Permit Application Status

PRCOM20152639


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20152639
Building Permit - Commercial
Certificate of Occupancy
TA KS/MO LLC
ALTERATION COMMERCIAL
INTERIOR ALTERATIONS ** plans are in plan review file
11/10/2015
12/02/2015
05/10/2016
03/04/2016
Locations
Contacts
POWERHOUSE RETAIL SERVICES LLC, Address:812 S CROWLEY RD STE A, Phone:(817) 297-8575  
MAX ELECTRIC INC, Address:705 BLUE RIDGE EXT, Phone:(816) 965-7555  
TA KS/MO LLC, Address:24601 CENTER RIDGE RD  
KEVIN GINNINGS PLUMBING SERVICE INC, Address:PO BOX 6, Phone:(816) 380-6316  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 12/30/2015 12/30/2015
Jim Eden
Address numbers required
Resolved
12/30/2015

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF 5050 ON THE EXTERIOR OF THE BUILDING, READABLE FROM THE ROADWAY. VERIFIED AT INSPECTION.
Installation acceptance testing
Corrective Action Required
12/30/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. TESTING WILL BE REQUIRED FOR ANY EMERGENCY PUMP SHUT OFF DEVICES RELOACTED AND OR REPLACED. INFORMATION PURPOSES.
Misc
Resolved
12/30/2015

PLANS DON'T SHOW LOCATION OF FIRE EXTINGUISHERS ON INTERIOR OR EXTERIOR. (ADDRESSED IN RE-SUBMITTAL)
Licensed Contractors Approved 11/23/2015 12/01/2015
Development Center
LC - MEP Subs
Corrective Action Required
11/23/2015

MEP Subs: No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Health Department Review Approved 05/10/2016 11/30/2015
Joe Frogge
Fire Plan Review Approved with Conditions 12/02/2015 11/25/2015
Joe Dir
Address numbers required
Corrective Action Required
11/23/2015

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF 5050 ON THE EXTERIOR OF THE BUILDING, READABLE FROM THE ROADWAY. VERIFIED AT INSPECTION.
Installation acceptance testing
Corrective Action Required
11/23/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. TESTING WILL BE REQUIRED FOR ANY EMERGENCY PUMP SHUT OFF DEVICES RELOACTED AND OR REPLACED. INFORMATION PURPOSES.
Misc
Resolved
12/30/2015

PLANS DON'T SHOW THE LOCATION OF THE EMERGENCY PUMP SHUT OFF SWITCHES ON THE INTERIOR OR EXTERIOR. lOCATIONS TO BE DETERMINED LATER BY SUB CONTRACTOR
Misc
Corrective Action Required
11/23/2015

PLANS DON'T SHOW LOCATION OF FIRE EXTINGUISHERS ON INTERIOR OR EXTERIOR. (ADDRESSED IN RE-SUBMITTAL)
Building Plan Review Approved with Conditions 12/02/2015 11/24/2015
Joe Frogge
Health Dept Inspection
Corrective Action Required
11/23/2015

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Review
Resolved
11/30/2015

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Building Plan Review Rejected 11/20/2015 11/12/2015
Joe Frogge
Health Dept Inspection
Corrective Action Required
11/12/2015

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
11/12/2015

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Licensed Contractors Rejected 11/20/2015 11/12/2015
Joe Frogge
LC - MEP Subs
Corrective Action Required
11/12/2015

MEP Subs: No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 11/20/2015 11/12/2015
Joe Dir
Misc
Corrective Action Required
11/12/2015

NO INFORMATION ADVISING IF STORE IS TO REMAIN OPEN DURING THE REFIT PROCESS. IF STORE IS TO REMAIN OPEN, ALL EMERGENCY PUMP SHUT OFF SWITCHES ARE TO REAMIN IN OPERATION. FIRE EXTINGUISHER TO REMAIN AVAILABLE
Address numbers required
Corrective Action Required
11/12/2015

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF 5050 ON THE EXTERIOR OF THE BUILDING, READABLE FROM THE ROADWAY. VERIFIED AT INSPECTION.
Installation acceptance testing
Corrective Action Required
11/12/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. TESTING WILL BE REQUIRED FOR ANY EMERGENCY PUMP SHUT OFF DEVICES RELOACTED AND OR REPLACED. INFORMATION PURPOSES.
Misc
Corrective Action Required
11/12/2015

PLANS DON'T SHOW THE LOCATION OF THE EMERGENCY PUMP SHUT OFF SWITCHES ON THE INTERIOR OR EXTERIOR.
Misc
Corrective Action Required
11/12/2015

PLANS DON'T SHOW LOCATION OF FIRE EXTINGUISHERS ON INTERIOR OR EXTERIOR.
Misc
Corrective Action Required
11/12/2015

NO INFORMATION STATING IF THE STORE WILL BE A ATTENDED 24 HOUR STORE OR A UNATTENDED 24 HOUR STORE.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $504.76 $504.76 Paid 12/01/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 12/11/2015 12/11/2015 at 12:00 AM 12/11/2015
Above Ceiling Inspection Failed 12/11/2015 at 12:00 AM 12/11/2015
Misc
Corrective Action Required
12/11/2015
-INSTALL INDEPENDENT SUPPORT WIRES FOR THE MC CABLE AND COLOR TAG OR PAINT THE SUPPORT WIRES -SUPPORT ALL LIGHT FIXTURES AT TWO CORNERS -SUPPORT ALL LOW VOLTAGE WIRING IN A NEAT AND WORKMAN-LIKE MANNER -REMOVE ABANDONED ELECTRICAL
Above Ceiling Inspection Passed 12/15/2015 12/15/2015 12/15/2015
Misc
Resolved
12/15/2015
-INSTALL INDEPENDENT SUPPORT WIRES FOR THE MC CABLE AND COLOR TAG OR PAINT THE SUPPORT WIRES -SUPPORT ALL LIGHT FIXTURES AT TWO CORNERS -SUPPORT ALL LOW VOLTAGE WIRING IN A NEAT AND WORKMAN-LIKE MANNER -REMOVE ABANDONED ELECTRICAL
Occupancy Inspection - Codes Commercial Partial 2/19/2016 2/19/2016 02/19/2016
Misc
Corrective Action Required
02/19/2016
-INSTALL A BACKFLOW VALVE UPSTREAM OF THE WATER SUPPLY TO SODA MACHINE&FILTER
Occupancy Inspection - Fire Passed 2/19/2016 02/19/2016
Occupancy Inspection - Codes Commercial Full C of O 3/4/2016 3/4/2016 03/04/2016
Misc
Resolved
03/04/2016
-INSTALL A BACKFLOW VALVE UPSTREAM OF THE WATER SUPPLY TO SODA MACHINE&FILTER
Documents & Images
Date Uploaded File Type Document Name
11/12/2015 Letter Fire Building Plan Review
11/12/2015 Letter Codes P/R Corrections Document
11/25/2015 Letter Fire Building Plan Review
12/01/2015 Receipt Receipt for transaction: 2015-006280
12/01/2015 Letter Codes Building Permit
12/01/2015 Letter Codes Plan Review Conditions
12/11/2015 Letter Inspection Summary
12/15/2015 Letter Inspection Summary
02/19/2016 Letter Inspection Summary
03/04/2016 Letter Field Certificate of Occupancy
03/28/2016 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home