Summary
PRCOM20140591
Building Permit - Commercial
Final Completion
REORGANIZED SCHOOL DIST NO 7
ALTERATION COMMERCIAL
BUILDING SECURITY UPGRADES
04/09/2014
05/30/2014
09/23/2014
Locations
Contacts
BRUNER CONTRACTING COMPANY LLC, Address:14450 N US 169 HWY STE S, Phone:(816) 474-4300  
REORGANIZED SCHOOL DIST NO 7, Address:600 SE MILLER  
ALLIED ELECTRICAL CONSTRUCTION INC, Address:13416 HORSESHOE DR W, Phone:(816) 532-4446  
OVERLAND PARK MECHANICAL CO LLC, Address:16088 FOSTER, Phone:(913) 814-8200  
THE HOLLIS & MILLER GROUP, Address:1828 WALNUT ST STE 922, Phone:(816) 525-5600  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 04/21/2014 04/28/2014
Brian Austerman
Misc
Corrective Action Required
04/28/2014

Extend sprinkler coverage to include vestibule. Submit as-built drawings for the additional sprinkler coverage
Misc
Corrective Action Required
04/28/2014

Extend the emergency egress lighting for the exterior of the vestibule
Misc
Corrective Action Required
04/28/2014

Extend standpipes to the new entrance, if standpipes are present in the existing vestibule
Building Plan Review Approved with Conditions 04/21/2014 04/16/2014
Joe Frogge
Misc
Resolved
04/22/2014

2012 IBC Section 1008.4.3 Horizontal sliding doors. Item #6 - The door assembly shall have an integrated standby power supply. Action required: Comment for informational purposes. Provide verification of standby power supply at inspection.
Licensed Contractors Rejected 04/21/2014 04/16/2014
Joe Frogge
Business License
Corrective Action Required
04/16/2014

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
License contractors
Corrective Action Required
04/16/2014

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of MEP contractors.
Fire Plan Review Approved with Conditions 04/21/2014 04/11/2014
Brian Austerman
Misc
Corrective Action Required
04/11/2014

Extend sprinkler coverage to include vestibule. Submit as-built drawings for the additional sprinkler coverage
Misc
Corrective Action Required
04/11/2014

Extend the emergency egress lighting for the exterior of the vestibule
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $280.42 $280.42 Paid 05/30/2014
$280.42
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 6/24/2014 (1:00) 6/24/2014 at 12:00 AM 06/24/2014
Above Ceiling Inspection Partial 7/18/2014 at 12:00 AM 07/18/2014
Misc
Partial Correction
07/18/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: GWB SOFFIT @ RECEPTION 101;
Rough Framing Inspection - Commercial Partial 7/18/2014 7/18/2014 at 12:00 AM 07/18/2014
Partial Correction
07/18/2014
OK TO APPLY SHEATHING WHEN READY TO FACIA AT VESTIBULE 100;
Above Ceiling Inspection Partial 7/25/2014 7/25/2014 at 12:00 AM 07/25/2014
Misc
Partial Correction
07/18/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: GWB SOFFIT @ RECEPTION 101; AIRLOCK; EXTERIOR SOFFIT AFTER BOTH FLANGES OF JOISTS ARE SCREWED.
Rough Framing Inspection - Commercial Passed 7/25/2014 7/25/2014 at 12:00 AM 07/25/2014
Above Ceiling Inspection Passed 7/31/2014 7/31/2014 at 12:00 AM 07/31/2014
Misc
Resolved
07/31/2014
OK TO COVER WHEN READY GWB CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: GWB SOFFIT @ RECEPTION 101; AIRLOCK; EXTERIOR SOFFIT AFTER BOTH FLANGES OF JOISTS ARE SCREWED.
Occupancy Inspection - Fire Temporary C of O 8/6/2014 at 12:00 AM 08/06/2014
Misc
Corrective Action Required
08/06/2014
- add additional sprinkler system coverage in the front foyer(s) vestibule(s) - post the numeric addres of 301 on the exterior
Final Inspection - Commercial Not Ready 8/6/2014 8/6/2014 at 12:00 AM 08/06/2014
Misc
Corrective Action Required
08/06/2014
LIGHT FIXTURES NOT COMPLETED AT EXTERIOR SOFFIT.
Misc
Corrective Action Required
08/06/2014
F.P. SPRINKLER WORK IN PROGRESS ABOVE CEILING.
Final Inspection - Commercial Not Ready 8/8/2014 at 12:00 AM 08/08/2014
Misc
Corrective Action Required
08/06/2014
LIGHT FIXTURES NOT COMPLETED AT EXTERIOR SOFFIT.
Misc
Corrective Action Required
08/06/2014
F.P. SPRINKLER WORK IN PROGRESS ABOVE CEILING.
Final Inspection - Commercial Partial 8/12/2014 8/12/2014 at 12:00 AM 08/12/2014
Misc
Resolved
08/12/2014
LIGHT FIXTURES NOT COMPLETED AT EXTERIOR SOFFIT.
Misc
Partial Correction
08/12/2014
OK FOR USE; FOLLOWING ITEMS YET TO COMPLETE: - INSTALLATION OF EXTERIOR FACING PANELS IN PROGRESS - RADIANT HEATING UNIT TO BE INSTALLED IN AIR LOCK
Occupancy Inspection - Fire Passed 8/12/2014 at 12:00 AM 08/12/2014
Misc
Corrective Action Required
08/12/2014
- add additional sprinkler system coverage in the front foyer(s) vestibule(s) - post the numeric addres of 301 on the exterior
Final Inspection - Commercial Passed 9/23/2014 at 12:00 AM 09/23/2014
Misc
Resolved
09/23/2014
OK FOR USE; FOLLOWING ITEMS YET TO COMPLETE: - INSTALLATION OF EXTERIOR FACING PANELS IN PROGRESS - RADIANT HEATING UNIT TO BE INSTALLED IN AIR LOCK
Documents & Images
Date Uploaded File Type Document Name
04/11/2014 Letter Fire Building Plan Review
04/16/2014 Letter Codes P/R Corrections Document
04/16/2014 Letter Codes Plan Review Conditions
04/28/2014 Letter Fire Building Plan Review
05/30/2014 Letter Codes Building Permit
06/24/2014 Letter Inspection Summary
07/18/2014 Letter Inspection Summary
07/25/2014 Letter Inspection Summary
07/31/2014 Letter Inspection Summary
08/06/2014 Letter Inspection Summary
08/12/2014 Letter Inspection Summary
09/12/2014 Letter Fire Loss Reduction Form
09/23/2014 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home