Permit Application Status

PRCOM20151264


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20151264
Building Permit - Commercial
Final Completion
ROCKY TOP HOLDINGS LLC
ALTERATION COMMERCIAL
WHITE BOX FOR FUTURE TENANT TENANT
06/04/2015
06/25/2015
12/12/2015
08/08/2016
Locations
Contacts
ROCKY TOP HOLDINGS LLC, Address:244 W MILL ST STE 101  
SCHARHAG ARCHITECTS, Address:310 ARMOR RD, #22, Phone:(816) 221-9297  
PHOENIX CONSTRUCTION INC, Address:1305 HOLLY CT, Phone:(816) 716-8208  
4SIGHT GROUP LLC, Address:7920 WARD PKWY, Phone:(816) 802-8400  
BRADLEY-READE INC, Address:810 W 7TH AVE, Phone:(816) 898-2947  
ALWAYS PLUMBING LLC, Address:807 NASHUA ROAD, Phone:(819) 781-7749  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/23/2015 06/24/2015
Joe Frogge
LC - General Contractor
Resolved
06/24/2015

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
06/24/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Building Plan Review Approved 06/30/2015 06/23/2015
Khanh Nguyen
Misc
Resolved
06/23/2015

Incomplete information in electric service diagram Action required: Expand diagram to include metering scenario. Also, grounding is to occur at main source of disconnect which probably can't be inside in this case. Exterior disconnect switches will also be required. Please review updated diagram with electrical engineer or licensed electrician prior to resubmitting.
Fire Plan Review Approved with Conditions 06/30/2015 06/23/2015
Development Center
Construction documents - Fire protection systems
Corrective Action Required
06/23/2015

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Fire Plan Review Approved with Conditions 06/16/2015 06/15/2015
Joe Dir
Construction documents - Fire protection systems
Corrective Action Required
06/15/2015

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Building Plan Review Rejected 06/16/2015 06/11/2015
Joe Frogge
Misc
Corrective Action Required
06/11/2015

Incomplete information in electric service diagram Action required: Expand diagram to include metering scenario. Also, grounding is to occur at main source of disconnect which probably can't be inside in this case. Exterior disconnect switches will also be required. Please review updated diagram with electrical engineer or licensed electrician prior to resubmitting.
Licensed Contractors Rejected 06/16/2015 06/11/2015
Joe Frogge
LC - General Contractor
Corrective Action Required
06/11/2015

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
06/11/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $30.00 $30.00 Paid 06/25/2015
8331507-Sewer Connection Fee $60.00 $60.00 Paid 06/25/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Not Ready 6/30/2015 6/30/2015 at 12:00 AM 06/30/2015
Misc
Corrective Action Required
06/30/2015
CALLED DAVE @ 816-918-0858 BUT THE PHONE NUMBER IS DISCONNECTED/NOT CONNECTING.
Underslab Plumbing Inspection - Commercial Passed 7/1/2015 7/1/2015 at 12:00 AM 07/01/2015
Misc
Resolved
07/01/2015
CALLED DAVE @ 816-918-0858 BUT THE PHONE NUMBER IS DISCONNECTED/NOT CONNECTING.
Electrical Service Inspection Passed 7/15/2015 7/15/2015 at 12:00 AM 07/15/2015
Investigation Inspection Complete 1/12/2016 01/12/2016
Documents & Images
Date Uploaded File Type Document Name
06/15/2015 Letter Final Plan Review Conditions
06/15/2015 Letter Codes P/R Corrections Document
06/24/2015 Letter Codes Plan Review Conditions
06/25/2015 Letter Codes Building Permit
06/25/2015 Receipt Receipt for transaction: 2015-003430
06/30/2015 Letter Inspection Summary
07/01/2015 Letter Inspection Summary
07/15/2015 Letter Inspection Summary
01/12/2016 Letter Codes 140 Day Letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home