Permit Application Status

PRCOM20152332


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20152332
Building Permit - Commercial
Final Completion
LBC INVESTMENTS LLC
NEW OTHER (COMMERCIAL)
LAWN IRRIGATION WITH DEDUCT METER. NO HEADS OR LINES LOCATED N THE RIGHT OF WAY.
10/08/2015
10/09/2015
12/21/2015
Locations
Contacts
LITTLE DIXIE CONSTRUCTION LLC, Address:1431 CINNAMON HILL LN STE 209, Phone:(573) 449-7200  
LBC INVESTMENTS LLC, Address:302 CAMPUSVIEW DR STE 211  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/22/2015 10/09/2015
Development Center
Building Plan Review Approved with Conditions 10/22/2015 10/08/2015
Mike Weisenborn
Misc
Corrective Action Required
10/09/2015

The irrigation system can be used for lawn irrigation only. There can be no connection or means of connection to any other water features or uses, such as yard hydrants, fountains, ponds, etc.
Misc
Corrective Action Required
10/09/2015

The submeter is not provided by Water Utilities. It is a privately owned meter that must be maintained by the owner. Any failure of the submeter will result in a credit based on actual meter reads. There will be no estimation during the time period of a failure.
Misc
Corrective Action Required
10/09/2015

The submeter should be a Badger, Hersey or Sensus Omni. It should be a radio equipped meter with an Itron 60W or 100W ERT.
Misc
Corrective Action Required
10/09/2015

A submeter inspection will need to be called for through the Water Department prior to any backfilling so that the irrigation tap and installed submeter can be inspected. We will begin the sewer credit based on the read on the meter at the time of inspection. Please call 816-969-1911 or 816-969-1930 to schedule the inspection.
Final Development Plan Review Approved 10/22/2015 10/08/2015
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Other $67.62 $67.62 Paid 10/09/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Inspection - Commercial Passed 12/21/2015
Occupancy Inspection - Planning Temporary C of O 12/21/2015
Corrective Action Required
12/21/2015
The enclosure doors appear to be made of a plastic. If this is the case, that will not meet our code. Per our development ordinance: Trash enclosures – All exterior trash storage containers shall be screened so that they are not visible from off the property. Each trash enclosure shall be constructed of masonry walls with a steel gate painted to be compatible with the color of the masonry walls and building it is to serve. The plans (Sheet A5.0) also call out “gate with metal sliding slats – paint to match CMU”. No Certificate of Occupancy can be granted by Planning until this is resolved.
Occupancy Inspection - Planning Passed 01/27/2016
Documents & Images
Date Uploaded File Type Document Name
10/09/2015 Receipt Receipt for transaction: 2015-005692
10/09/2015 Letter Codes Plan Review Conditions
10/09/2015 Letter Codes Building Permit
10/09/2015 Letter Codes Plan Review Conditions
10/09/2015 Drawing DOC100915
12/21/2015 Letter Inspection Summary
01/27/2016 Letter Inspection Summary
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home