Permit Application Status

PRCOM20150238


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20150238
Building Permit - Commercial
Final Completion
ARCP WG LEES SUMMIT(LANGSFORD) MO LLC
ALTERATION COMMERCIAL
INTERIOR ALTERATION TO ADD CONSULTING ROOM IN EXISTING PHARMACY *NO PLUMBING WORK
02/10/2015
08/03/2015
09/29/2015
Locations
Contacts
FULCRUM EXPRESS, INC, Address:1945 THE EXCHANGE, SUITE 400, Phone:(770) 612-8005  
CHIEF HEATING & COOLING INC, Address:920 NW TECHNOLOGY DR, Phone:(816) 246-4646  
STALEY INC, Address:3400 JE DAVIS DR, Phone:(501) 565-3006  
RSP ARCHITECTS, Address:1220 MARSHALL ST NE, Phone:(612) 677-7304  
ARCP WG LEES SUMMIT(LANGSFORD) MO LLC, Address:2325 E CAMELBACK RD STE 1100  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/03/2015
Development Center
LC - General Contractor
Corrective Action Required
02/13/2015

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
02/13/2015

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Building Plan Review Approved 02/23/2015 02/13/2015
Joe Frogge
Fire Plan Review Approved 02/23/2015 02/11/2015
Brian Austerman
Misc
Corrective Action Required
02/11/2015

Provide sprinkler and or alarm plans showing work done if any alterations are required
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $122.95 $122.95 Paid 08/03/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Framing Inspection - Commercial Passed 8/5/2015 8/5/2015 at 12:00 AM 08/05/2015
Rough Electrical Inspection - Commercial Partial 8/5/2015 8/5/2015 at 12:00 AM 08/05/2015
Misc
Partial Correction
08/05/2015
MAKE UP BOXES AND DEMO ELECTRIC WHERE DOOR GOES.
Occupancy Inspection - Fire Passed 9/29/2015 at 12:00 AM 09/29/2015
Final Inspection - Commercial Passed 9/29/2015 at 12:00 AM 09/29/2015
Rough Electrical Inspection - Commercial Passed 8/5/2015 at 12:00 AM 09/29/2015
Misc
Resolved
09/29/2015
MAKE UP BOXES AND DEMO ELECTRIC WHERE DOOR GOES.
Documents & Images
Date Uploaded File Type Document Name
02/11/2015 Letter Fire Building Plan Review
02/13/2015 Letter Codes P/R Corrections Document
08/03/2015 Letter Codes Plan Review Conditions
08/03/2015 Letter Codes Building Permit
08/03/2015 Receipt Receipt for transaction: 2015-004515
08/05/2015 Letter Inspection Summary
09/29/2015 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home