Summary
PRCOM20152944
Building Permit - Commercial
Final Completion
NEWTON MARILYN S-TRUSTEE
NEW COMMERCIAL
NEW STORAGE BUILDING
12/28/2015
01/13/2016
03/11/2016
Locations
Contacts
IRONWOOD CONSTRUCTION CO LLC, Address:31588 W 271ST ST, Phone:(913) 557-9090  
SULLIVAN PALMER ARCHITECTS, Address:8849 LONG, Phone:(913) 888-8540  
NEWTON MARILYN S-TRUSTEE, Address:2013 NW N ST  
BOISE CASCADE BUILDING MATERIALS DISTRIBUTION LLC, Address:1111 W JEFFERSON ST STE 300, Phone:(816) 347-7448  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 01/12/2016 01/13/2016
Development Center
LC - General Contractor
Resolved
01/13/2016

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
Building Plan Review Approved 01/12/2016 01/11/2016
Joe Frogge
Fire Plan Review Approved with Conditions 01/12/2016 12/29/2015
Joe Dir
Address numbers required
Corrective Action Required
12/29/2015

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). IF THE BUILDING IS HAVE A NUMERIC OR ALPHBETIC DESIGNATED ADDRESS, POST THE NUMERIC OR ALPHBETIC DESIGNATION ON THE BUILDING
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $316.32 $316.32 Paid 01/13/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Not Ready 1/29/2016 (11:30) 1/29/2016 01/29/2016
Misc
Corrective Action Required
01/29/2016
RE-BAR NOT IN PLACE FOR INSPECTION
Piers/Caissons Inspection - Commercial Not Ready 1/29/2016 01/29/2016
Misc
Corrective Action Required
01/29/2016
RE-BAR NOT IN PLACE FOR INSPECTION; SOME HOLES DRIILED OFF-CENTER; MINIMUM 3" CLEARANCE REQUIRED FROM RE-BAR TO DIRT AT BOTTOMS & BANKS.
Occupancy Inspection - Fire Passed 3/10/2016 03/10/2016
Final Inspection - Commercial Passed 3/10/2016 03/10/2016
Occupancy Inspection - Planning Passed 03/10/2016
Documents & Images
Date Uploaded File Type Document Name
12/29/2015 Letter Fire Building Plan Review
01/11/2016 Letter Codes P/R Corrections Document
01/13/2016 Letter Codes Plan Review Conditions
01/13/2016 Letter Codes Building Permit
01/13/2016 Receipt Receipt for transaction: 2016-000112
01/29/2016 Letter Inspection Summary
03/10/2016 Letter Inspection Summary
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home