof top. Label breaker boxes properly for each AC unit on roof top. Anchor down support 4x4s for AC lines all units 3rd floor corridor in front of stair tower 1, open junction box near door -Room 200 Pex lines need to be fire caulked in furnace room -room 203 Hammer arrester needed for dish washer -room 204 Pex lines need in furnace rooms need sheet rocked and fire caulked -room 105 Exhaust fan not working in spare bathroom Top plug-in for disposal not working under kitchen sink -Room 103 Pex lines in furnace room needs to be fire caulked not foamed IT room needs fire caulked and 3M sleeves as discussed North mechanical room corrections needed as discussed, take care of wire as discussed. South exterior sprinkler room open wireing and fire caulk penetrations. Address all fire department issues. Planning ok for TCO Water ok for tco.
Rated Assembly Inspection Passed 4/4/2019 7/30/2019 07/30/2019
Misc
Resolved
07/30/2019
THE ONLY APPROVED VISUAL RATED ASSEMBLY INSPECTION FOR THIS BUILDING IS THE FIRST LAYER LID FOR THE 3RD FLOOR AND THE UNITS. CORRIDOR FIRST LAYER. THE REST HAS BEEN MUD AND TAPED WITHOUT INSPECTION. REPORT BACK REGARDING SPECIAL INSPECTION REPORT FOR PARTY WALLS AND FLOOR CEILING ASSEMBLIES 2nd LAYER LID OF BOTH STAIR TOWERS APPROVED. 1st LAYER GARAGES, AND 1ST FLOOR CORRIDOR APPROVED. ALL STAIR TOWER ASSEMBLIES APPROVED
Occupancy Inspection - Codes Commercial Temporary C of O 7/31/2019 07/31/2019
Misc
Corrective Action Required
07/30/2019
Pending: Fire Dept.-Garage 5-07 not working , ok for TCO Planning-ok for TCO Water-need Backflow report. ok for TCO Site inspector- ok for TCO Codes-OK for Cofo TCO issued to 8/9 for garage and backflow report.
Occupancy Inspection - Water Utilities Failed 7/30/2019 08/01/2019
Occupancy Inspection - Engineering Temporary C of O 7/30/2019 08/05/2019
Occupancy Inspection - Fire Passed 8/5/2019 08/05/2019
Occupancy Inspection - Water Utilities Passed 08/16/2019
Occupancy Inspection - Codes Commercial Full C of O 9/6/2019 09/06/2019
Misc
Resolved
09/06/2019
Pending: Fire Dept.- TCO Planning-ok for TCO Water-need Backflow report. ok for TCO Site inspector- ok for TCO Codes-OK for Cofo TCO issued to 8/9 for garage and backflow report.
Documents & Images
Date Uploaded File Type Document Name
05/22/2017 Permit Map
12/20/2017 Receipt Receipt for transaction: 2017-007716
08/07/2018 Letter Codes Building Permit
12/14/2018 Letter INSPECTION SUMMARY
01/16/2019 Letter INSPECTION SUMMARY
01/23/2019 Letter INSPECTION SUMMARY
01/23/2019 Letter INSPECTION SUMMARY
01/29/2019 Letter INSPECTION SUMMARY
02/01/2019 Letter INSPECTION SUMMARY
02/01/2019 Letter INSPECTION SUMMARY
02/05/2019 Letter INSPECTION SUMMARY
02/11/2019 Letter INSPECTION SUMMARY
03/12/2019 Letter INSPECTION SUMMARY
03/13/2019 Letter INSPECTION SUMMARY
03/15/2019 Letter INSPECTION SUMMARY
03/19/2019 Letter INSPECTION SUMMARY
03/20/2019 Letter INSPECTION SUMMARY
03/22/2019 Letter INSPECTION SUMMARY
04/03/2019 Letter INSPECTION SUMMARY
04/04/2019 Letter INSPECTION SUMMARY
07/18/2019 Letter INSPECTION SUMMARY
07/30/2019 Letter INSPECTION SUMMARY
07/31/2019 Letter Codes Temporary Certificate of Occupancy
09/06/2019 Letter Field Certificate of Occupancy
09/09/2019 Letter Codes Final Certificate of Occupancy
09/26/2019 Receipt Receipt for transaction: 2019-006441
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home