Permit Application Status

PRCOM20141214


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20141214
Building Permit - Commercial
Certificate of Occupancy
ABUNDANT LIFE BAPTIST CHURCH OF LS MO
NEW COMMERCIAL
AUDITORIUM AND EDUCATION FACILITIES FOR CHURCH Mike Weisenborn 03/31/2015 11:03 AM - THE OWNER HAS DECIDED TO FINISH THE EDUCATIONAL WING AT THIS TIME. CORRECTIONS TO THE PERMIT HAVE BEEN MADE. Mike Weisenborn 01/12/2015 2:23 PM - THE ACTUAL AREA OF THE BUILDING PERMITTED IS 98,199 SQUARE FEET OF WHICH 69,078 SQUARE FEET IS FINISHED. THIS IS FOR THE AUDITORIUM. THE REMAINING 29,121 SQUARE FEET OF THE EDUCATIONAL WING IS SHELL SPACE AND WILL BE FINISHED AS FUNDING ALLOWS. Mike Weisenborn 05/22/2014 11:19 AM - WATER SERVICE AND BUILDING SEWER INSPECTIONS PERFORMED BY PUBLIC WORKS
05/14/2014
08/28/2014
12/27/2014
12/08/2015
Locations
Contacts
PEARCE CONSTRUCTION COMPANY, Address:417 E 135TH ST, Phone:(816) 941-3000  
METRO AIR CONDITIONING , Address:8151 MCCOY ST, Phone:(913) 888-3991  
ELDECON INC, Address:120 SE 30TH ST, Phone:(660) 553-1121  
BOSS MECHANICAL, Address:P O BOX 998, Phone:(816) 413-0099  
MANTEL TETER ARCHITECTS, Address:929 Walnut St, Suite 564, Phone:(816) 931-5600  
ABUNDANT LIFE BAPTIST CHURCH OF LS MO, Address:414 SW PERSELS  
Reviews
Review Type Outcome Est. Completion Date Completed
Special Inspections Review Approved 10/19/2015
Joe Frogge
Fire Plan Review Approved 04/16/2015
Brian Austerman
Misc
Corrective Action Required
04/16/2015

No further FD comments
Sprinkler Plan Review Released for Construction 04/10/2015
Brian Austerman
Misc
Corrective Action Required
04/10/2015

Resubmittal for the childrens worship area. Released for construction 4-10-15
Alarm Plan Review Released for Construction 02/24/2015
Brian Austerman
Misc
Corrective Action Required
02/24/2015

Add an annunciator panel in the sprinkler room
Installation acceptance testing
Corrective Action Required
02/24/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule alarm testing
Misc
Corrective Action Required
02/24/2015

Provide a smoke detector within 10' of the FACP
Misc
Corrective Action Required
02/24/2015

Add or replace heat detector with a smoke detector in the elevator equipment room
Misc
Corrective Action Required
02/24/2015

Confirm the lack of need for smoke detection in the first floor alternate. Although it is labeled as worship it appears to be of similar use of the second floor alternate which has smoke detection
Misc
Corrective Action Required
02/24/2015

Outside horn strobe shall activate on a waterflow alarm only
Misc
Corrective Action Required
02/24/2015

Silencing the system shall terminate all horns, strobes, and voice messaging
Sprinkler Plan Review Released for Construction 02/12/2015
Brian Austerman
Installation acceptance testing
Corrective Action Required
02/12/2015

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule hydrostatic and flow testing
Building Plan Review Approved with Conditions 07/22/2014 07/28/2014
Joe Frogge
Health Dept Review
Resolved
07/16/2014

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action Required: This comment is for informational purposes. approved via email dated 7/16/14
Health Dept Inspection
Corrective Action Required
07/15/2014

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: This comment is for informational purposes.
Bldg - Occupant load posting 1004.3
Corrective Action Required
07/15/2014

2006 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: This comment is for informational purposes. Postings may be verified during inspections.
Final Development Plan
Resolved
08/26/2014

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: This comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
07/15/2014

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: This comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
07/15/2014

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: This comment is for informational purposes.
Project cost
Corrective Action Required
07/15/2014

The project cost, which is used to establish the permit fee, has not been provided. Action required: This comment is for informational purposes. 6/20/14 - Provided ** If Alternate #2 is to be constructed, and updated valuation must be provided prior to commencement of work.
Misc
Corrective Action Required
07/15/2014

The Developer may not receive a certificate of occupancy for any structure in the Development until a certificate of substantial completion has been given for the improvements. Per the recorded development agreement. Action required: This comment is for information purposes.
Misc
Corrective Action Required
07/15/2014

The City of Lee's Summit's 2014-2019 Capital Improvement Plan provides for certain public improvements at the intersection of SW Jefferson and SW Persels Road that include, without limitation, a traffic signal control and turn lanes ("Jefferson & Persels Project"). The parties agree that the improvements to be constructed as part of the Jefferson and Persels Project are necessary in order for there to be adequate transportation infrastructure sufficient to meet the demand that will be generated by the Development. The Developer understands and agrees that it may not receive a certificate of occupancy for any structure in the Development until a certificate of substantial completion has been given for the Jefferson and Persels Project. Per the recorded development agreement. Action required: This comment is for information purposes.
Health Department Review Approved 07/16/2014
Joe Frogge
Fire Plan Review Approved with Conditions 07/22/2014 07/15/2014
Joe Frogge
Misc
Corrective Action Required
07/15/2014

The city of Lee's Summit is currently under the 2012 IFC, for information only Acknowledged
Misc
Corrective Action Required
07/15/2014

907.2.1.1 System initiation in Group A occupancies with an occupant load of 1,000 or more. Activation of the fire alarm in Group A occupancies with an occupant load of 1,000 or more shall initiate a signal using an emergency voice/alarm communications system in accordance with Section 907.5.2.2. Show on alarm plans Resolved
Misc
Corrective Action Required
07/15/2014

510.1 Emergency responder radio coverage in new buildings. All new buildings shall have approved radio coverage for emergency responders within the building based upon the existing coverage levels of the public safety communication systems of the jurisdiction at the exterior of the building. This section shall not require improvement of the existing public safety communication systems. Exceptions: 1. Where approved by the building official and the fire code official , a wired communication system in accordance with Section 907.2.13.2 shall be permitted to be installed or maintained in lieu of an approved radio coverage system. 2. Where it is determined by the fire code official that the radio coverage system is not needed. 3. In facilities where emergency responder radio coverage is required and such systems, components or equipment required could have a negative impact on the normal operations of that facility, the fire code official shall have the authority to accept an automatically activated emergency responder radio coverage system. Coverage for police and fire department radios shall be accessible. Acknowledged
Knox box required
Corrective Action Required
07/15/2014

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Call (816) 969-1300 to obtain a knox box application
Misc
Corrective Action Required
07/15/2014

Provide detail on coffee bar equipment, particularly on any cooking equipment to deem the necessity of lack thereof for a type 1 hood Information received and approved
Misc
Corrective Action Required
07/15/2014

905.4 Location of Class I standpipe hose connections. Class I standpipe hose connections shall be provided in all of the following locations: 1. In every required stairway, a hose connection shall be provided for each floor level above or below grade. Hose connections shall be located at an intermediate floor level landing between floors, unless otherwise approved by the fire code official. 2. On each side of the wall adjacent to the exit opening of a horizontal exit. Exception: Where floor areas adjacent to a horizontal exit are reachable from exit stairway hose connections by a 30-foot (9144 mm) hose stream from a nozzle attached to 100 feet (30 480 mm) of hose, a hose connection shall not be required at the horizontal exit. 3. In every exit passageway, at the entrance from the exit passageway to other areas of a building. Exception: Where floor areas adjacent to an exit passageway are reachable from exit stairway hose connections by a 30-foot (9144 mm) hose stream from a nozzle attached to 100 feet (30 480 mm) of hose, a hose connection shall not be required at the entrance from the exit passageway to other areas of the building. 4. In covered mall buildings, adjacent to each exterior public entrance to the mall and adjacent to each entrance from an exit passageway or exit corridor to the mall. In open mall buildings, adjacent to each public entrance to the mall at the perimeter line and adjacent to each entrance from an exit passageway or exit corridor to the mall. 5. Where the roof has a slope less than four units vertical in 12 units horizontal (33.3-percent slope), a hose connection shall be located to serve the roof or at the highest landing of a stairway with stair access to the roof provided in accordance with Section 1009.16. 6. Where the most remote portion of a nonsprinklered floor or story is more than 150 feet (45 720 mm) from a hose connection or the most remote portion of a sprinklered floor or story is more than 200 feet (60 960 mm) from a hose connection, the fire code official is authorized to require that additional hose connections be provided in approved locations. Show on sprinkler plans Standpipes shown at platform
Misc
Corrective Action Required
07/15/2014

Misc
Corrective Action Required
07/15/2014

907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building’s fire alarm control unit when a fire alarm system is required by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with this code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. Show on alarm plans
Construction documents - Fire protection systems
Corrective Action Required
07/15/2014

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for aproval. Required are 3 wet sealed sets, this can be a deferred submittal
Construction documents for fire alarm systems
Corrective Action Required
07/15/2014

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval, required are 3 wet sealed sets. This can be a deferred submittal
Licensed Contractors Approved 07/15/2014 07/15/2014
Joe Frogge
Final Development Plan Review Approved 08/07/2014 07/08/2014
Joe Frogge
Licensed Contractors Approved 08/19/2014 06/30/2014
Joe Frogge
Fire Plan Review Approved with Conditions 06/26/2014 06/23/2014
Brian Austerman
Misc
Corrective Action Required
06/19/2014

The city of Lee's Summit is currently under the 2012 IFC, for information only Acknowledged
Misc
Corrective Action Required
06/19/2014

907.2.1.1 System initiation in Group A occupancies with an occupant load of 1,000 or more. Activation of the fire alarm in Group A occupancies with an occupant load of 1,000 or more shall initiate a signal using an emergency voice/alarm communications system in accordance with Section 907.5.2.2. Show on alarm plans Resolved
Misc
Corrective Action Required
06/19/2014

510.1 Emergency responder radio coverage in new buildings. All new buildings shall have approved radio coverage for emergency responders within the building based upon the existing coverage levels of the public safety communication systems of the jurisdiction at the exterior of the building. This section shall not require improvement of the existing public safety communication systems. Exceptions: 1. Where approved by the building official and the fire code official , a wired communication system in accordance with Section 907.2.13.2 shall be permitted to be installed or maintained in lieu of an approved radio coverage system. 2. Where it is determined by the fire code official that the radio coverage system is not needed. 3. In facilities where emergency responder radio coverage is required and such systems, components or equipment required could have a negative impact on the normal operations of that facility, the fire code official shall have the authority to accept an automatically activated emergency responder radio coverage system. Coverage for police and fire department radios shall be accessible. Acknowledged
Knox box required
Corrective Action Required
06/19/2014

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Call (816) 969-1300 to obtain a knox box application
Misc
Corrective Action Required
06/19/2014

Provide detail on coffee bar equipment, particularly on any cooking equipment to deem the necessity of lack thereof for a type 1 hood Information received and approved
Misc
Corrective Action Required
06/19/2014

905.4 Location of Class I standpipe hose connections. Class I standpipe hose connections shall be provided in all of the following locations: 1. In every required stairway, a hose connection shall be provided for each floor level above or below grade. Hose connections shall be located at an intermediate floor level landing between floors, unless otherwise approved by the fire code official. 2. On each side of the wall adjacent to the exit opening of a horizontal exit. Exception: Where floor areas adjacent to a horizontal exit are reachable from exit stairway hose connections by a 30-foot (9144 mm) hose stream from a nozzle attached to 100 feet (30 480 mm) of hose, a hose connection shall not be required at the horizontal exit. 3. In every exit passageway, at the entrance from the exit passageway to other areas of a building. Exception: Where floor areas adjacent to an exit passageway are reachable from exit stairway hose connections by a 30-foot (9144 mm) hose stream from a nozzle attached to 100 feet (30 480 mm) of hose, a hose connection shall not be required at the entrance from the exit passageway to other areas of the building. 4. In covered mall buildings, adjacent to each exterior public entrance to the mall and adjacent to each entrance from an exit passageway or exit corridor to the mall. In open mall buildings, adjacent to each public entrance to the mall at the perimeter line and adjacent to each entrance from an exit passageway or exit corridor to the mall. 5. Where the roof has a slope less than four units vertical in 12 units horizontal (33.3-percent slope), a hose connection shall be located to serve the roof or at the highest landing of a stairway with stair access to the roof provided in accordance with Section 1009.16. 6. Where the most remote portion of a nonsprinklered floor or story is more than 150 feet (45 720 mm) from a hose connection or the most remote portion of a sprinklered floor or story is more than 200 feet (60 960 mm) from a hose connection, the fire code official is authorized to require that additional hose connections be provided in approved locations. Show on sprinkler plans Standpipes shown at platform
Misc
Corrective Action Required
06/19/2014

Misc
Corrective Action Required
06/19/2014

907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building’s fire alarm control unit when a fire alarm system is required by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with this code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. Show on alarm plans
Construction documents - Fire protection systems
Corrective Action Required
06/19/2014

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for aproval. Required are 3 wet sealed sets, this can be a deferred submittal
Construction documents for fire alarm systems
Corrective Action Required
06/19/2014

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval, required are 3 wet sealed sets. This can be a deferred submittal
Building Plan Review Rejected 06/26/2014 06/20/2014
Joe Frogge
Health Dept Review
Corrective Action Required
06/19/2014

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action Required: This comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
06/19/2014

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: This comment is for informational purposes.
Bldg - Occupant load posting 1004.3
Corrective Action Required
06/19/2014

2006 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: This comment is for informational purposes. Postings may be verified during inspections.
Misc
Resolved
06/20/2014

2006 IBC 803.6 - Textiles. Where used as interior wall or ceiling finish materials, textiles, including materials having woven or nonwoven, napped, tufted, looped or similar surface and carpet and similar textile materials, shall comply with the requirements of Section 803.6.1, 803.6.2 or 803.6.3. (see code sections for specific requirements) Action required: Provide information to verify compliance. information provided - it was in the spec
Bldg - Construction classification 602.1
Resolved
07/02/2014

2006 IBC 602.1 – General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. The building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire-resistance rating not less than that specified in Table 602. Action required: Provide information as to how intumescent paint specified will meet 1 hr protection requirement. 6/20/14 - Material specified is not rated for exterior use. Reference car ports. 7/1/14 - new material submitted
Misc
Resolved
07/02/2014

2006 IBC 1025.14.3 Guards at the end of aisles. A fascia or railing system complying with the guard requirements of Section 1013 shall be provided for the full width of the aisle where the foot of the aisle is more than 30 inches above the floor or grade below. The fascia or railing shall be a minimum of 36inches high and shall provide a minimum 42 inches measured diagonally between the top of the rail and the nosing of the nearest tread. Action required: Increase the heights of the end of aisle guards in auditorium seating to at least 36". 6/20/14 - details updated
Misc
Resolved
06/20/2014

2006 IPC 605.4 Water distribution pipe. Water distribution pipe shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.4. Hot water distribution pipe and tubing shall have a pressure rating of not less than 100 psi at 180degF. 2006 IPC 702.1 Above-ground sanitary drainage and vent pipe. Above-ground soil, waste and vent pipe shall conform to one of the standards listed in Table 702.1 2006 IPC 702.2 Underground building sanitary drainage and vent pipe. Underground building sanitary drainage and vent pipe shall conform to one of the standards listed in Table 702.2. 2006 IFGC 403.1 General (natural gas piping). Materials used for piping systems shall comply with the requirements of this chapter or shall be approved. Action required: Provide pipe material schedule. Include any information about pipes routed inside of plenums. 6/20/14 - provided
Misc
Resolved
06/20/2014

2006 IPC 608.1 General. A potable water supply system shall be designed, installed and maintained in such a manner so as to prevent contamination from nonoptable liquids, solids or gases being introduced into the potable water supply through cross-connections or any other piping connections to the system. Backflow preventer applications shall conform to Table 608.1, except as specifically stated in Sections 608.2 through 608.16.10. Action required: specify backflow protection at all appropriate coffee shop devices. 6/20/14 - provided
Final Development Plan
Corrective Action Required
06/19/2014

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: This comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
06/19/2014

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: This comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
06/19/2014

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: This comment is for informational purposes.
Project cost
Corrective Action Required
06/19/2014

The project cost, which is used to establish the permit fee, has not been provided. Action required: This comment is for informational purposes. 6/20/14 - Provided ** If Alternate #2 is to be constructed, and updated valuation must be provided prior to commencement of work.
Misc
Corrective Action Required
06/19/2014

The Developer may not receive a certificate of occupancy for any structure in the Development until a certificate of substantial completion has been given for the improvements. Per the recorded development agreement. Action required: This comment is for information purposes.
Misc
Corrective Action Required
06/19/2014

The City of Lee's Summit's 2014-2019 Capital Improvement Plan provides for certain public improvements at the intersection of SW Jefferson and SW Persels Road that include, without limitation, a traffic signal control and turn lanes ("Jefferson & Persels Project"). The parties agree that the improvements to be constructed as part of the Jefferson and Persels Project are necessary in order for there to be adequate transportation infrastructure sufficient to meet the demand that will be generated by the Development. The Developer understands and agrees that it may not receive a certificate of occupancy for any structure in the Development until a certificate of substantial completion has been given for the Jefferson and Persels Project. Per the recorded development agreement. Action required: This comment is for information purposes.
Building Plan Review Rejected 05/29/2014 05/28/2014
Joe Frogge
Health Dept Review
Corrective Action Required
05/28/2014

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action Required: This comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
05/28/2014

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: This comment is for informational purposes.
Bldg - Occupant load posting 1004.3
Corrective Action Required
05/28/2014

2006 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: This comment is for informational purposes. Postings may be verified during inspections.
Bldg - Common path of egress travel 1014.3
Resolved
06/11/2014

2006 IBC 1025.8 – The common path of egress travel shall not exceed 30feet from any seat to a point where an occupant has a choice of two paths of egress travel to two exits. (see code section for exceptions) Action required: Modify documents to demonstrate compliance at uppermost seating in auditorium.
Misc
Corrective Action Required
05/28/2014

2006 IBC 803.6 - Textiles. Where used as interior wall or ceiling finish materials, textiles, including materials having woven or nonwoven, napped, tufted, looped or similar surface and carpet and similar textile materials, shall comply with the requirements of Section 803.6.1, 803.6.2 or 803.6.3. (see code sections for specific requirements) Action required: Provide information to verify compliance.
Bldg - Construction classification 602.1
Corrective Action Required
05/28/2014

2006 IBC 602.1 – General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. The building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire-resistance rating not less than that specified in Table 602. Action required: Provide information as to how intumescent paint specified will meet 1 hr protection requirement.
Misc
Corrective Action Required
05/28/2014

2006 IBC 1025.14.3 Guards at the end of aisles. A fascia or railing system complying with the guard requirements of Section 1013 shall be provided for the full width of the aisle where the foot of the aisle is more than 30 inches above the floor or grade below. The fascia or railing shall be a minimum of 36inches high and shall provide a minimum 42 inches measured diagonally between the top of the rail and the nosing of the nearest tread. Action required: Increase the heights of the end of aisle guards in auditorium seating to at least 36".
Misc
Corrective Action Required
05/28/2014

2006 IPC 605.4 Water distribution pipe. Water distribution pipe shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.4. Hot water distribution pipe and tubing shall have a pressure rating of not less than 100 psi at 180degF. 2006 IPC 702.1 Above-ground sanitary drainage and vent pipe. Above-ground soil, waste and vent pipe shall conform to one of the standards listed in Table 702.1 2006 IPC 702.2 Underground building sanitary drainage and vent pipe. Underground building sanitary drainage and vent pipe shall conform to one of the standards listed in Table 702.2. 2006 IFGC 403.1 General (natural gas piping). Materials used for piping systems shall comply with the requirements of this chapter or shall be approved. Action required: Provide pipe material schedule. Include any information about pipes routed inside of plenums.
Misc
Corrective Action Required
05/28/2014

2006 IPC 608.1 General. A potable water supply system shall be designed, installed and maintained in such a manner so as to prevent contamination from nonoptable liquids, solids or gases being introduced into the potable water supply through cross-connections or any other piping connections to the system. Backflow preventer applications shall conform to Table 608.1, except as specifically stated in Sections 608.2 through 608.16.10. Action required: specify backflow protection at all appropriate coffee shop devices.
Final Development Plan
Corrective Action Required
05/28/2014

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: This comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
05/28/2014

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: This comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
05/28/2014

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: This comment is for informational purposes.
Project cost
Corrective Action Required
05/28/2014

The project cost, which is used to establish the permit fee, has not been provided. Action required: This comment is for informational purposes.
Misc
Corrective Action Required
06/06/2014

The Developer may not receive a certificate of occupancy for any structure in the Development until a certificate of substantial completion has been given for the improvements. Per the recorded development agreement. Action required: This comment is for information purposes.
Misc
Corrective Action Required
06/06/2014

The City of Lee's Summit's 2014-2019 Capital Improvement Plan provides for certain public improvements at the intersection of SW Jefferson and SW Persels Road that include, without limitation, a traffic signal control and turn lanes ("Jefferson & Persels Project"). The parties agree that the improvements to be constructed as part of the Jefferson and Persels Project are necessary in order for there to be adequate transportation infrastructure sufficient to meet the demand that will be generated by the Development. The Developer understands and agrees that it may not receive a certificate of occupancy for any structure in the Development until a certificate of substantial completion has been given for the Jefferson and Persels Project. Per the recorded development agreement. Action required: This comment is for information purposes.
Licensed Contractors Approved 05/29/2014 05/28/2014
Joe Frogge
Fire Plan Review Approved with Conditions 05/29/2014 05/19/2014
Brian Austerman
Misc
Corrective Action Required
05/19/2014

The city of Lee's Summit is currently under the 2012 IFC, for information only
Misc
Corrective Action Required
05/19/2014

907.2.1.1 System initiation in Group A occupancies with an occupant load of 1,000 or more. Activation of the fire alarm in Group A occupancies with an occupant load of 1,000 or more shall initiate a signal using an emergency voice/alarm communications system in accordance with Section 907.5.2.2. Show on alarm plans
Misc
Corrective Action Required
05/19/2014

510.1 Emergency responder radio coverage in new buildings. All new buildings shall have approved radio coverage for emergency responders within the building based upon the existing coverage levels of the public safety communication systems of the jurisdiction at the exterior of the building. This section shall not require improvement of the existing public safety communication systems. Exceptions: 1. Where approved by the building official and the fire code official , a wired communication system in accordance with Section 907.2.13.2 shall be permitted to be installed or maintained in lieu of an approved radio coverage system. 2. Where it is determined by the fire code official that the radio coverage system is not needed. 3. In facilities where emergency responder radio coverage is required and such systems, components or equipment required could have a negative impact on the normal operations of that facility, the fire code official shall have the authority to accept an automatically activated emergency responder radio coverage system. Coverage for police and fire department radios shall be accessible.
Knox box required
Corrective Action Required
05/19/2014

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Call (816) 969-1300 to obtain a knox box application
Misc
Corrective Action Required
05/19/2014

Provide detail on coffee bar equipment, particularly on any cooking equipment to deem the necessity of lack thereof for a type 1 hood
Misc
Corrective Action Required
05/19/2014

905.4 Location of Class I standpipe hose connections. Class I standpipe hose connections shall be provided in all of the following locations: 1. In every required stairway, a hose connection shall be provided for each floor level above or below grade. Hose connections shall be located at an intermediate floor level landing between floors, unless otherwise approved by the fire code official. 2. On each side of the wall adjacent to the exit opening of a horizontal exit. Exception: Where floor areas adjacent to a horizontal exit are reachable from exit stairway hose connections by a 30-foot (9144 mm) hose stream from a nozzle attached to 100 feet (30 480 mm) of hose, a hose connection shall not be required at the horizontal exit. 3. In every exit passageway, at the entrance from the exit passageway to other areas of a building. Exception: Where floor areas adjacent to an exit passageway are reachable from exit stairway hose connections by a 30-foot (9144 mm) hose stream from a nozzle attached to 100 feet (30 480 mm) of hose, a hose connection shall not be required at the entrance from the exit passageway to other areas of the building. 4. In covered mall buildings, adjacent to each exterior public entrance to the mall and adjacent to each entrance from an exit passageway or exit corridor to the mall. In open mall buildings, adjacent to each public entrance to the mall at the perimeter line and adjacent to each entrance from an exit passageway or exit corridor to the mall. 5. Where the roof has a slope less than four units vertical in 12 units horizontal (33.3-percent slope), a hose connection shall be located to serve the roof or at the highest landing of a stairway with stair access to the roof provided in accordance with Section 1009.16. 6. Where the most remote portion of a nonsprinklered floor or story is more than 150 feet (45 720 mm) from a hose connection or the most remote portion of a sprinklered floor or story is more than 200 feet (60 960 mm) from a hose connection, the fire code official is authorized to require that additional hose connections be provided in approved locations. Show on sprinkler plans
Misc
Corrective Action Required
05/19/2014

Misc
Corrective Action Required
05/19/2014

907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building’s fire alarm control unit when a fire alarm system is required by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with this code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. Show on alarm plans
Construction documents - Fire protection systems
Corrective Action Required
05/19/2014

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for aproval
Construction documents for fire alarm systems
Corrective Action Required
05/19/2014

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide alarm plans for approval
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Commercial $70,152.72 $70,152.72 Paid 08/28/2014
$70,152.72
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 08/28/2014
$3,000.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 9/2/2014 (11:00) 9/8/2014 at 12:00 AM 09/08/2014
Footing Inspection - Commercial Partial 9/10/2014 at 12:00 AM 09/10/2014
Underslab Electrical Inspection - Commercial Partial 9/2/2014 9/10/2014 at 12:00 AM 09/10/2014
Underslab Plumbing Inspection - Commercial Partial 9/10/2014 at 12:00 AM 09/10/2014
Footing Inspection - Commercial Partial 9/16/2014 at 12:00 AM 09/16/2014
Misc
Corrective Action Required
09/16/2014
FOOTINGS COMPLETE- SEE FOUNDATION PERMIT ALL PERIMETER FOOTINGS 90% OUT STANDING- ELEVATOR PIT AND 20FT OF WALL SURROUNDING PIT, A FEW INTERIOR COLUMNS AND PIERS.
Underslab Electrical Inspection - Commercial Partial 9/16/2014 at 12:00 AM 09/16/2014
Misc
Corrective Action Required
09/16/2014
SEE FOUNDATION PERMIT-(CLOSED) DAILY INSPECTIONS ON UNDERSLAB ELECTRICAL . CONTINUING INSPECTIONS- -MAIN LINES TO HV4 PANEL -MAIN PANEL LOCATION MOSTLY COMPLETE -NO FLOOR SLAB BOXES AT THIS POINT WORKING ON EAST SIDE-9-16-14
Underslab Plumbing Inspection - Commercial Partial 9/16/2014 at 12:00 AM 09/16/2014
Misc
Corrective Action Required
09/16/2014
CONTINUING INSECTIONS- -NORTH SECTION MOSTLY COMPLETE -INTERIOR ROOF DRAINS COMPLETE EXCEPT ONE EAST TURN UP -INTERIOR AREA DRAIN COMPLETE AROUND BAPTISM FLOOR. - 3" WATER SERIVCE TO INSIDE BUILDING COMPLETE -2" LAWN SPRINKLER LINE TO EXTERIOR COMPLETE. SOUTH BATH GROUPS ON SOUTH MAIN LINE REMAINING
Footing Inspection - Commercial Partial 9/19/2014 at 12:00 AM 09/19/2014
Misc
Corrective Action Required
09/16/2014
intermediate columns and piers.
Underslab Electrical Inspection - Commercial Partial 9/19/2014 at 12:00 AM 09/19/2014
Misc
Corrective Action Required
09/16/2014
SEE FOUNDATION PERMIT-(CLOSED) DAILY INSPECTIONS ON UNDERSLAB ELECTRICAL . CONTINUING INSPECTIONS- -MAIN LINES TO HV4 PANEL -MAIN PANEL LOCATION MOSTLY COMPLETE -NO FLOOR SLAB BOXES AT THIS POINT WORKING ON EAST SIDE-9-16-14 -WEST CENTER AREA
Underslab Plumbing Inspection - Commercial Partial 9/19/2014 at 12:00 AM 09/19/2014
Misc
Corrective Action Required
09/16/2014
CONTINUING INSECTIONS- -NORTH SECTION MOSTLY COMPLETE -INTERIOR ROOF DRAINS COMPLETE EXCEPT ONE EAST TURN UP -INTERIOR AREA DRAIN COMPLETE AROUND BAPTISM FLOOR. - 3" WATER SERIVCE TO INSIDE BUILDING COMPLETE -2" LAWN SPRINKLER LINE TO EXTERIOR COMPLETE. - ROOF DRAINS COMPLETE - SINK MAIN RESTROOM AREA ROW OF SINK LINE TO REST ROOMS SOUTH BATH GROUPS ON SOUTH MAIN LINE REMAINING
Footing Inspection - Commercial Failed 9/22/2014 at 12:00 AM 09/22/2014
Misc
Corrective Action Required
09/19/2014
FOOTINGS AT C.9/ 21 & C.9/ 22: ACI 7.7.1 MINIMUM RE-BAR COVERAGE: 3" TO BOTTOMS/BANKS
Underslab Plumbing Inspection - Commercial Not Ready 9/22/2014 at 12:00 AM 09/22/2014
Misc
Partial Correction
09/22/2014
CONTINUING INSECTIONS- -NORTH SECTION MOSTLY COMPLETE -INTERIOR ROOF DRAINS COMPLETE EXCEPT ONE EAST TURN UP -INTERIOR AREA DRAIN COMPLETE AROUND BAPTISM FLOOR. - 3" WATER SERIVCE TO INSIDE BUILDING COMPLETE -2" LAWN SPRINKLER LINE TO EXTERIOR COMPLETE. - ROOF DRAINS COMPLETE - SINK MAIN RESTROOM AREA ROW OF SINK LINE TO REST ROOMS SOUTH BATH GROUPS ON SOUTH MAIN LINE REMAINING
Underslab Electrical Inspection - Commercial Partial 9/22/2014 at 12:00 AM 09/22/2014
Misc
Partial Correction
09/22/2014
SEE FOUNDATION PERMIT-(CLOSED) DAILY INSPECTIONS ON UNDERSLAB ELECTRICAL . CONTINUING INSPECTIONS- -MAIN LINES TO HV4 PANEL -MAIN PANEL LOCATION MOSTLY COMPLETE -NO FLOOR SLAB BOXES AT THIS POINT WORKING ON EAST SIDE-9-16-14 -WEST CENTER AREA - COFFEE BAR
Footing Inspection - Commercial Partial 9/22/2014 at 12:00 AM 09/22/2014
Misc
Partial Correction
09/22/2014
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C.9/ 21 & C.9/ 22;
Underslab Plumbing Inspection - Commercial Partial 9/23/2014 9/23/2014 at 12:00 AM 09/23/2014
Misc
Partial Correction
09/22/2014
CONTINUING INSECTIONS- -NORTH SECTION MOSTLY COMPLETE -INTERIOR ROOF DRAINS COMPLETE EXCEPT ONE EAST TURN UP -INTERIOR AREA DRAIN COMPLETE AROUND BAPTISM FLOOR. - 3" WATER SERIVCE TO INSIDE BUILDING COMPLETE -2" LAWN SPRINKLER LINE TO EXTERIOR COMPLETE. - ROOF DRAINS COMPLETE - SINK MAIN RESTROOM AREA ROW OF SINK LINE TO REST ROOMS - RESTROOMS (1008) & (1009)
Underslab Electrical Inspection - Commercial Partial 9/23/2014 9/23/2014 at 12:00 AM 09/23/2014
Misc
Partial Correction
09/22/2014
SEE FOUNDATION PERMIT-(CLOSED) DAILY INSPECTIONS ON UNDERSLAB ELECTRICAL . CONTINUING INSPECTIONS- -MAIN LINES TO HV4 PANEL -MAIN PANEL LOCATION MOSTLY COMPLETE -NO FLOOR SLAB BOXES AT THIS POINT WORKING ON EAST SIDE-9-16-14 -WEST CENTER AREA - COFFEE BAR - 21 1-1/4", 1" & 3/4" CONDUITS DEEP-TRENCHED FROM ELECT RM (1048) TO 12' N OF PANEL LV7
Underslab Plumbing Inspection - Commercial Partial 9/24/2014 at 12:00 AM 09/24/2014
Misc
Partial Correction
09/23/2014
CONTINUING INSECTIONS- -NORTH SECTION MOSTLY COMPLETE -INTERIOR ROOF DRAINS COMPLETE EXCEPT ONE EAST TURN UP -INTERIOR AREA DRAIN COMPLETE AROUND BAPTISM FLOOR. - 3" WATER SERIVCE TO INSIDE BUILDING COMPLETE -2" LAWN SPRINKLER LINE TO EXTERIOR COMPLETE. - ROOF DRAINS COMPLETE - SINK MAIN RESTROOM AREA ROW OF SINK LINE TO REST ROOMS - RESTROOMS (1008) & (1009) - RESTROOMS (1010) & (1011)
Footing Inspection - Commercial Partial 9/25/2014 at 12:00 AM 09/25/2014
Misc
Partial Correction
09/22/2014
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C.9/ 21 & C.9/ 22; STADIUM SEATING REAR ARC TYPE NF7A FROM EAST #2, 3, 4, 5, 6, 7;
Footing Inspection - Commercial Partial 9/25/2014 at 12:00 AM 09/25/2014
Misc
Partial Correction
09/25/2014
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C.9/ 21 & C.9/ 22; STADIUM SEATING REAR ARC TYPE NF7A ISOLATED FOOTINGS FROM EAST #2, 3, 4, 5, 6, 7;
Footing Inspection - Commercial Partial 9/26/2014 (9:00) 9/26/2014 at 12:00 AM 09/26/2014
Misc
Corrective Action Required
09/26/2014
pad f.4-32 and h-32 approved
Footing Inspection - Commercial Partial 9/30/2014 (1:00) 9/30/2014 at 12:00 AM 09/30/2014
Misc
Partial Correction
09/30/2014
pad f.4-32 and h-32 approved OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: Q.5/3.1; R/16.5; F.2/16.5;
Concrete Walls and Columns Inspection Partial 9/30/2014 at 12:00 AM 09/30/2014
Misc
Partial Correction
09/30/2014
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: B/22;
Underslab Electrical Inspection - Commercial Partial 10/7/2014 at 12:00 AM 10/07/2014
Misc
Partial Correction
09/23/2014
SEE FOUNDATION PERMIT-(CLOSED) DAILY INSPECTIONS ON UNDERSLAB ELECTRICAL . CONTINUING INSPECTIONS- -MAIN LINES TO HV4 PANEL -MAIN PANEL LOCATION MOSTLY COMPLETE -NO FLOOR SLAB BOXES AT THIS POINT WORKING ON EAST SIDE-9-16-14 -WEST CENTER AREA - COFFEE BAR - 21 1-1/4", 1" & 3/4" CONDUITS DEEP-TRENCHED FROM ELECT RM (1048) TO 12' N OF PANEL LV7
Underslab Plumbing Inspection - Commercial Partial 10/17/2014 10/17/2014 at 12:00 AM 10/17/2014
Misc
Partial Correction
09/24/2014
CONTINUING INSECTIONS- -NORTH SECTION MOSTLY COMPLETE -INTERIOR ROOF DRAINS COMPLETE EXCEPT ONE EAST TURN UP -INTERIOR AREA DRAIN COMPLETE AROUND BAPTISM FLOOR. - 3" WATER SERIVCE TO INSIDE BUILDING COMPLETE -2" LAWN SPRINKLER LINE TO EXTERIOR COMPLETE. - ROOF DRAINS COMPLETE - SINK MAIN RESTROOM AREA ROW OF SINK LINE - REST ROOMS(1087) (1099) (1100) - RESTROOMS (1008) & (1009) - RESTROOMS (1010) & (1011)
Underslab Electrical Inspection - Commercial Partial 10/31/2014 at 12:00 AM 10/31/2014
Misc
Partial Correction
10/07/2014
SEE FOUNDATION PERMIT-(CLOSED) DAILY INSPECTIONS ON UNDERSLAB ELECTRICAL . CONTINUING INSPECTIONS- -MAIN LINES TO HV4 PANEL -MAIN PANEL LOCATION MOSTLY COMPLETE -NO FLOOR SLAB BOXES AT THIS POINT WORKING ON EAST SIDE-9-16-14 -WEST CENTER AREA - COFFEE BAR - 21 1-1/4", 1" & 3/4" CONDUITS DEEP-TRENCHED FROM ELECT RM (1048) TO 12' N OF PANEL LV7
Concrete Walls and Columns Inspection Partial 11/5/2014 (11:00) 11/5/2014 at 12:00 AM 11/05/2014
Piers/Caissons Inspection - Commercial Partial 11/26/2014 at 12:00 AM 11/26/2014
Rough Framing Inspection - Commercial Partial 12/12/2014 12/12/2014 at 12:00 AM 12/15/2014
Concrete Walls and Columns Inspection Passed 12/19/2014 (8:00) 12/19/2014 at 12:00 AM 12/19/2014
Rough Framing Inspection - Commercial Partial 12/30/2014 12/30/2014 at 12:00 AM 12/30/2014
Misc
Corrective Action Required
12/30/2014
EXTERIOR WALL - GYP BOARD AND FRAMING CLIPS NORTH WALL SECTIONS-1ST,2ND , 3RD LEVELS EASTNORTH SECTION-
Rough Framing Inspection - Commercial Partial 1/23/2015 at 12:00 AM 01/23/2015
Misc
Corrective Action Required
12/30/2014
EXTERIOR WALL - GYP BOARD AND FRAMING CLIPS NORTH WALL SECTIONS-1ST,2ND , 3RD LEVELS EASTNORTH SECTION- --1st floor East wall-c-1-21, 1- c-j, n-s, s North wall auditorium - 21-around to 26 on east wall. 2nd level back stage - back platform 1045.
Rough Framing Inspection - Commercial Partial 2/9/2015 2/10/2015 at 12:00 AM 02/10/2015
Misc
Corrective Action Required
01/23/2015
EXTERIOR WALL - GYP BOARD AND FRAMING CLIPS NORTH WALL SECTIONS-1ST,2ND , 3RD LEVELS EASTNORTH SECTION- --1st floor East wall-c-1-21, 1- c-j, n-s, s North wall auditorium - 21-around to 26 on east wall. 2nd level back stage - back platform 1045. wall sections - south face GG east line 37 to north face BB north wall-V line to BB Pending stair wall portion .
Rough Framing Inspection - Commercial Partial 3/16/2015 3/16/2015 at 12:00 AM 03/16/2015
Misc
Corrective Action Required
02/10/2015
EXTERIOR WALL - GYP BOARD AND FRAMING CLIPS NORTH WALL SECTIONS-1ST,2ND , 3RD LEVELS EASTNORTH SECTION- --1st floor East wall-c-1-21, 1- c-j, n-s, s North wall auditorium - 21-around to 26 on east wall. 2nd level back stage - back platform 1045. wall sections - south face GG east line 37 to north face BB north wall-V line to BB Pending stair wall portion .
FIRST FLOOR
Corrective Action Required
03/16/2015
ROOM 1048- OK TO ROCK FOR ELECTRICAL PANEL INSTALLATION
Footing Inspection - Commercial Partial 4/6/2015 (8:00) 4/6/2015 at 12:00 AM 04/06/2015
Misc
Partial Correction
04/06/2015
AUDITORIUM AREA, THE FOOTING FOR 2 FOOOT WALL AT FRONT OF PLATFORM BETWEEN 14 AND 18 LINES APPROVED TO POUR
Concrete Walls and Columns Inspection Passed 4/9/2015 (1:00) 4/9/2015 at 12:00 AM 04/09/2015
Electrical Service Inspection Partial 4/17/2015 4/17/2015 at 12:00 AM 04/17/2015
ELECTRICAL
Corrective Action Required
04/17/2015
PANEL- MDP ONLY OK TO RELEASE UFER GROUND UNDER PANEL /STEEL ABOVE AND TO THE WEST OF ELECTRICAL ROOM. PANELS- 1 2 3 4
Rough Electrical Inspection - Commercial Not Ready 4/28/2015 5/5/2015 at 12:00 AM 05/05/2015
Rated Assembly Inspection Partial 5/6/2015 5/6/2015 at 12:00 AM 05/06/2015
B705 FIRE WALLS
Corrective Action Required
05/06/2015
Rated columns- 1ST LAYER K.4,L6,N3, 2ND LAYER K4,L6,N3
Rated Assembly Inspection Partial 5/13/2015 at 12:00 AM 05/13/2015
B705 FIRE WALLS
Corrective Action Required
05/06/2015
Rated columns- 1ST LAYER K.4,L6,N3, 2ND LAYER K4,L6,N3
In-wall Inspection Partial 5/13/2015 5/13/2015 at 12:00 AM 05/13/2015
FIRST FLOOR
Corrective Action Required
05/13/2015
WEST SIDE OF AUDITORIUM- FOLLOWING APPROVED TO COVER- 1HR CEILING OK TO COVER ROOMS :1024,225,26,27,28 CORRIDOR ,34,36,
Rated Assembly Inspection Partial 5/21/2015 5/21/2015 at 12:00 AM 05/21/2015
B705 FIRE WALLS
Corrective Action Required
05/13/2015
Rated columns- 1ST LAYER C-1,3,4,8,14,18 K.4,2,5;I-4,2,5,7 H7,13;F.8-8; E-1,14,8-;18,21,23,26 L6,5; N3;P-13,7 Q-14; S-1,6,11,14,3118,21,23,26 U-11,16,21,26 2ND LAYER K4,L6,N3
All Rough Inspection - Commercial Partial 5/27/2015 at 12:00 AM 05/27/2015
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/27/2015
WALL ALL-ROUGH- 1053,1054,1055,1056,1057,1058,1059 PHASE ONE - 1ST FLOOR ONE SIDE ONLY APPROVED
Rated Assembly Inspection Partial 5/27/2015 at 12:00 AM 05/27/2015
Misc
Corrective Action Required
05/27/2015
Rated columns- 1ST LAYER C-1,3,4,8,14,18 K.4,2,5;I-4,2,5,7 H7,13;F.8-8; E-1,14,8-;18,21,23,26 L6,5; N3;P-13,7 Q-14; S-1,6,11,14,3118,21,23,26 U-11,16,21,26 2ND LAYER K4,L6,N3
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/27/2015
RATED CEILING- 1024-1026; 1028-1032;1034-1036;1049,1050,1045;1054-1059;
Corrective Action Required
05/27/2015
Underground Electrical Inspection - Commercial Partial 10/7/2014 6/3/2015 at 12:00 AM 06/03/2015
Misc
Corrective Action Required
06/03/2015
Partial- sloped portion of Auditorium
Rough Plumbing Inspection - Commercial Failed 6/9/2015 6/10/2015 at 12:00 AM 06/10/2015
Misc
Corrective Action Required
06/10/2015
6-9 FAILED FOR PLUMBING PROTECTION PLATES 6-10 FAILED FOR PLUMBING PROTECITON PLATES, 2ND FLOOR ROCKED WALL WITH PLUMBING , REMOVED ROCK TO INSTALL PLUMBING PROTECTION PLATES. RECALL WHEN READY NO INSPECTION WEST OF 2ND PHASE.
In-wall Inspection Partial 6/12/2015 6/12/2015 at 12:00 AM 06/12/2015
FIRST FLOOR
Corrective Action Required
05/13/2015
WEST SIDE OF AUDITORIUM- FOLLOWING APPROVED TO COVER- 1HR CEILING OK TO COVER ROOMS :1024,225,26,27,28 CORRIDOR ,34,36, PHASE 2, 1ST AND 2ND FLOOR-OK TO ROCK PLUMBING CORRECTIONS COMPLETE
Miscellaneous Inspection Partial 6/18/2015 at 12:00 AM 06/18/2015
Misc
Corrective Action Required
06/18/2015
SOUTH WEST WALL FRAMING - SOUTH WALL COLUMN AUDITORIUM WRAP -CAT WALK INSPECTION, HVAC, ELECTRICAL
Rated Assembly Inspection Partial 6/18/2015 6/18/2015 at 12:00 AM 06/24/2015
Misc
Corrective Action Required
05/27/2015
Rated columns- 1ST LAYER C-1,3,4,8,14,18 K.4,2,5;I-4,2,5,7 H7,13;F.8-8; E-1,14,8-;18,21,23,26 L6,5; N3;P-13,7 Q-14; S-1,6,11,14,3118,21,23,26 U-11,16,21,26 2ND LAYER K4,L6,N3
Rated Assembly Inspection Partial 6/24/2015 at 12:00 AM 06/24/2015
Misc
Corrective Action Required
06/24/2015
Rated columns- 1ST LAYER C-1,3,4,8,14,18 K.4,2,5;I-4,2,5,7 H7,13;F.8-8; E-1,14,8-;18,21,23,26 L6,5; N3;P-13,7 Q-14; S-1,6,11,14,3118,21,23,26 U-11,16,21,26 2ND LAYER K4,L6,N3 2ND OF 2 6/24/15 Q.9-16,18,21,23,26. Q-31,0,31,N38,L38,K36,J33,G32,F.1-26,32,21,18,17
In-wall Inspection Partial 7/21/2015 at 12:00 AM 07/21/2015
FIRST FLOOR
Corrective Action Required
06/12/2015
WEST SIDE OF AUDITORIUM- FOLLOWING APPROVED TO COVER- 1HR CEILING OK TO COVER ROOMS :1024,225,26,27,28 CORRIDOR ,34,36, PHASE 2, 1ST AND 2ND FLOOR-OK TO ROCK PLUMBING CORRECTIONS COMPLETE IN-WALL OK: 1062->1064; 1006; 1012; 1021->1023
In-wall Inspection Partial 7/29/2015 7/29/2015 at 12:00 AM 07/29/2015
Misc
Corrective Action Required
07/29/2015
WEST SIDE OF AUDITORIUM- FOLLOWING APPROVED TO COVER- 1HR CEILING OK TO COVER ROOMS :1024,225,26,27,28 CORRIDOR ,34,36, PHASE 2, 1ST AND 2ND FLOOR-OK TO ROCK PLUMBING CORRECTIONS COMPLETE IN-WALL OK: 1062->1064; 1006; 1012; 1021->1023 ; ROOMS UNDER SEATING SOUTH SIDE. UPPER WALL AUDITORIUM SOUTH WALL
Above Ceiling Inspection Partial 8/18/2015 8/18/2015 at 12:00 AM 08/18/2015
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/18/2015
HARD LIDS AT ENTRANCES ROOMS 1027 & 1060
In-wall Inspection Partial 8/25/2015 8/25/2015 at 12:00 AM 08/25/2015
Misc
Corrective Action Required
07/29/2015
WEST SIDE OF AUDITORIUM- FOLLOWING APPROVED TO COVER- 1HR CEILING OK TO COVER ROOMS :1024,225,26,27,28 CORRIDOR ,34,36, PHASE 2, 1ST AND 2ND FLOOR-OK TO ROCK PLUMBING CORRECTIONS COMPLETE IN-WALL OK: 1062->1064; 1006; 1012; 1021->1023 ; ROOMS UNDER SEATING SOUTH SIDE. UPPER WALL AUDITORIUM SOUTH WALL 1017,1002, community space 1018, platform 1097,SOUND BOOTH 1096
In-wall Inspection Partial 9/1/2015 9/1/2015 at 12:00 AM 09/01/2015
Misc
Corrective Action Required
08/25/2015
WEST SIDE OF AUDITORIUM- FOLLOWING APPROVED TO COVER- 1HR CEILING OK TO COVER ROOMS :1024,225,26,27,28 CORRIDOR ,34,36, PHASE 2, 1ST AND 2ND FLOOR-OK TO ROCK PLUMBING CORRECTIONS COMPLETE IN-WALL OK: 1062->1064; 1006; 1012; 1021->1023 ; ROOMS UNDER SEATING SOUTH SIDE. UPPER WALL AUDITORIUM SOUTH WALL 1017,1002, community space 1018, platform 1097,SOUND BOOTH 1096, -CAFE CEILING, PLAY AREA WALLS
All Rough Inspection - Commercial Partial 9/3/2015 9/3/2015 at 12:00 AM 09/03/2015
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/27/2015
WALL ALL-ROUGH- 1053,1054,1055,1056,1057,1058,1059 PHASE ONE - 1ST FLOOR ONE SIDE ONLY APPROVEDFRONT WALLS CAFE ETC.
Above Ceiling Inspection Partial 9/3/2015 at 12:00 AM 09/03/2015
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/18/2015
HARD LIDS AT ENTRANCES ROOMS 1027 & 1060 DROP CEILING- PARTIAL OK TO INSTALL BORDERS ONLY. 1111/1113,1104,5,6;1056,8,9; CLASS ROOMS 1ST,2ND FLOORS LEAVE ACCES TO SEE PLUMBING AT ABOVE CEILING 1036A,1034A 3 SOUND AUDIO ROOMS
In-wall Inspection Partial 9/9/2015 9/9/2015 at 12:00 AM 09/09/2015
Misc
Corrective Action Required
09/01/2015
WEST SIDE OF AUDITORIUM- FOLLOWING APPROVED TO COVER- 1HR CEILING OK TO COVER ROOMS :1024,225,26,27,28 CORRIDOR ,34,36, PHASE 2, 1ST AND 2ND FLOOR-OK TO ROCK PLUMBING CORRECTIONS COMPLETE IN-WALL OK: 1062->1064; 1006; 1012; 1021->1023 ; ROOMS UNDER SEATING SOUTH SIDE. UPPER WALL AUDITORIUM SOUTH WALL 1017,1002, community space 1018, platform 1097,SOUND BOOTH 1096, -CAFE CEILING,CAFE WALL, PLAY AREA WALLS, SOUD BOOTH WALL, PARTAIL HARD LID ENTERY TO AUDITORIUM.
Above Ceiling Inspection Partial 9/15/2015 9/15/2015 at 12:00 AM 09/15/2015
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
09/03/2015
HARD LIDS AT ENTRANCES ROOMS 1027 & 1060 DROP CEILING- PARTIAL OK TO INSTALL BORDERS ONLY. 1111/1113,1104,5,6;1056,8,9; CLASS ROOMS 1ST,2ND FLOORS LEAVE ACCES TO SEE PLUMBING AT ABOVE CEILING 1036A,1034A 3 SOUND AUDIO ROOMS partial pre border inspection
In-wall Inspection Passed 9/15/2015 9/15/2015 at 12:00 AM 09/15/2015
Misc
Resolved
09/15/2015
WEST SIDE OF AUDITORIUM- FOLLOWING APPROVED TO COVER- 1HR CEILING OK TO COVER ROOMS :1024,225,26,27,28 CORRIDOR ,34,36, PHASE 2, 1ST AND 2ND FLOOR-OK TO ROCK PLUMBING CORRECTIONS COMPLETE IN-WALL OK: 1062->1064; 1006; 1012; 1021->1023 ; ROOMS UNDER SEATING SOUTH SIDE. UPPER WALL AUDITORIUM SOUTH WALL 1017,1002, community space 1018, platform 1097,SOUND BOOTH 1096, -CAFE CEILING,CAFE WALL, PLAY AREA WALLS, SOUD BOOTH WALL, PARTAIL HARD LID ENTERY TO AUDITORIUM.
Rough Mechanical Inspection - Commercial Passed 09/15/2015
Rough Plumbing Inspection - Commercial Passed 09/15/2015
Misc
Resolved
09/15/2015
6-9 FAILED FOR PLUMBING PROTECTION PLATES 6-10 FAILED FOR PLUMBING PROTECITON PLATES, 2ND FLOOR ROCKED WALL WITH PLUMBING , REMOVED ROCK TO INSTALL PLUMBING PROTECTION PLATES. RECALL WHEN READY NO INSPECTION WEST OF 2ND PHASE.
Underground Electrical Inspection - Commercial Passed 09/15/2015
Misc
Resolved
09/15/2015
Partial- sloped portion of Auditorium
Rough Electrical Inspection - Commercial Passed 7/21/2015 09/15/2015
Above Ceiling Inspection Partial 9/28/2015 9/28/2015 at 12:00 AM 09/28/2015
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
09/15/2015
HARD LIDS AT ENTRANCES ROOMS 1027 & 1060 DROP CEILING- PARTIAL OK TO INSTALL BORDERS ONLY. 1111/1113,1104,5,6;1056,8,9; CLASS ROOMS 1ST,2ND FLOORS LEAVE ACCES TO SEE PLUMBING AT ABOVE CEILING 1036A,1034A 3 SOUND AUDIO ROOMS partial pre border inspection 2ND FLOOR EAST SIDE OK
Above Ceiling Inspection Partial 9/30/2015 9/30/2015 at 12:00 AM 09/30/2015
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
09/28/2015
HARD LIDS AT ENTRANCES ROOMS 1027 & 1060 DROP CEILING- PARTIAL OK TO INSTALL BORDERS ONLY. 1111/1113,1104,5,6;1056,8,9; CLASS ROOMS 1ST,2ND FLOORS LEAVE ACCES TO SEE PLUMBING AT ABOVE CEILING 1036A,1034A 3 SOUND AUDIO ROOMS partial pre border inspection 2ND FLOOR EAST SIDE OK 1st class rooms east side
Above Ceiling Inspection Partial 10/2/2015 10/2/2015 at 12:00 AM 10/02/2015
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
09/30/2015
HARD LIDS AT ENTRANCES ROOMS 1027 & 1060 DROP CEILING- PARTIAL OK TO INSTALL BORDERS ONLY. 1111/1113,1104,5,6;1056,8,9; CLASS ROOMS 1ST,2ND FLOORS LEAVE ACCES TO SEE PLUMBING AT ABOVE CEILING 1036A,1034A 3 SOUND AUDIO ROOMS partial pre border inspection 2ND FLOOR EAST SIDE OK 1st class rooms east side CORRIDOR [1067] FROM (EE.3) TO (TT); [1099] THRU [1114]; 1st floor - corridor east end north rooms
Above Ceiling Inspection Partial 10/8/2015 10/8/2015 at 12:00 AM 10/08/2015
Misc
Corrective Action Required
10/08/2015
ONLY. 1111/1113,1104,5,6;1056,8,9; CLASS ROOMS 1ST,2ND FLOORS LEAVE ACCES TO SEE PLUMBING AT ABOVE CEILING 1036A,1034A 3 SOUND AUDIO ROOMS partial pre border inspection 2ND FLOOR EAST SIDE OK 1st class rooms east side CORRIDOR [1067] FROM (EE.3) TO (TT); [1099] THRU [1114]; 1st floor - corridor east end north rooms
Above Ceiling Inspection Partial 10/12/2015 10/12/2015 at 12:00 AM 10/12/2015
Misc
Corrective Action Required
10/08/2015
ONLY. 1111/1113,1104,5,6;1056,8,9; CLASS ROOMS 1ST,2ND FLOORS LEAVE ACCES TO SEE PLUMBING AT ABOVE CEILING 1036A,1034A 3 SOUND AUDIO ROOMS partial pre border inspection 2ND FLOOR EAST SIDE OK 1st class rooms east side CORRIDOR [1067] FROM (EE.3) TO (TT); [1099] THRU [1114]; 1st floor - corridor east end north rooms
Misc
Corrective Action Required
10/12/2015
west side- 1055,1054
Gas Piping Inspection - Commercial Failed 10/13/2015 10/13/2015 at 12:00 AM 10/13/2015
Misc
Corrective Action Required
10/13/2015
pending revised plans
Above Ceiling Inspection Partial 10/15/2015 10/15/2015 at 12:00 AM 10/15/2015
Misc
Corrective Action Required
10/12/2015
ONLY. 1111/1113,1104,5,6;1056,8,9; CLASS ROOMS 1ST,2ND FLOORS LEAVE ACCES TO SEE PLUMBING AT ABOVE CEILING 1036A,1034A 3 SOUND AUDIO ROOMS partial pre border inspection 2ND FLOOR EAST SIDE OK 1st class rooms east side CORRIDOR [1067] FROM (EE.3) TO (TT); [1099] THRU [1114]; 1st floor - corridor east end north rooms
Misc
Corrective Action Required
10/12/2015
west side- 1056,1057,1058,1059,1055,1054,1050,1061
Sprinkler - Hydrostatic Test Passed 10/15/2015 at 10:00 AM 10/15/2015
Gas Piping Inspection - Commercial Passed 10/19/2015
Misc
Resolved
10/19/2015
pending revised plans
Gas Service Inspection - Commercial Passed 10/20/2015 10/19/2015 at 12:00 AM 10/19/2015
Above Ceiling Inspection Passed 10/21/2015 10/22/2015 at 12:00 AM 10/22/2015
Misc
Resolved
10/22/2015
ONLY. 1111/1113,1104,5,6;1056,8,9; CLASS ROOMS 1ST,2ND FLOORS LEAVE ACCES TO SEE PLUMBING AT ABOVE CEILING 1036A,1034A 3 SOUND AUDIO ROOMS partial pre border inspection 2ND FLOOR EAST SIDE OK 1st class rooms east side CORRIDOR [1067] FROM (EE.3) TO (TT); [1099] THRU [1114]; 1st floor - corridor east end north rooms
Misc
Resolved
10/22/2015
west side- 1056,1057,1058,1059,1055,1054,1050,1061
Miscellaneous Inspection Partial 10/22/2015 at 12:00 AM 10/22/2015
Misc
Corrective Action Required
10/22/2015
pre final walk
Alarm Test Passed 10/28/2015 at 12:00 AM 10/28/2015
Sprinkler - Flow Test Passed 10/28/2015 at 12:00 AM 10/28/2015
Occupancy Inspection - Fire Temporary C of O 10/28/2015 at 12:00 AM 10/28/2015
Occupancy Inspection - Planning Temporary C of O 11/12/2015 at 12:00 AM 10/28/2015
Corrective Action Required
10/28/2015
Installation of ADA signage at the head of every accessible stall shall be completed. (Work was being performed during inspection.)
Corrective Action Required
10/28/2015
Landscaping shall be completed per the approved landscape plan.
Corrective Action Required
10/28/2015
Installation of the exterior metal panels shall be completed per the approved building elevations.
Occupancy Inspection - Codes Commercial Failed 10/28/2015 10/28/2015 at 12:00 AM 10/28/2015
Misc
Corrective Action Required
10/28/2015
PARTIAL FINAL INSPECTION- PROVIDE APPROVAL FROM ALL DEPARTMENTS PRIOR TO OCCUPYING. CODES PLANNING WATER PUBLIC WORKS FIRE DEPT.
Misc
Corrective Action Required
10/28/2015
ok to stock and train on AV systems. NOT TO BE OPEN FOR SERIVCES OR TO THE PUBLIC.
Occupancy Inspection - Codes Commercial Failed 11/11/2015 at 12:00 AM 11/11/2015
Misc
Corrective Action Required
10/28/2015
PARTIAL FINAL INSPECTION- PROVIDE APPROVAL FROM ALL DEPARTMENTS PRIOR TO OCCUPYING. CODES PLANNING WATER PUBLIC WORKS FIRE DEPT.
Misc
Corrective Action Required
10/28/2015
ok to stock and train on AV systems. NOT TO BE OPEN FOR SERIVCES OR TO THE PUBLIC.
Misc
Corrective Action Required
11/11/2015
-turn down water heater blow off drain in north mop sink -gfci at east and west of main front doors are not hot. (south entry) -roof drains south front entry incomplete -place electrical plaque on wall at electrical room. -complete labels of all electrical panels -provide state elevator inspection -install handrail south main stairs to 2nd floor - bath fan not working 2005A - complete vanities at 2nd floor children’s bathroom. - cap drain I room 1105 for ice machine -provide backflow on ice machine in coffee area Pending TCO or C of O approval from other departments. Planning Fire Water Public Works Codes
Underground Plumbing Inspection - Commercial Passed 9/24/2014 11/11/2015
Underslab Plumbing Inspection - Commercial Passed 6/3/2015 11/11/2015
Misc
Resolved
11/11/2015
CONTINUING INSECTIONS- -NORTH SECTION MOSTLY COMPLETE -INTERIOR ROOF DRAINS COMPLETE EXCEPT ONE EAST TURN UP -INTERIOR AREA DRAIN COMPLETE AROUND BAPTISM FLOOR. - 3" WATER SERIVCE TO INSIDE BUILDING COMPLETE -2" LAWN SPRINKLER LINE TO EXTERIOR COMPLETE. - ROOF DRAINS COMPLETE - SINK MAIN RESTROOM AREA ROW OF SINK LINE - REST ROOMS(1087) (1099) (1100) - RESTROOMS (1008) & (1009) - RESTROOMS (1010) & (1011)
Underslab Electrical Inspection - Commercial Passed 11/11/2015
Misc
Resolved
11/11/2015
SEE FOUNDATION PERMIT-(CLOSED) DAILY INSPECTIONS ON UNDERSLAB ELECTRICAL . CONTINUING INSPECTIONS- -MAIN LINES TO HV4 PANEL -MAIN PANEL LOCATION MOSTLY COMPLETE -NO FLOOR SLAB BOXES AT THIS POINT WORKING ON EAST SIDE-9-16-14 -WEST CENTER AREA - COFFEE BAR - 21 1-1/4", 1" & 3/4" CONDUITS DEEP-TRENCHED FROM ELECT RM (1048) TO 12' N OF PANEL LV7
Piers/Caissons Inspection - Commercial Passed 11/11/2015
Rough Framing Inspection - Commercial Passed 7/21/2015 11/11/2015
Misc
Resolved
11/11/2015
EXTERIOR WALL - GYP BOARD AND FRAMING CLIPS NORTH WALL SECTIONS-1ST,2ND , 3RD LEVELS EASTNORTH SECTION- --1st floor East wall-c-1-21, 1- c-j, n-s, s North wall auditorium - 21-around to 26 on east wall. 2nd level back stage - back platform 1045. wall sections - south face GG east line 37 to north face BB north wall-V line to BB Pending stair wall portion .
FIRST FLOOR
Resolved
11/11/2015
ROOM 1048- OK TO ROCK FOR ELECTRICAL PANEL INSTALLATION
Footing Inspection - Commercial Passed 11/11/2015
Misc
Resolved
11/11/2015
AUDITORIUM AREA, THE FOOTING FOR 2 FOOOT WALL AT FRONT OF PLATFORM BETWEEN 14 AND 18 LINES APPROVED TO POUR
Electrical Service Inspection Passed 11/11/2015
ELECTRICAL
Resolved
11/11/2015
PANEL- MDP ONLY OK TO RELEASE UFER GROUND UNDER PANEL /STEEL ABOVE AND TO THE WEST OF ELECTRICAL ROOM. PANELS- 1 2 3 4
Miscellaneous Inspection Passed 11/11/2015
Misc
Resolved
11/11/2015
SOUTH WEST WALL FRAMING - SOUTH WALL COLUMN AUDITORIUM WRAP -CAT WALK INSPECTION, HVAC, ELECTRICAL
Rated Assembly Inspection Passed 11/11/2015
Misc
Resolved
11/11/2015
Rated columns- 1ST LAYER C-1,3,4,8,14,18 K.4,2,5;I-4,2,5,7 H7,13;F.8-8; E-1,14,8-;18,21,23,26 L6,5; N3;P-13,7 Q-14; S-1,6,11,14,3118,21,23,26 U-11,16,21,26 2ND LAYER K4,L6,N3 2ND OF 2 6/24/15 Q.9-16,18,21,23,26. Q-31,0,31,N38,L38,K36,J33,G32,F.1-26,32,21,18,17
All Rough Inspection - Commercial Passed 11/11/2015
THE FOLLOWING AREAS ARE APPROVED
Resolved
11/11/2015
WALL ALL-ROUGH- 1053,1054,1055,1056,1057,1058,1059 PHASE ONE - 1ST FLOOR ONE SIDE ONLY APPROVEDFRONT WALLS CAFE ETC.
Occupancy Inspection - Fire Passed 11/12/2015 at 12:00 AM 11/12/2015
Occupancy Inspection - Codes Commercial Temporary C of O 11/12/2015 at 12:00 AM 11/12/2015
Misc
Resolved
11/12/2015
PARTIAL FINAL INSPECTION- PROVIDE APPROVAL FROM ALL DEPARTMENTS PRIOR TO OCCUPYING. CODES PLANNING WATER PUBLIC WORKS FIRE DEPT.
Misc
Resolved
11/12/2015
ok to stock and train on AV systems. NOT TO BE OPEN FOR SERIVCES OR TO THE PUBLIC.
Misc
Corrective Action Required
11/11/2015
COMPLETE SINKS ON 2ND FLOOR RESTROOMS Pending TCO or C of O approval from other departments. Planning TCO Fire TCO Water APPROVED Public Works- STREET COMPLETION Codes TCO
Occupancy Inspection - Planning Passed 11/12/2015 at 12:00 AM 11/24/2015
Occupancy Inspection - Engineering Passed 11/12/2015 at 12:00 AM 11/24/2015
Occupancy Inspection - Water Utilities Passed 11/12/2015 at 12:00 AM 12/08/2015
Occupancy Inspection - Codes Commercial Full C of O 12/8/2015 12/8/2015 at 12:00 AM 12/08/2015
Misc
Resolved
12/08/2015
COMPLETE SINKS ON 2ND FLOOR RESTROOMS Pending TCO or C of O approval from other departments. Planning TCO Fire TCO Water APPROVED Public Works- STREET COMPLETION Codes TCO
Documents & Images
Date Uploaded File Type Document Name
05/19/2014 Letter Fire Building Plan Review
05/28/2014 Letter Codes P/R Corrections Document
06/23/2014 Letter Fire Building Plan Review
06/30/2014 Letter Codes P/R Corrections Document
08/26/2014 Letter Codes Plan Review Conditions
08/28/2014 Letter Codes Building Permit
08/28/2014 Receipt Receipt for transaction: 2014-001658
09/08/2014 Letter Inspection Summary
09/10/2014 Letter Inspection Summary
09/16/2014 Letter Inspection Summary
09/22/2014 Letter Inspection Summary
09/22/2014 Letter Inspection Summary
09/23/2014 Letter Inspection Summary
09/24/2014 Letter Inspection Summary
09/25/2014 Letter Inspection Summary
09/26/2014 Letter Inspection Summary
09/30/2014 Letter Inspection Summary
10/07/2014 Letter Inspection Summary
10/17/2014 Letter Inspection Summary
10/31/2014 Letter Inspection Summary
11/05/2014 Letter Inspection Summary
11/26/2014 Letter Inspection Summary
12/19/2014 Letter Inspection Summary
12/30/2014 Letter Inspection Summary
01/23/2015 Letter Inspection Summary
02/10/2015 Letter Inspection Summary
02/12/2015 Letter Fire (Sprinkler) Plan Review
02/24/2015 Letter Fire (Alarm) Plan Review Notice
03/16/2015 Letter Inspection Summary
04/06/2015 Letter Inspection Summary
04/10/2015 Letter Fire (Sprinkler) Plan Review
04/16/2015 Letter Fire Building Plan Review
04/17/2015 Letter Inspection Summary
05/05/2015 Letter Inspection Summary
05/06/2015 Letter Inspection Summary
05/13/2015 Letter Inspection Summary
05/21/2015 Letter Inspection Summary
05/27/2015 Letter Inspection Summary
06/03/2015 Letter Inspection Summary
06/10/2015 Letter Inspection Summary
06/12/2015 Letter Inspection Summary
06/18/2015 Letter Inspection Summary
06/24/2015 Letter Inspection Summary
07/21/2015 Letter Inspection Summary
07/29/2015 Letter Inspection Summary
08/17/2015 Catwalk Head Height Code Determination Request
08/18/2015 Letter Inspection Summary
08/25/2015 Letter Inspection Summary
09/01/2015 Letter Inspection Summary
09/03/2015 Letter Inspection Summary
09/09/2015 Letter Inspection Summary
09/15/2015 Letter Inspection Summary
09/28/2015 Letter Inspection Summary
09/30/2015 Letter Inspection Summary
10/02/2015 Letter Inspection Summary
10/08/2015 Letter Inspection Summary
10/12/2015 Letter Inspection Summary
10/13/2015 Letter Inspection Summary
10/15/2015 Letter Inspection Summary
10/19/2015 Special Inspections - final report
10/19/2015 Letter Inspection Summary
10/22/2015 Letter Inspection Summary
10/28/2015 Letter Inspection Summary
11/11/2015 Letter Inspection Summary
11/12/2015 Letter Codes Temporary Certificate of Occupancy
11/23/2015 CMR
12/08/2015 Letter Field Certificate of Occupancy
12/09/2015 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home