Permit Application Status

PRCOM20161771


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20161771
Building Permit - Commercial
Certificate of Occupancy
TOWNSEND SUMMIT LLC
NEW MULTI-FAMILY
NEW 4 STORY APARTMENT BUILDING REF: PRCOM20162367 FOR FOUNDATION PERMIT
07/19/2016
07/17/2017
10/17/2018
Locations
Contacts
NEIGHBORS CONSTRUCTION COMPANY INC, Address:1708 E 123RD ST, Phone:(913) 422-5555  
AIR DOCTOR SOLUTIONS LLC, Address:P O BOX 842400, Phone:(435) 688-3060  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
Reviews
Review Type Outcome Est. Completion Date Completed
Special Inspections Review Approved 06/06/2018
Mike Weisenborn
Final Development Plan Review Approved 10/13/2016
Joe Frogge
Building Plan Review Approved with Conditions 08/01/2016 10/13/2016
Joe Frogge
Licensed Contractors Rejected 07/19/2016 10/13/2016
Joe Frogge
Fire Plan Review Approved with Conditions 09/22/2016
Joe Dir
09/22/2016

09/22/2016

09/22/2016

09/22/2016

Construction documents for fire alarm systems
Corrective Action Required
09/22/2016

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS FOR THE FIRE ALARM SYSTEM TO BE INSTALLED
Tenant identification
Corrective Action Required
09/22/2016

2012 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. POST THE ADDRESSING OF ALL APARTMENTS IN THE CORRIDORS. LABEL ALL ELECTRICAL ROOM DOORS, MECHANICAL ROOM DOORS, IT ROOM DOORS, FIRE SPRINKLER ROOM DOORS, ELEVATOR MECHANICAL ROOM DOORS. (VERIFIED AT INSPECTION)
Fire access roads or water supply required
Corrective Action Required
09/22/2016

2012 IFC 501.4- Timing of installation. When fire apparatus access roads or a water supply for fire protection is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction except when approved alternative methods of protection are provided. Temporary street signs shall be installed at each street intersection when construction of new roadways allows passage by vehicles in accordance with Section 505.2. PROVIDE TWO MEANS OF ACCESS TO THE CONSTRUCTION AREAS. (ROADWAYS APPROVED THROUGH THE FDP'S) AND FIRE HYDRANTS PRIOR TO STARTING ANY VERTICAL CONSTRUCTION OF BUILDINGS
Address numbers required
Corrective Action Required
09/22/2016

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF 825 ON ALL FOUR SIDES OF THE BUILDING IN CONTRASTING COLOR TO THE BACKGROUND NAD READABLE FROM THE ROADWAY / DRIVEWAY (VERIFIED AT INSPECTION)
Knox box required
Corrective Action Required
09/22/2016

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. MOUNT THE KNOX BOX ON THE EXTERIOR WALL OF THE BUILDING ABOVE THE FIRE DEPARTMENT CONNECTION WITH TOP OF BOX APPROX.6' OFF FINISH GRADE. (VERIFIED AT INSPECTION) 506.1.2 Key boxes for nonstandardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm). MOUNT THE KNOX BOX FOR THE ELEVATORS ON THE WALL NEXT TO THE ELEVATOR WITH TOP OF BOX APPROX. 6' OFF FINISH FLOOR. (VERIFIED AT INSPECTION)
Construction documents - Fire protection systems
Corrective Action Required
09/22/2016

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS FOR THE FIRE SPRINKLER SYSTEM TO BE INSTALLED.
Installation acceptance testing
Corrective Action Required
09/22/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. FIELD AND ACCEPTANCE TESTING WILL BE REQUIRED FOR THE FIRE ALARM AND FIRE SPRINKLER SYSTEMS PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE TESTING CONTACT THE FIRE DEPARTMENT AT 816-969-1300
Misc
Corrective Action Required
09/22/2016

[B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. NO KEYED LOCKS ON THE EGRESS SIDE OF A MARKED EXIT. [B] 1008.1.9.1 Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate.
Misc
Corrective Action Required
09/22/2016

LABEL THE STAIRWAYS AT EACH LANDING TO INDICATE EACH FLOOR LEVEL (VERIFIED AT INSPECTION)
Misc
Corrective Action Required
09/22/2016

[B] 1008.1.9.11 Stairway doors. Interior stairway means of egress doors shall be openable from both sides without the use of a key or special knowledge or effort. Exceptions: 1. Stairway discharge doors shall be openable from the egress side and shall only be locked from the opposite side. 2. This section shall not apply to doors arranged in accordance with Section 403.5.3 of the International Building Code. 3. In stairways serving not more than four stories, doors are permitted to be locked from the side opposite the egress side, provided they are openable from the egress side and capable of being unlocked simultaneously without unlatching upon a signal from the fire command center, if present, or a signal by emergency personnel from a single location inside the main entrance to the building. 4. Stairway exit doors shall be openable from the egress side and shall only be locked from the opposite side in Group B, F, M and S occupancies where the only interior access to the tenant space is from a single exit stair where permitted in Section 1021.2. 5. Stairway exit doors shall be openable from the egress side and shall only be locked from the opposite side in Group R-2 occupancies where the only interior access to the dwelling unit is from a single exit stair where permitted in Section 1021.2. [B] 1008.1.6 Landings at doors. Landings shall have a width not less than the width of the stairway or the door, whichever is greater. Doors in the fully open position shall not reduce a required dimension by more than 7 inches (178 mm). When a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing to less than one-half its required width. Landings shall have a length measured in the direction of travel of not less than 44 inches (1118 mm).
Portable fire extinguishers - general
Corrective Action Required
09/22/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. PROVIDE 2A-10BC FIRE EXTINGUISHERS FOR ALL APARTMENTS AND CORRIDORS (VERIFIED AT INSPECTION)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/22/2016

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MOUNT THE FIRE EXTINGUISHERS IN THE CORRIDORS BY THE STAIRWAY DOORS ON EACH FLOOR LEVEL (VERIFIED AT INSPECTION) MOUNT THE FIRE EXTINGUISHERS IN THE APARTMENTS IN A EASY ACCESSABLE LOCATION (VERIFIED AT INSPECTION)
Fire Plan Review Rejected 08/01/2016 07/28/2016
Joe Dir
Misc
Corrective Action Required
07/28/2016

HAVE ALL FINAL DEVLEOPMENT PLANS APPROVED PRIOR TO MOVING FORWARD WITH THE PROJECT.
Construction documents for fire alarm systems
Corrective Action Required
07/28/2016

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS FOR THE FIRE ALARM SYSTEM TO BE INSTALLED
Tenant identification
Corrective Action Required
07/28/2016

2012 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. POST THE ADDRESSING OF ALL APARTMENTS IN THE CORRIDORS. LABEL ALL ELECTRICAL ROOM DOORS, MECHANICAL ROOM DOORS, IT ROOM DOORS, FIRE SPRINKLER ROOM DOORS, ELEVATOR MECHANICAL ROOM DOORS. (VERIFIED AT INSPECTION)
Fire access roads or water supply required
Corrective Action Required
07/28/2016

2012 IFC 501.4- Timing of installation. When fire apparatus access roads or a water supply for fire protection is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction except when approved alternative methods of protection are provided. Temporary street signs shall be installed at each street intersection when construction of new roadways allows passage by vehicles in accordance with Section 505.2. PROVIDE TWO MEANS OF ACCESS TO THE CONSTRUCTION AREAS. (ROADWAYS APPROVED THROUGH THE FDP'S) AND FIRE HYDRANTS PRIOR TO STARTING ANY VERTICAL CONSTRUCTION OF BUILDINGS
Address numbers required
Corrective Action Required
07/28/2016

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF 825 ON ALL FOUR SIDES OF THE BUILDING IN CONTRASTING COLOR TO THE BACKGROUND NAD READABLE FROM THE ROADWAY / DRIVEWAY
Knox box required
Corrective Action Required
07/28/2016

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. MOUNT THE KNOX BOX ON THE EXTERIOR WALL OF THE BUILDING ABOVE THE FIRE DEPARTMENT CONNECTION WITH TOP OF BOX APPROX.6' OFF FINISH GRADE. 506.1.2 Key boxes for nonstandardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm). MOUNT THE KNOX BOX FOR THE ELEVATORS ON THE WALL NEXT TO THE ELEVATOR WITH TOP OF BOX APPROX. 6' OFF FINISH FLOOR.
Construction documents - Fire protection systems
Corrective Action Required
07/28/2016

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS FOR THE FIRE SPRINKLER SYSTEM TO BE INSTALLED.
Installation acceptance testing
Corrective Action Required
07/28/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. FIELD AND ACCEPTANCE TESTING WILL BE REQUIRED FOR THE FIRE ALARM AND FIRE SPRINKLER SYSTEMS PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE TESTING CONTACT THE FIRE DEPARTMENT AT 816-969-1300
Misc
Corrective Action Required
07/28/2016

PROVIDE CIVIL PLANS TO SHOW THE LOCATIONS OF THE FIRE HYDRANTS
Misc
Corrective Action Required
07/28/2016

903.3.7 FIRE DEPARTMENT CONNECTIONS. THE LOCATION OF THE FIRE DEPARTMENT CONNECTION SHALL BE APPROVED BY THE FIRE CODE OFFICIAL. CONNECTIONS SHALL BE A 4 INCH FITTING (INCLUDE A 30 DEGREE ELBOW) AND LOCATED WITHIN 100 FEET OF A FIRE HYDRANT OR AS APPROVED BY THE CODE OFFICIAL.
Misc
Corrective Action Required
07/28/2016

[B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. NO KEYED LOCKS ON THE EGRESS SIDE OF A MARKED EXIT. [B] 1008.1.9.1 Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate.
Misc
Corrective Action Required
07/28/2016

LABEL THE STAIRWAYS AT EACH LANDING TO INDICATE EACH FLOOR LEVEL (VERIFIED AT INSPECTION)
Misc
Corrective Action Required
07/28/2016

[B] 1008.1.9.11 Stairway doors. Interior stairway means of egress doors shall be openable from both sides without the use of a key or special knowledge or effort. Exceptions: 1. Stairway discharge doors shall be openable from the egress side and shall only be locked from the opposite side. 2. This section shall not apply to doors arranged in accordance with Section 403.5.3 of the International Building Code. 3. In stairways serving not more than four stories, doors are permitted to be locked from the side opposite the egress side, provided they are openable from the egress side and capable of being unlocked simultaneously without unlatching upon a signal from the fire command center, if present, or a signal by emergency personnel from a single location inside the main entrance to the building. 4. Stairway exit doors shall be openable from the egress side and shall only be locked from the opposite side in Group B, F, M and S occupancies where the only interior access to the tenant space is from a single exit stair where permitted in Section 1021.2. 5. Stairway exit doors shall be openable from the egress side and shall only be locked from the opposite side in Group R-2 occupancies where the only interior access to the dwelling unit is from a single exit stair where permitted in Section 1021.2. [B] 1008.1.6 Landings at doors. Landings shall have a width not less than the width of the stairway or the door, whichever is greater. Doors in the fully open position shall not reduce a required dimension by more than 7 inches (178 mm). When a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing to less than one-half its required width. Landings shall have a length measured in the direction of travel of not less than 44 inches (1118 mm).
Misc
Corrective Action Required
07/28/2016

PROVIDE AN ADDITIONAL EXTERIOR ACCESS DORR FOR THE FIRE SPRINKLER ROOM.
Portable fire extinguishers - general
Corrective Action Required
07/28/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. PROVIDE 2A-10BC FIRE EXTINGUISHERS FOR ALL APARTMENTS AND CORRIDORS (VERIFIED AT INSPECTION)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
07/28/2016

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MOUNT THE FIRE EXTINGUISHERS IN THE CORRIDORS BY THE STAIRWAY DOORS ON EACH FLOOR LEVEL (VERIFIED AT INSPECTION) MOUNT THE FIRE EXTINGUISHERS IN THE APARTMENTS IN A EASY ACCESSABLE LOCATION (VERIFIED AT INSPECTION)
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $18,497.72 $18,497.72 Paid 06/30/2017
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 06/30/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Partial 7/28/2017 07/28/2017
Misc
Partial Correction
07/28/2017
OK TO COVER WHEN READY SHEAR WALLS AT: BASEMENT SOUTH STAIR;
Rated Assembly Inspection Partial 8/1/2017 8/1/2017 08/01/2017
Misc
Partial Correction
07/28/2017
OK TO COVER WHEN READY AT STAIRWELLS: SOUTH STAIRWELL: AT BASEMENT: 1ST LAYER 5/8" TYPE X GWB INCLUDING PRE-ROCK;
Misc
Partial Correction
08/01/2017
OK TO COVER WHEN READY AT ELEVATOR: AT BASEMENT: 1ST LAYER 5/8" TYPE X GWB INCLUDING PRE-ROCK;
Rated Assembly Inspection Partial 8/8/2017 08/08/2017
Misc
Partial Correction
08/08/2017
OK TO COVER WHEN READY AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER 5/8" TYPE X GWB INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY;
Misc
Partial Correction
08/08/2017
OK TO COVER WHEN READY AT ELEVATOR: BASEMENT: 1ST LAYER 5/8" TYPE X GWB INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK;
Rough Framing Inspection - Commercial Partial 8/29/2017 8/29/2017 at 2:00 PM 08/29/2017
Misc
Partial Correction
08/29/2017
OK TO COVER WHEN READY ATTACHED GARAGE PORTAL REINFORCING: STRAPS AT INTERIOR;
Misc
Partial Correction
08/29/2017
OK TO COVER WHEN READY OSB SHEAR WALLS AT STAIRWELLS AT: 1ST FLOOR;
Rated Assembly Inspection Partial 9/14/2017 9/14/2017 at 1:15 PM 09/14/2017
Misc
Partial Correction
08/08/2017
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK;
Misc
Partial Correction
08/08/2017
OK TO COVER WHEN READY 5/8" TYPE X GWB PRE-ROCK AT ELEVATOR: BASEMENT: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND FLOOR: 1ST LAYER;
Rated Assembly Inspection Partial 9/26/2017 9/26/2017 at 4:15 PM 09/26/2017
Misc
Partial Correction
09/14/2017
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; [2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; [2ND LAYER PRE-ROCK ONLY; NORTH STAIRWELL: 1ST FLOOR: [2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: [2ND LAYER PRE-ROCK ONLY;
Misc
Partial Correction
09/14/2017
OK TO COVER WHEN READY 5/8" TYPE X GWB PRE-ROCK AT ELEVATOR: BASEMENT: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; [2ND LAYER; 2ND FLOOR: 1ST LAYER; [2ND LAYER;
Rated Assembly Inspection Partial 9/29/2017 9/29/2017 at 8:00 AM 09/29/2017
Misc
Partial Correction
09/26/2017
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; [2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; [2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK NORTH STAIRWELL: 1ST FLOOR: [2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: [2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK
Misc
Partial Correction
09/26/2017
OK TO COVER WHEN READY 5/8" TYPE X GWB PRE-ROCK AT ELEVATOR: BASEMENT: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; [2ND LAYER; 2ND FLOOR: 1ST LAYER; [2ND LAYER;
Rough Framing Inspection - Commercial Partial 11/17/2017 11/17/2017 at 3:25 PM 11/17/2017
Misc
Partial Correction
08/01/2017
OK TO COVER WHEN READY: ROOF SHEATHING. SOME WALLS ABOVE ROOF LACK STUDS & NAILING SHEAR WALLS AT: BASEMENT SOUTH STAIR;
Rough Framing Inspection - Commercial Partial 2/15/2018 2/15/2018 at 3:55 PM 02/15/2018
Misc
Partial Correction
11/17/2017
OK TO COVER WHEN READY: ATTACHED GARAGE PORTAL REINFORCING; STRAPS AT INTERIOR; [EXTERIOR WALL SHEATHING;
Misc
Partial Correction
11/17/2017
OK TO COVER WHEN READY OSB SHEAR WALLS AT STAIRWELLS AT: 1ST FLOOR;
All Rough Inspection - Commercial Partial 2/22/2018 2/22/2018 at 10:55 AM 02/22/2018
Misc
Partial Correction
02/22/2018
OK TO COVER FRAMING & SYSTEMS TO BE ENCLOSED AT: [STAIRWELL SIDEWALLS AT: 4TH FLOOR; [BEHIND SHOWERS/TUBS AT: 4TH, 3RD, 2ND, 1ST AND BASEMENT [PERIMETER WALLS AT NORTH STAIRWELL AT BASEMENT
Rated Assembly Inspection Partial 2/23/2018 2/23/2018 at 11:00 AM 02/23/2018
Misc
Partial Correction
09/29/2017
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; [2ND LAYER; 4TH FLOOR: [1ST LAYER INCLUDING PRE-ROCK; NORTH STAIRWELL: BASEMENT: [S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; [2ND LAYER; 4TH FLOOR: [1ST LAYER INCLUDING PRE-ROCK;
Misc
Partial Correction
09/29/2017
OK TO COVER WHEN READY 5/8" TYPE X GWB PRE-ROCK AT ELEVATOR: BASEMENT: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER;
All Rough Inspection - Commercial Partial 2/23/2018 at 11:35 AM 02/23/2018
Misc
Partial Correction
02/22/2018
OK TO COVER FRAMING & SYSTEMS TO BE ENCLOSED AT: STAIRWELL SIDEWALLS AT: 4TH FLOOR; BEHIND SHOWERS/TUBS AT: 4TH, 3RD, 2ND, 1ST AND BASEMENT PERIMETER WALLS AT NORTH STAIRWELL AT BASEMENT [ELEVATOR SHAFT FULL HEIGHT AFTER ONE MISSING SQUASH BLOCK IS IN PLACE @ 3RD FLOOR
Rated Assembly Inspection Partial 2/26/2018 2/26/2018 at 3:00 PM 02/26/2018
Misc
Partial Correction
02/23/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; [2ND LAYER; NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 1ST LAYER; [N & W WALLS - 1ST LAYER; 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; [2ND LAYER;
Misc
Partial Correction
02/23/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB PRE-ROCK AT ELEVATOR: BASEMENT: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER;
Rated Assembly Inspection Partial 2/27/2018 2/27/2018 at 9:40 AM 02/27/2018
Misc
Partial Correction
02/26/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; [N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER;
Misc
Partial Correction
02/26/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB PRE-ROCK AT ELEVATOR: BASEMENT: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER;
Rated Assembly Inspection Partial 2/28/2018 2/28/2018 at 10:05 AM 02/28/2018
Misc
Partial Correction
02/27/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; [N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER;
Misc
Partial Correction
02/27/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB PRE-ROCK AT ELEVATOR: BASEMENT: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; SHAFT FACE / LID: [1ST LAYER FULL HEIGHT;
Misc
Partial Correction
02/28/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: BEHIND TUBS & SHOWERS [1ST LAYER FLOORS 4TH, 3RD, 2ND, 1ST, BASEMENT; [SHEAR WALLS AT BASEMENT 1ST LAYER;
Rated Assembly Inspection Partial 3/1/2018 3/1/2018 at 1:15 PM 03/01/2018
Misc
Partial Correction
02/28/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER;
Misc
Partial Correction
02/28/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB PRE-ROCK AT ELEVATOR: BASEMENT: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; [2ND LAYER AT 4TH, 3RD, 2ND FLOORS;
Misc
Partial Correction
02/28/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: BEHIND TUBS & SHOWERS 1ST LAYER FLOORS 4TH, 3RD, 2ND, 1ST, BASEMENT; [2ND LAYER @ 4TH, 3RD, 2ND, 1ST, BASEMENT; [SHEAR WALLS AT: BASEMENT 1ST LAYER; 1ST & 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS;
Rated Assembly Inspection Partial 3/2/2018 3/2/2018 at 2:45 PM 03/02/2018
Misc
Partial Correction
03/01/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER;
Misc
Partial Correction
03/01/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB PRE-ROCK AT ELEVATOR: BASEMENT: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; [2ND LAYER FULL HEIGHT SHAFT LID: [3 LAYERS + HAT CHANNEL;
Misc
Partial Correction
03/01/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: BEHIND TUBS & SHOWERS 1ST LAYER FLOORS 4TH, 3RD, 2ND, 1ST, BASEMENT; [2ND LAYER @ 4TH, 3RD, 2ND, 1ST, BASEMENT; [SHEAR WALLS AT: BASEMENT 1ST LAYER; 1ST & 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS;
Rated Assembly Inspection Partial 3/5/2018 3/5/2018 at 2:05 PM 03/05/2018
Misc
Partial Correction
03/02/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER;
Misc
Partial Correction
03/02/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB PRE-ROCK AT ELEVATOR: BASEMENT: 1ST LAYER; 2ND LAYER 1ST FLOOR: 1ST LAYER; 2ND LAYER; 2ND FLOOR: 1ST LAYER; 2ND LAYER; SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SHAFT LID:[3 LAYERS + HAT CHANNEL; [4TH LAYER
Misc
Partial Correction
03/02/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT: BEHIND TUBS & SHOWERS 1ST LAYER FLOORS 4TH, 3RD, 2ND, 1ST, BASEMENT; 2ND LAYER @ 4TH, 3RD, 2ND, 1ST, BASEMENT; SHEAR WALLS AT: BASEMENT 1ST LAYER; 1ST & 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS;
All Rough Inspection - Commercial Partial 3/12/2018 3/12/2018 at 1:20 PM 03/12/2018
Misc
Partial Correction
02/23/2018
OK TO COVER FRAMING & SYSTEMS TO BE ENCLOSED AT: STAIRWELL SIDEWALLS AT: 4TH FLOOR; BEHIND SHOWERS/TUBS AT: 4TH, 3RD, 2ND, 1ST AND BASEMENT PERIMETER WALLS AT NORTH STAIRWELL AT BASEMENT; SHEAR WALL AT SAME LOCATION ELEVATOR SHAFT FULL HEIGHT AFTER ONE MISSING SQUASH BLOCK IS IN PLACE @ 3RD FLOOR WALLS AND ABOVE-CEILINGS AT:[4TH FLOOR INCLUDING STAIR TOWERS;
All Rough Inspection - Commercial Partial 3/13/2018 3/13/2018 at 1:55 PM 03/13/2018
Misc
Partial Correction
03/12/2018
OK TO COVER FRAMING & SYSTEMS TO BE ENCLOSED AT: STAIRWELL SIDEWALLS AT: 4TH FLOOR; BEHIND SHOWERS/TUBS AT: 4TH, 3RD, 2ND, 1ST AND BASEMENT PERIMETER WALLS AT NORTH STAIRWELL AT BASEMENT; SHEAR WALL AT SAME LOCATION ELEVATOR SHAFT FULL HEIGHT AFTER ONE MISSING SQUASH BLOCK IS IN PLACE @ 3RD FLOOR WALLS AND ABOVE-CEILINGS AT:4TH FLOOR INCLUDING STAIR TOWERS; [3RD FLOOR INCLUDING STAIRWELLS;
All Rough Inspection - Commercial Partial 3/14/2018 3/14/2018 at 1:30 PM 03/14/2018
Misc
Partial Correction
03/13/2018
OK TO COVER FRAMING & SYSTEMS TO BE ENCLOSED AT: STAIRWELL SIDEWALLS AT: 4TH FLOOR; BEHIND SHOWERS/TUBS AT: 4TH, 3RD, 2ND, 1ST AND BASEMENT PERIMETER WALLS AT NORTH STAIRWELL AT BASEMENT; SHEAR WALL AT SAME LOCATION ELEVATOR SHAFT FULL HEIGHT AFTER ONE MISSING SQUASH BLOCK IS IN PLACE @ 3RD FLOOR WALLS AND ABOVE-CEILINGS AT:4TH FLOOR INCLUDING STAIR TOWERS; 3RD FLOOR INCLUDING STAIRWELLS; [2ND FLOOR INCLUDING STAIRWELLS;
All Rough Inspection - Commercial Partial 3/15/2018 3/15/2018 at 3:05 PM 03/15/2018
Misc
Partial Correction
03/14/2018
OK TO COVER FRAMING & SYSTEMS TO BE ENCLOSED AT: STAIRWELL SIDEWALLS AT: 4TH FLOOR; BEHIND SHOWERS/TUBS AT: 4TH, 3RD, 2ND, 1ST AND BASEMENT PERIMETER WALLS AT NORTH STAIRWELL AT BASEMENT; SHEAR WALL AT SAME LOCATION ELEVATOR SHAFT FULL HEIGHT AFTER ONE MISSING SQUASH BLOCK IS IN PLACE @ 3RD FLOOR WALLS AND ABOVE-CEILINGS AT:4TH FLOOR INCLUDING STAIR TOWERS; 3RD FLOOR INCLUDING STAIRWELLS; 2ND FLOOR INCLUDING STAIRWELLS; [1ST FLOOR INCLUDING STAIRWELLS;
All Rough Inspection - Commercial Partial 3/16/2018 3/16/2018 at 10:50 AM 03/16/2018
Misc
Partial Correction
03/15/2018
OK TO COVER FRAMING & SYSTEMS TO BE ENCLOSED AT: STAIRWELL SIDEWALLS AT: 4TH FLOOR; BEHIND SHOWERS/TUBS AT: 4TH, 3RD, 2ND, 1ST AND BASEMENT PERIMETER WALLS AT NORTH STAIRWELL AT BASEMENT; SHEAR WALL AT SAME LOCATION ELEVATOR SHAFT FULL HEIGHT AFTER ONE MISSING SQUASH BLOCK IS IN PLACE @ 3RD FLOOR WALLS AND ABOVE-CEILINGS AT:4TH FLOOR INCLUDING STAIR TOWERS; 3RD FLOOR INCLUDING STAIRWELLS; 2ND FLOOR INCLUDING STAIRWELLS; 1ST FLOOR INCLUDING STAIRWELLS; OK TO COVER RC CHANNEL @ CEILINGS AND CORRIDOR WALLS AT: [4TH FLOOR;
Rated Assembly Inspection Partial 3/19/2018 3/19/2018 at 1:00 PM 03/19/2018
Misc
Partial Correction
03/05/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; [BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: [1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; [BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: [1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS;
Misc
Partial Correction
03/05/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT ELEVATOR: SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SHAFT LID: 3 LAYERS + HAT CHANNEL; 4TH LAYER BACK FACE AT UNITS AND CORRIDOR: [4TH FLOOR 1ST LAYER;
Misc
Partial Correction
03/05/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT CEILINGS & WALLS THROUGHOUT AT:
Sprinkler - Hydrostatic Test Passed 3/21/2018 03/21/2018
Rated Assembly Inspection Partial 3/22/2018 3/22/2018 at 1:05 PM 03/22/2018
Misc
Partial Correction
03/19/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; [BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; [2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; [BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: [1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS;
Misc
Partial Correction
03/19/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT ELEVATOR: SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SHAFT LID: 3 LAYERS + HAT CHANNEL; 4TH LAYER BACK FACE AT UNITS AND CORRIDOR: [4TH FLOOR 1ST LAYER;
Misc
Partial Correction
03/19/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT CEILINGS & WALLS THROUGHOUT AT:
All Rough Inspection - Commercial Partial 3/22/2018 at 1:35 PM 03/22/2018
Misc
Partial Correction
03/16/2018
OK TO COVER FRAMING & SYSTEMS TO BE ENCLOSED AT: STAIRWELL SIDEWALLS AT: 4TH FLOOR; BEHIND SHOWERS/TUBS AT: 4TH, 3RD, 2ND, 1ST AND BASEMENT PERIMETER WALLS AT NORTH STAIRWELL AT BASEMENT; SHEAR WALL AT SAME LOCATION ELEVATOR SHAFT FULL HEIGHT AFTER ONE MISSING SQUASH BLOCK IS IN PLACE @ 3RD FLOOR WALLS AND ABOVE-CEILINGS AT:4TH FLOOR INCLUDING STAIR TOWERS; 3RD FLOOR INCLUDING STAIRWELLS; 2ND FLOOR INCLUDING STAIRWELLS; 1ST FLOOR INCLUDING STAIRWELLS; OK TO COVER RC CHANNEL @ CEILINGS AND CORRIDOR WALLS AT: 4TH FLOOR; [3RD FLOOR;
All Rough Inspection - Commercial Partial 3/23/2018 3/23/2018 at 12:25 PM 03/23/2018
Misc
Partial Correction
03/22/2018
OK TO COVER FRAMING & SYSTEMS TO BE ENCLOSED AT: STAIRWELL SIDEWALLS AT: 4TH FLOOR; BEHIND SHOWERS/TUBS AT: 4TH, 3RD, 2ND, 1ST AND BASEMENT PERIMETER WALLS AT NORTH STAIRWELL AT BASEMENT; SHEAR WALL AT SAME LOCATION ELEVATOR SHAFT FULL HEIGHT AFTER ONE MISSING SQUASH BLOCK IS IN PLACE @ 3RD FLOOR WALLS AND ABOVE-CEILINGS AT:4TH FLOOR INCLUDING STAIR TOWERS; 3RD FLOOR INCLUDING STAIRWELLS; 2ND FLOOR INCLUDING STAIRWELLS; 1ST FLOOR INCLUDING STAIRWELLS; [BASEMENT INCLUDING STAIRWELLS OK TO COVER RC CHANNEL @ CEILINGS AND CORRIDOR WALLS AT: 4TH FLOOR; 3RD FLOOR;
Rated Assembly Inspection Partial 3/23/2018 at 1:10 PM 03/23/2018
Misc
Partial Correction
03/22/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; [2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; [2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS;
Misc
Partial Correction
03/22/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT ELEVATOR: SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SHAFT LID: 3 LAYERS + HAT CHANNEL; 4TH LAYER BACK FACE AT UNITS AND CORRIDOR: 4TH FLOOR 1ST LAYER; [3RD FLOOR 1ST LAYER;
Misc
Partial Correction
03/22/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT CEILINGS & WALLS THROUGHOUT AT: [4TH FLOOR;
Rated Assembly Inspection Partial 3/27/2018 3/27/2018 at 10:15 AM 03/27/2018
Misc
Partial Correction
03/23/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; [3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; [3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS;
Misc
Partial Correction
03/23/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT ELEVATOR: SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SHAFT LID: 3 LAYERS + HAT CHANNEL; 4TH LAYER BACK FACE AT UNITS AND CORRIDOR: 4TH FLOOR 1ST LAYER; 3RD FLOOR 1ST LAYER;
Misc
Partial Correction
03/23/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT CEILINGS & WALLS THROUGHOUT AT: 4TH FLOOR;
All Rough Inspection - Commercial Partial 3/27/2018 at 11:00 AM 03/27/2018
Misc
Partial Correction
03/23/2018
OK TO COVER FRAMING & SYSTEMS TO BE ENCLOSED AT: STAIRWELL SIDEWALLS AT: 4TH FLOOR; BEHIND SHOWERS/TUBS AT: 4TH, 3RD, 2ND, 1ST AND BASEMENT PERIMETER WALLS AT NORTH STAIRWELL AT BASEMENT; SHEAR WALL AT SAME LOCATION ELEVATOR SHAFT FULL HEIGHT AFTER ONE MISSING SQUASH BLOCK IS IN PLACE @ 3RD FLOOR WALLS AND ABOVE-CEILINGS AT:4TH FLOOR INCLUDING STAIR TOWERS; 3RD FLOOR INCLUDING STAIRWELLS; 2ND FLOOR INCLUDING STAIRWELLS; 1ST FLOOR INCLUDING STAIRWELLS; BASEMENT INCLUDING STAIRWELLS OK TO COVER RC CHANNEL @ CEILINGS AND CORRIDOR WALLS AT: 4TH FLOOR; 3RD FLOOR; [2ND FLOOR;
Rated Assembly Inspection Partial 3/29/2018 3/29/2018 at 12:40 PM 03/29/2018
Misc
Partial Correction
03/27/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; [4TH LAYER AT HIGH & LOW CEILINGS NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; [4TH LAYER AT HIGH & LOW CEILINGS
Misc
Partial Correction
03/27/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT ELEVATOR: SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SHAFT LID: 3 LAYERS + HAT CHANNEL; 4TH LAYER BACK FACE AT UNITS AND CORRIDOR: 4TH FLOOR 1ST LAYER; 3RD FLOOR 1ST LAYER;
Misc
Partial Correction
03/27/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT CEILINGS & WALLS THROUGHOUT AT: 4TH FLOOR; [3RD FLOOR;
All Rough Inspection - Commercial Partial 3/29/2018 at 1:30 PM 03/29/2018
Misc
Partial Correction
03/27/2018
OK TO COVER FRAMING & SYSTEMS TO BE ENCLOSED AT: STAIRWELL SIDEWALLS AT: 4TH FLOOR; BEHIND SHOWERS/TUBS AT: 4TH, 3RD, 2ND, 1ST AND BASEMENT PERIMETER WALLS AT NORTH STAIRWELL AT BASEMENT; SHEAR WALL AT SAME LOCATION ELEVATOR SHAFT FULL HEIGHT AFTER ONE MISSING SQUASH BLOCK IS IN PLACE @ 3RD FLOOR WALLS AND ABOVE-CEILINGS AT:4TH FLOOR INCLUDING STAIR TOWERS; 3RD FLOOR INCLUDING STAIRWELLS; 2ND FLOOR INCLUDING STAIRWELLS; 1ST FLOOR INCLUDING STAIRWELLS; BASEMENT INCLUDING STAIRWELLS OK TO COVER RC CHANNEL @ CEILINGS AND CORRIDOR WALLS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; [1ST FLOOR AT CORRIDOR, UNITS, & STORAGE ROOMS ONLY;
Rated Assembly Inspection Partial 3/30/2018 3/30/2018 at 10:40 AM 03/30/2018
Misc
Partial Correction
03/29/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; 4TH LAYER AT HIGH & LOW CEILINGS NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; 4TH LAYER AT HIGH & LOW CEILINGS
Misc
Partial Correction
03/29/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT ELEVATOR: SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SHAFT LID: 3 LAYERS + HAT CHANNEL; 4TH LAYER
Misc
Partial Correction
03/29/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT CEILINGS & WALLS THROUGHOUT AT: 4TH FLOOR; 3RD FLOOR; GWB AT SHEAR WALLS, BACKSIDE OF STAIRWELL AND ELEVATOR WALLS AT UNITS & CORRIDOR: 4TH FLOOR 1ST LAYER; 3RD FLOOR 1ST LAYER; [2ND FLOOR 1ST LAYER;
Rated Assembly Inspection Partial 4/3/2018 at 9:00 AM 04/03/2018
Misc
Partial Correction
03/30/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; 4TH LAYER AT HIGH & LOW CEILINGS NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; 4TH LAYER AT HIGH & LOW CEILINGS
Misc
Partial Correction
03/30/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT ELEVATOR: SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SHAFT LID: 3 LAYERS + HAT CHANNEL; 4TH LAYER
Misc
Partial Correction
03/30/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT CEILINGS & WALLS THROUGHOUT AT: 4TH FLOOR; 3RD FLOOR; [2ND FLOOR; GWB AT SHEAR WALLS, BACKSIDE OF STAIRWELL AND ELEVATOR WALLS AT UNITS & CORRIDOR: 4TH FLOOR 1ST LAYER; 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER;
All Rough Inspection - Commercial Partial 4/4/2018 at 1:55 PM 04/04/2018
Misc
Partial Correction
03/29/2018
OK TO COVER FRAMING & SYSTEMS TO BE ENCLOSED AT: STAIRWELL SIDEWALLS AT: 4TH FLOOR; BEHIND SHOWERS/TUBS AT: 4TH, 3RD, 2ND, 1ST AND BASEMENT PERIMETER WALLS AT NORTH STAIRWELL AT BASEMENT; SHEAR WALL AT SAME LOCATION ELEVATOR SHAFT FULL HEIGHT AFTER ONE MISSING SQUASH BLOCK IS IN PLACE @ 3RD FLOOR WALLS AND ABOVE-CEILINGS AT:4TH FLOOR INCLUDING STAIR TOWERS; 3RD FLOOR INCLUDING STAIRWELLS; 2ND FLOOR INCLUDING STAIRWELLS; 1ST FLOOR INCLUDING STAIRWELLS; BASEMENT INCLUDING STAIRWELLS OK TO COVER RC CHANNEL @ CEILINGS AND CORRIDOR WALLS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR AT CORRIDOR, UNITS, & STORAGE ROOMS ONLY; DROP CEILINGS/FUR-DOWNS/SOFFITS/BULKHEADS AT: [4TH FLOOR;
Rated Assembly Inspection Partial 4/5/2018 4/5/2018 at 1:45 PM 04/05/2018
Misc
Partial Correction
04/03/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; 4TH LAYER AT HIGH & LOW CEILINGS NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; 4TH LAYER AT HIGH & LOW CEILINGS
Misc
Partial Correction
04/03/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT ELEVATOR: SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SHAFT LID: 3 LAYERS + HAT CHANNEL; 4TH LAYER
Misc
Partial Correction
04/03/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT CEILINGS & WALLS THROUGHOUT AT: 4TH FLOOR; 3RD FLOOR; [2ND FLOOR; GWB AT SHEAR WALLS, BACKSIDE OF STAIRWELL AND ELEVATOR WALLS AT UNITS & CORRIDOR: 4TH FLOOR 1ST LAYER; 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; [1ST FLOOR 1ST LAYER;
Rated Assembly Inspection Partial 4/10/2018 4/11/2018 at 2:50 PM 04/11/2018
Misc
Partial Correction
04/05/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; 4TH LAYER AT HIGH & LOW CEILINGS NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; 4TH LAYER AT HIGH & LOW CEILINGS
Misc
Partial Correction
04/05/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT ELEVATOR: SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SHAFT LID: 3 LAYERS + HAT CHANNEL; 4TH LAYER
Misc
Partial Correction
04/05/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT CEILINGS & WALLS THROUGHOUT AT: 4TH FLOOR; 3RD FLOOR; [2ND FLOOR; GWB AT SHEAR WALLS, BACKSIDE OF STAIRWELL AND ELEVATOR WALLS AT UNITS & CORRIDOR: 4TH FLOOR 1ST LAYER; 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; [1ST FLOOR 1ST LAYER; 4/11: -2ND LAYER IN ELEVATOR ROOM -COMPLETE NAIL-OFF FOR 1ST FLOOR-OK -BASEMENT SHEAR WALLS-OK
Electrical Service Inspection Passed 4/11/2018 4/12/2018 at 10:20 AM 04/12/2018
Misc
Resolved
04/12/2018
-NEED TO REMOVE ENAMEL AND TIGHTEN GROUNDING LUGS -#3 CU BONDING JUMPER
Rated Assembly Inspection Partial 4/16/2018 4/16/2018 at 9:45 AM 04/16/2018
Misc
Partial Correction
04/11/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; 4TH LAYER AT HIGH & LOW CEILINGS NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; 4TH LAYER AT HIGH & LOW CEILINGS
Misc
Partial Correction
04/11/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT ELEVATOR: SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SHAFT LID: 3 LAYERS + HAT CHANNEL; 4TH LAYER
Misc
Partial Correction
04/11/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT CEILINGS & WALLS THROUGHOUT AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; GWB AT SHEAR WALLS, BACKSIDE OF STAIRWELL AND ELEVATOR WALLS AT UNITS & CORRIDOR: 4TH FLOOR 1ST LAYER; 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; 1ST FLOOR 1ST LAYER; -2ND LAYER IN ELEVATOR ROOM; [3RD LAYER + HAT CHANNEL; -COMPLETE NAIL-OFF FOR 1ST FLOOR-OK -BASEMENT SHEAR WALLS-OK
Rated Assembly Inspection Partial 4/17/2018 at 9:15 AM 04/17/2018
Misc
Resolved
04/17/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 1ST FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; 4TH LAYER AT HIGH & LOW CEILINGS NORTH STAIRWELL: BASEMENT: S & E WALLS - 1ST LAYER INCLUDING PRE-ROCK; S & E WALLS - 2ND LAYER; N & W WALLS - 1ST LAYER; N WALL - 2ND LAYER 1ST FLOOR: 2ND LAYER INCLUDING PRE-ROCK; 2ND FLOOR: 2ND LAYER PRE-ROCK ONLY; 3RD FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; 4TH FLOOR: 1ST LAYER INCLUDING PRE-ROCK; 2ND LAYER; BACK FACE AT UNITS AND CORRIDOR 1ST LAYER; TOWER & LANDING: 1ST LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 2ND LAYER AT HIGH & LOW CEILINGS & TOWER WALLS; 3RD LAYER + HAT CHANNEL AT HIGH & LOW CEILINGS; 4TH LAYER AT HIGH & LOW CEILINGS
Misc
Resolved
04/17/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT ELEVATOR: SHAFT FACE / LID: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT SHAFT LID: 3 LAYERS + HAT CHANNEL; 4TH LAYER
Misc
Partial Correction
04/16/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT CEILINGS & WALLS THROUGHOUT AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR; [BASEMENT INCLUDING STAIRWELLS, 2ND LAYER AT SHEAR WALLS, BACK FACE OF STAIRWELLS & ELEVATOR SHAFT + 4TH LAYER AT ELEVATOR MACHINE ROOM CEILING ALL OK TO TAPE, MUD AND FIRE-STOP GWB AT SHEAR WALLS, BACKSIDE OF STAIRWELL AND ELEVATOR WALLS AT UNITS & CORRIDOR: 4TH FLOOR 1ST LAYER; 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; 1ST FLOOR 1ST LAYER; -2ND LAYER IN ELEVATOR ROOM; 3RD LAYER + HAT CHANNEL; -COMPLETE NAIL-OFF FOR -OK -BASEMENT SHEAR WALLS-OK
Underground Electrical Inspection - Commercial Partial 5/8/2018 at 1:30 PM 05/08/2018
Misc
Partial Correction
05/08/2018
PVC CONDUIT TRENCHED/BORED: [FROM NEAR DRIVEWAY CURB W OF N END OF BLDG 3 G2, ONE 3/4" TO LOCATION OF MONUMENT SIGN TO BE BUILT @ DONOVAN RD & NW ENTRANCE DRIVE, ONE 3/4" BORED UNDER DRIVEWAY TO L.P. BASE AT W SIDE OF DRIVEWAY;
Underground Electrical Inspection - Commercial Partial 5/9/2018 5/9/2018 at 9:25 AM 05/09/2018
Misc
Partial Correction
05/08/2018
PVC CONDUIT TRENCHED/BORED: FROM NEAR DRIVEWAY CURB W OF N END OF BLDG 3 G2, ONE 3/4" TO LOCATION OF MONUMENT SIGN TO BE BUILT @ DONOVAN RD & NW ENTRANCE DRIVE, ONE 3/4" BORED UNDER DRIVEWAY TO L.P. BASE AT W SIDE OF DRIVEWAY; [ONE 3/4" ENTIRE LENGTH OF ISLAND W OF BLDG #7 + ONE 3/4" PART LENGTH -- THEN STUBBED EAST FOR CARPORT TO BE CONSTRUCTED;
Underground Electrical Inspection - Commercial Partial 6/19/2018 at 1:25 PM 06/19/2018
Misc
Partial Correction
05/09/2018
PVC CONDUIT TRENCHED/BORED: FROM NEAR DRIVEWAY CURB W OF N END OF BLDG 3 G2, ONE 3/4" TO LOCATION OF MONUMENT SIGN TO BE BUILT @ DONOVAN RD & NW ENTRANCE DRIVE, ONE 3/4" BORED UNDER DRIVEWAY TO L.P. BASE AT W SIDE OF DRIVEWAY; [ONE 3/4" ENTIRE LENGTH OF ISLAND W OF BLDG #7 + ONE 3/4" PART LENGTH -- THEN STUBBED EAST FOR CARPORT TO BE CONSTRUCTED; [BESIDE SIDEWALK ALONG W SIDE OF BLDG #5;
All Rough Inspection - Commercial Passed 4/4/2018 07/18/2018
Misc
Resolved
07/18/2018
OK TO COVER FRAMING & SYSTEMS TO BE ENCLOSED AT: STAIRWELL SIDEWALLS AT: 4TH FLOOR; BEHIND SHOWERS/TUBS AT: 4TH, 3RD, 2ND, 1ST AND BASEMENT PERIMETER WALLS AT NORTH STAIRWELL AT BASEMENT; SHEAR WALL AT SAME LOCATION ELEVATOR SHAFT FULL HEIGHT AFTER ONE MISSING SQUASH BLOCK IS IN PLACE @ 3RD FLOOR WALLS AND ABOVE-CEILINGS AT:4TH FLOOR INCLUDING STAIR TOWERS; 3RD FLOOR INCLUDING STAIRWELLS; 2ND FLOOR INCLUDING STAIRWELLS; 1ST FLOOR INCLUDING STAIRWELLS; BASEMENT INCLUDING STAIRWELLS OK TO COVER RC CHANNEL @ CEILINGS AND CORRIDOR WALLS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR AT CORRIDOR, UNITS, & STORAGE ROOMS ONLY; DROP CEILINGS/FUR-DOWNS/SOFFITS/BULKHEADS AT: [4TH FLOOR;
Rated Assembly Inspection Passed 4/17/2018 07/18/2018
Misc
Resolved
07/18/2018
OK TO COVER WHEN READY 5/8" TYPE X GWB AT CEILINGS & WALLS THROUGHOUT AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR; [BASEMENT INCLUDING STAIRWELLS, 2ND LAYER AT SHEAR WALLS, BACK FACE OF STAIRWELLS & ELEVATOR SHAFT + 4TH LAYER AT ELEVATOR MACHINE ROOM CEILING ALL OK TO TAPE, MUD AND FIRE-STOP GWB AT SHEAR WALLS, BACKSIDE OF STAIRWELL AND ELEVATOR WALLS AT UNITS & CORRIDOR: 4TH FLOOR 1ST LAYER; 3RD FLOOR 1ST LAYER; 2ND FLOOR 1ST LAYER; 1ST FLOOR 1ST LAYER; -2ND LAYER IN ELEVATOR ROOM; 3RD LAYER + HAT CHANNEL; -COMPLETE NAIL-OFF FOR -OK -BASEMENT SHEAR WALLS-OK
Rough Framing Inspection - Commercial Passed 4/17/2018 2/15/2018 07/18/2018
Misc
Resolved
07/18/2018
OK TO COVER WHEN READY: ATTACHED GARAGE PORTAL REINFORCING; STRAPS AT INTERIOR; [EXTERIOR WALL SHEATHING;
Misc
Resolved
07/18/2018
OK TO COVER WHEN READY OSB SHEAR WALLS AT STAIRWELLS AT: 1ST FLOOR;
Footing Inspection - Commercial Passed 7/18/2018 at 1:35 PM 07/18/2018
Underground Electrical Inspection - Commercial Partial 7/18/2018 07/18/2018
Misc
Partial Correction
06/19/2018
PVC CONDUIT TRENCHED/BORED: FROM NEAR DRIVEWAY CURB W OF N END OF BLDG 3 G2, ONE 3/4" TO LOCATION OF MONUMENT SIGN TO BE BUILT @ DONOVAN RD & NW ENTRANCE DRIVE, ONE 3/4" BORED UNDER DRIVEWAY TO L.P. BASE AT W SIDE OF DRIVEWAY; [ONE 3/4" ENTIRE LENGTH OF ISLAND W OF BLDG #7 + ONE 3/4" PART LENGTH -- THEN STUBBED EAST FOR CARPORT TO BE CONSTRUCTED; [BESIDE SIDEWALK ALONG W SIDE OF BLDG #5;
Underground Electrical Inspection - Commercial Partial 7/27/2018 7/27/2018 at 2:10 PM 07/27/2018
Misc
Partial Correction
07/18/2018
PVC CONDUIT TRENCHED/BORED: FROM NEAR DRIVEWAY CURB W OF N END OF BLDG 3 G2, ONE 3/4" TO LOCATION OF MONUMENT SIGN TO BE BUILT @ DONOVAN RD & NW ENTRANCE DRIVE, ONE 3/4" BORED UNDER DRIVEWAY TO L.P. BASE AT W SIDE OF DRIVEWAY; [ONE 3/4" ENTIRE LENGTH OF ISLAND W OF BLDG #7 + ONE 3/4" PART LENGTH -- THEN STUBBED EAST FOR CARPORT TO BE CONSTRUCTED; [BESIDE SIDEWALK ALONG W SIDE OF BLDG #5; 7/27-UE FOR SIDEWALK BOLLARD LIGHTS ALONG BUILDING 7, AND SIDEWALK ALONG SOUTH OF BUILDING 6
Underground Electrical Inspection - Commercial Passed 7/31/2018 7/31/2018 at 10:15 AM 07/31/2018
Misc
Partial Correction
07/27/2018
PVC CONDUIT TRENCHED/BORED: FROM NEAR DRIVEWAY CURB W OF N END OF BLDG 3 G2, ONE 3/4" TO LOCATION OF MONUMENT SIGN TO BE BUILT @ DONOVAN RD & NW ENTRANCE DRIVE, ONE 3/4" BORED UNDER DRIVEWAY TO L.P. BASE AT W SIDE OF DRIVEWAY; [ONE 3/4" ENTIRE LENGTH OF ISLAND W OF BLDG #7 + ONE 3/4" PART LENGTH -- THEN STUBBED EAST FOR CARPORT TO BE CONSTRUCTED; [BESIDE SIDEWALK ALONG W SIDE OF BLDG #5; 7/27-UE FOR SIDEWALK BOLLARD LIGHTS ALONG BUILDING 7, AND SIDEWALK ALONG SOUTH OF BUILDING 6
Miscellaneous Inspection Partial 8/17/2018 at 7:55 AM 08/17/2018
Miscellaneous Inspection Partial 8/17/2018 at 8:55 AM 08/17/2018
Miscellaneous Inspection Partial 8/17/2018 at 10:35 AM 08/17/2018
Occupancy Inspection - Water Utilities Passed 08/24/2018
Miscellaneous Inspection Partial 9/4/2018 at 7:10 AM 09/04/2018
Miscellaneous Inspection Partial 9/5/2018 at 7:10 AM 09/05/2018
Miscellaneous Inspection Partial 9/6/2018 at 9:00 AM 09/06/2018
Miscellaneous Inspection Partial 9/7/2018 at 9:05 AM 09/07/2018
Occupancy Inspection - Engineering Passed 9/21/2018 09/11/2018
Miscellaneous Inspection Partial 9/7/2018 at 1:10 PM 09/12/2018
Miscellaneous Inspection Partial 9/12/2018 at 7:10 AM 09/12/2018
Miscellaneous Inspection Partial 9/13/2018 at 1:05 PM 09/13/2018
Miscellaneous Inspection Partial 9/17/2018 at 7:00 AM 09/17/2018
Miscellaneous Inspection Partial 9/18/2018 at 10:05 AM 09/18/2018
Sprinkler - Flow Test Passed 9/18/2018 09/18/2018
Alarm Test Passed 9/18/2018 09/18/2018
Miscellaneous Inspection Partial 9/19/2018 at 7:20 AM 09/19/2018
Miscellaneous Inspection Passed 9/20/2018 09/20/2018
Occupancy Inspection - Fire Passed 9/21/2018 09/21/2018
Occupancy Inspection - Codes Commercial Temporary C of O 9/21/2018 at 1:10 PM 09/21/2018
Occupancy Inspection - Codes Commercial Partial 9/24/2018 at 7:10 AM 09/24/2018
Occupancy Inspection - Planning Passed 9/21/2018 09/25/2018
Occupancy Inspection - Codes Commercial Partial 10/3/2018 at 7:10 AM 10/03/2018
Occupancy Inspection - Codes Commercial Full C of O 10/17/2018 at 1:10 PM 10/17/2018
Documents & Images
Date Uploaded File Type Document Name
07/28/2016 Letter Fire Building Plan Review
08/08/2016 Site Map
09/22/2016 Letter Fire Building Plan Review
06/30/2017 Receipt Receipt for transaction: 2017-004536
07/17/2017 Letter Codes Building Permit
07/28/2017 Letter Inspection Summary
08/01/2017 Letter Inspection Summary
08/08/2017 Letter Inspection Summary
08/29/2017 Letter Inspection Summary
09/14/2017 Letter Inspection Summary
09/26/2017 Letter Inspection Summary
09/29/2017 Letter Inspection Summary
11/17/2017 Letter Inspection Summary
02/15/2018 Letter Inspection Summary
02/22/2018 Letter Inspection Summary
02/23/2018 Letter Inspection Summary
02/26/2018 Letter Inspection Summary
02/27/2018 Letter Inspection Summary
02/28/2018 Letter Inspection Summary
03/01/2018 Letter Inspection Summary
03/02/2018 Letter Inspection Summary
03/05/2018 Certificate/License Inspection Summary
03/12/2018 Letter Inspection Summary
03/13/2018 Letter Inspection Summary
03/14/2018 Letter Inspection Summary
03/15/2018 Letter Inspection Summary
03/16/2018 Letter Inspection Summary
03/19/2018 Letter Inspection Summary
03/22/2018 Letter Inspection Summary
03/23/2018 Letter Inspection Summary
03/27/2018 Letter Inspection Summary
03/29/2018 Letter Inspection Summary
03/30/2018 Letter Inspection Summary
04/03/2018 Letter Inspection Summary
04/04/2018 Letter Inspection Summary
04/05/2018 Letter Inspection Summary
04/11/2018 Letter Inspection Summary
04/12/2018 Letter Inspection Summary
04/16/2018 Letter Inspection Summary
04/17/2018 Letter Inspection Summary
05/08/2018 Letter Inspection Summary
05/09/2018 Letter Inspection Summary
06/19/2018 Letter Inspection Summary
07/18/2018 Letter Inspection Summary
07/18/2018 Letter Inspection Summary
07/27/2018 Letter Inspection Summary
07/31/2018 Letter Inspection Summary
09/21/2018 Letter Codes Temporary Certificate of Occupancy
10/17/2018 Letter Field Certificate of Occupancy
10/18/2018 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home