Permit Application Status

PRCOM20160190


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20160190
Building Permit - Commercial
Final Completion
MEL-ROSE BEACH INC
CHANGE OF TENANT
TENANT FINISH FOR DRIVE THRU RESTAURANT WITH SOME SEATING
02/10/2016
04/12/2016
09/26/2016
06/14/2016
Locations
Contacts
ABSOLUTE BUILDING CONCEPTS LLC, Address:4015 N BUCKNER TARSNEY RD, Phone:(816) 650-6000  
CHIEF HEATING & COOLING INC, Address:920 NW TECHNOLOGY DR, Phone:(816) 246-4646  
MIDWEST COMFORT HOMES LLC, Address:1012 NE JIB CT, Unit C, Phone:(816) 988-8297  
VAL GROSS PLUMBING, Address:615 E 23RD ST S STE B, Phone:(816) 254-9416  
ENVIRONETICS INC, Address:1617 SWIFT, Phone:(816) 741-9222  
MEL-ROSE BEACH INC, Address:4810 S ARROWHEAD DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Health Department Review Approved 02/23/2016 04/12/2016
Development Center
Building Plan Review Approved with Conditions 04/11/2016 04/11/2016
Joe Frogge
Gen - Submittal documents 7-137
Resolved
04/11/2016

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in three (3) sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Provide complete MEP designs prepared and sealed by MO State design professional. Information to include, but not be limited to-- Gas piping, Wire and Circuitry information, Grease ducts, Plumbing material schedule, piping diagrams, etc 3/28/16 - Provide plumbing material schedule. Provide verification that replacement rooftop HVAC equipment is equal or less weight than original. If heavier provide letter from structural engineer stating that existing structure is sufficient or provide design to strengthen roof. 4/11/16 - drawings updated
Misc
Resolved
04/11/2016

2012 IMC 506.5.3 Exhaust fan mounting. An upblast fan shall be hinged and supplied with a flexible weatherproof electrical cable to permit inspection and cleaning. The ductwork shall extend a minimum of 18 inches above the roof surface. Action required: Clarify on drawings. 3/28/16 - Unable to locate information on drawings. 4/11/16 - covered by adding a note
Bldg - Occupant load posting 1004.3
Corrective Action Required
04/04/2016

2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: Comment is for informational purposes. (to be verified at occupancy) 3/28/16 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
04/04/2016

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 3/28/16 - acknowledged in letter
Health Dept Review
Resolved
04/11/2016

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 3/28/16 - acknowledged in letter
Licensed Contractors Approved 04/04/2016 04/11/2016
Joe Frogge
Fire Plan Review Approved with Conditions 04/11/2016 04/06/2016
Joe Dir
Posting of occupant load
Corrective Action Required
04/04/2016

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ONLY ONE OCCUPANT LOAD SIGN NEEDED, POST THE SIGN BY THE MAIN ENTRANCE (VERIFIED AT INSPECTION)
Misc
Corrective Action Required
04/04/2016

ALL OTHER PREVIOUS CONDITIONS WERE ADDRESSED IN LETTER.
Fire Plan Review Approved with Conditions 03/30/2016 03/29/2016
Joe Dir
03/29/2016

03/29/2016

03/29/2016

03/29/2016

03/29/2016

03/29/2016

03/29/2016

Posting of occupant load
Corrective Action Required
03/23/2016

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ONLY ONE OCCUPANT LOAD SIGN NEEDED, POST THE SIGN BY THE MAIN ENTRANCE (VERIFIED AT INSPECTION) (VERIFIED AT INSPECTION)
Misc
Corrective Action Required
03/29/2016

ALL OTHER PREVIOUS CONDITIONS WERE ADDRESSED IN LETTER.
Building Plan Review Rejected 03/30/2016 03/29/2016
Joe Frogge
Gen - Submittal documents 7-137
Corrective Action Required
03/23/2016

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in three (3) sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Provide complete MEP designs prepared and sealed by MO State design professional. Information to include, but not be limited to-- Gas piping, Wire and Circuitry information, Grease ducts, Plumbing material schedule, piping diagrams, etc 3/28/16 - Provide plumbing material schedule. Provide verification that replacement rooftop HVAC equipment is equal or less weight than original. If heavier provide letter from structural engineer stating that existing structure is sufficient or provide design to strengthen roof.
Misc
Corrective Action Required
03/23/2016

2012 IMC 506.5.3 Exhaust fan mounting. An upblast fan shall be hinged and supplied with a flexible weatherproof electrical cable to permit inspection and cleaning. The ductwork shall extend a minimum of 18 inches above the roof surface. Action required: Clarify on drawings. 3/28/16 - Unable to locate information on drawings.
Bldg - Occupant load posting 1004.3
Corrective Action Required
03/23/2016

2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: Comment is for informational purposes. (to be verified at occupancy) 3/28/16 - acknowledged in letter
Bldg - Door swing 1008.1.2
Resolved
03/28/2016

2012 IBC 1008.1.2 – Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for possible exceptions.) Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Modify drawings. Door #100 must swing outward. 3/28/16 - drawings revised to comply
Health Dept Inspection
Corrective Action Required
03/23/2016

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 3/28/16 - acknowledged in letter
Health Dept Review
Corrective Action Required
03/23/2016

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 3/28/16 - acknowledged in letter
Licensed Contractors Approved 03/23/2016 03/28/2016
Joe Frogge
LC - MEP Subs
Resolved
03/28/2016

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (contractors listed on application do not have current licenses)
LC - General Contractor
Resolved
03/28/2016

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. (the request to waive Class B requirements was denied)
Building Plan Review Rejected 02/23/2016 02/16/2016
Joe Frogge
Health Dept Review
Corrective Action Required
02/16/2016

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
02/16/2016

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Bldg - Door swing 1008.1.2
Corrective Action Required
02/16/2016

2012 IBC 1008.1.2 – Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for possible exceptions.) Doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Modify drawings. Door #100 must swing outward.
Bldg - Occupant load posting 1004.3
Corrective Action Required
02/16/2016

2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: Comment is for informational purposes. (to be verified at occupancy)
Misc
Corrective Action Required
02/16/2016

2012 IMC 506.5.3 Exhaust fan mounting. An upblast fan shall be hinged and supplied with a flexible weatherproof electrical cable to permit inspection and cleaning. The ductwork shall extend a minimum of 18 inches above the roof surface. Action required: Clarify on drawings.
Gen - Submittal documents 7-137
Corrective Action Required
02/16/2016

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in three (3) sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Provide complete MEP designs prepared and sealed by MO State design professional. Information to include, but not be limited to-- Gas piping, Wire and Circuitry information, Grease ducts, Plumbing material schedule, piping diagrams, etc
Licensed Contractors Rejected 02/23/2016 02/16/2016
Joe Frogge
LC - General Contractor
Corrective Action Required
02/16/2016

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. (the request to waive Class B requirements was denied)
LC - MEP Subs
Corrective Action Required
02/16/2016

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (contractors listed on application do not have current licenses)
Fire Plan Review Approved with Conditions 02/23/2016 02/12/2016
Joe Dir
Misc
Corrective Action Required
02/12/2016

THE EXSISTING HOOD SHALL BE CURRENT WITH ALL OF THE SERVICING & MAINTINANCE REQUIRED FOR A TYPE-1 HOOD AND SUPRESSION SYSTEM. (INFOMATION PURPOSES) (VERIFED AT INSPECTION)
Construction documents - Fire protection systems
Corrective Action Required
02/12/2016

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. PROVIDE THE SPECS ON THE TYPE-1 SUPRESSION HOOD SYSTEM AND HOOD. (INFROMATION PURPOSES)
Installation acceptance testing
Corrective Action Required
02/12/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACCEPTANCE TESTING SHALL BE REQUIRED FOR THE NEW HOOD. TO SCHEDULE A TEST CONTACT THE FIRE DEPARTMENT AT 816-969-1300
Portable fire extinguishers - general
Corrective Action Required
02/12/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. PROVIDE RATED (5POUND) 2A-10BC FIRE EXTINGUISHERS IF NOT ALREADY EXSISTING. EXSISTING FIRE EXTINGUISHERS SHALL BE CURRENT WITH ANY REQUIRED MAINTINANCE AOR SERVICE. VERFIED AT INSPECTION
Posting of occupant load
Corrective Action Required
02/12/2016

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. POST THE OCCUPANT LOAD AS FIGURED ON THE PLANS. POST SIGNAGE ON THE INTERIOR CLOSE TO THE MAIN ENTRANCE. VERIFIED AT INSPECTION.
Address numbers required
Corrective Action Required
02/12/2016

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). IF NOT EXSISTING POST THE NUMERIC ADDRESS ON THE BUILDING READABLE FROM THE ROADWAY.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
02/12/2016

2012 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. PROVIDE A K CLASS FIRE EXTINGUISHER FOR EACH HOOD. VERIFIED AT INSPECTION.
Misc
Corrective Action Required
02/12/2016

EACH KITCHEN HOOD AND REMOTE EMERGENCY PULL SHALL BE ADDRESSED SEPERATELY WITH EITHER NUMERIC OR ALBETIC DESIGNATIONS. VERIFIED AT INSPECTION.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $122.00 $122.00 Paid 04/12/2016
8331507-Sewer Connection Fee $30.00 $30.00 Paid 04/12/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 4/19/2016 4/19/2016 04/19/2016
Above Ceiling Inspection Partial 04/19/2016
Gas Service Inspection - Commercial Failed 4/26/2016 04/26/2016
Misc
Corrective Action Required
04/26/2016
LSCO 7-608: GAS PIPING TEST PRESSURE DECREASED DURING MONITORING PERIOD. CORRECT AND PRESSURIZE PIPING SYSTEM TO HOLD STEADY AT MINIMUM 10 PSI
In-wall Inspection Partial 4/26/2016 04/26/2016
Misc
Partial Correction
04/26/2016
NO ISSUES FOUND ON VISUAL INSPECTION OF NEW & MODIFIED WALL AREAS IN KITCHEN. HOWEVER, GAS PRESSURE TEST MUST BE APPROVED BEFORE COVERING.
Gas Piping Inspection - Commercial Passed 4/27/2016 4/27/2016 04/27/2016
Hood/Duct Inspection Partial 4/27/2016 04/27/2016
Misc
Partial Correction
04/27/2016
GREASE DUCT LIGHT TEST: VERTICAL STRAIGHT SECTION: OK TO INSTALL AFTER ONE HOLE AT JOINT CORNER IS WELDED;
In-wall Inspection Passed 4/27/2016 04/27/2016
Misc
Resolved
04/27/2016
NO ISSUES FOUND ON VISUAL INSPECTION OF NEW & MODIFIED WALL AREAS IN KITCHEN. HOWEVER, GAS PRESSURE TEST MUST BE APPROVED BEFORE COVERING.
Hood/Duct Inspection Partial 5/13/2016 5/13/2016 05/13/2016
Misc
Partial Correction
04/27/2016
GREASE DUCT LIGHT TEST: VERTICAL STRAIGHT SECTION: OK TO INSTALL AFTER ONE HOLE AT JOINT CORNER IS WELDED; REMAINDER OF SHOP-WELDED SECTIONS LIGHT-TESTED. HOLES DETECTED TO BE SPOT-WELDED PRIOR TO INSTALLATION. THEN CALL FOR INSPECTION FOR ALL FIELD WELDS TO BE LIGHT-TESTED.
Hood/Duct Inspection Not Ready 5/18/2016 05/18/2016
Misc
Partial Correction
05/13/2016
GREASE DUCT LIGHT TEST: VERTICAL STRAIGHT SECTION: OK TO INSTALL AFTER ONE HOLE AT JOINT CORNER IS WELDED; REMAINDER OF SHOP-WELDED SECTIONS LIGHT-TESTED. HOLES DETECTED TO BE SPOT-WELDED PRIOR TO INSTALLATION. THEN CALL FOR INSPECTION FOR ALL FIELD WELDS TO BE LIGHT-TESTED.
Misc
Corrective Action Required
05/18/2016
NO HVAC PERSONNEL ON SITE FOR REQUESTED "EARLY" INSPECTION
Hood/Duct Inspection Partial 5/18/2016 05/18/2016
Misc
Partial Correction
05/18/2016
GREASE DUCT LIGHT TEST: SEAMS AND JOINTS LIGHT-TESTED. OK FOR 1ST LAYER FIRE-WRAP. THEN CALL TO REQUEST INSPECTION.
Misc
Resolved
05/18/2016
NO HVAC PERSONNEL ON SITE FOR REQUESTED "EARLY" INSPECTION
Misc
Corrective Action Required
05/18/2016
IMC 507.16 COMMERCIAL KITCHEN GREASE HOOD PERFORMANCE TEST: NEBB-CERTIFIED REPORT REQUIRED TO BE SUBMITTED TO INSPECTOR WHEN EQUIPMENT IS OPERATIONAL AND BEFORE COMMERCIAL USE. SMOKE CAPTURE TEST TO BE CERTIFIED BY 3RD PARTY OR WITNESSED BY INSPECTOR BEFORE ANY USE IS APPROVED.
Above Ceiling Inspection Passed 5/31/2016 5/31/2016 05/31/2016
Alternate Protection Systems Inspection Passed 6/9/2016 06/09/2016
Occupancy Inspection - Fire Passed 6/9/2016 06/09/2016
Final Inspection - Commercial Failed 6/9/2016 6/9/2016 06/09/2016
Misc
Corrective Action Required
06/09/2016
CHECK ALL ELECTRICAL PANEL LABELS, CIRCUIT POSITION NUMBERS, AND CIRCUIT BREAKER LABELS. UPDATE AND CORRECT TO PRODUCE CURRENT, ACCURATE AND LEGIBLE LABELING.
Misc
Corrective Action Required
06/09/2016
ROOFTOP: - SUPPORT GAS PIPE AT 90'S AND TEE'S - ENSURE GAS PIPE IS STRAPPED AT ALL SUPPORT BLOCKS - ATTACH SLIP SHEETS TO PIPE SUPPORT BLOCKS - ELECTRICAL RECEPTACLES AT WET LOCATIONS MUST HAVE IN-USE COVERS
Final Inspection - Commercial Passed 6/13/2016 06/13/2016
Misc
Resolved
06/13/2016
CHECK ALL ELECTRICAL PANEL LABELS, CIRCUIT POSITION NUMBERS, AND CIRCUIT BREAKER LABELS. UPDATE AND CORRECT TO PRODUCE CURRENT, ACCURATE AND LEGIBLE LABELING.
Misc
Resolved
06/13/2016
ROOFTOP: - SUPPORT GAS PIPE AT 90'S AND TEE'S - ENSURE GAS PIPE IS STRAPPED AT ALL SUPPORT BLOCKS - ATTACH SLIP SHEETS TO PIPE SUPPORT BLOCKS - ELECTRICAL RECEPTACLES AT WET LOCATIONS MUST HAVE IN-USE COVERS
Documents & Images
Date Uploaded File Type Document Name
02/12/2016 Letter Fire Building Plan Review
02/16/2016 Letter Codes P/R Corrections Document
03/29/2016 Letter Fire Building Plan Review
03/30/2016 Letter Codes P/R Corrections Document
04/06/2016 Letter Fire Building Plan Review
04/11/2016 Letter Codes P/R Corrections Document
04/11/2016 Letter Codes Plan Review Conditions
04/11/2016 Letter Codes Building Permit
04/12/2016 Receipt Receipt for transaction: 2016-001099
04/19/2016 Letter Inspection Summary
04/26/2016 Letter Inspection Summary
04/27/2016 Letter Inspection Summary
04/27/2016 Letter Inspection Summary
05/13/2016 Letter Inspection Summary
05/18/2016 Letter Inspection Summary
05/18/2016 Letter Inspection Summary
05/31/2016 Letter Inspection Summary
06/09/2016 Letter Inspection Summary
06/13/2016 Letter Inspection Summary
07/13/2016 Letter DOC071316-005
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home