Review Type |
Outcome |
Est. Completion Date |
Completed |
Sprinkler Plan Review
|
Released for Construction
|
|
03/14/2014
|
|
Brian Austerman
|
|
Installation acceptance testing
Corrective Action Required
2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
IF THIS AREA IS ABLE TO BE ISOLATED A HYDROSTATIC TEST SHALL BE REQUIRED PER NFPA 24.2.1.5-6. CALL (816) 969-1300 TO SCHEDULE TESTING IF THE AREA CAN BE ISOLATED
|
|
|
Licensed Contractors
|
Approved
|
06/29/2014
|
02/24/2014
|
|
Joe Frogge
|
|
Business License
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawfull for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.Action required - Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
Action Required: Licensed general contractor must be listed on permit prior to issuance.
|
|
License contractors
Corrective Action Required
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Expert from Sec. 7-130, Lees Summit Code of Ordinances.
Action Required: Mechanical, Electrical, and Plumbing contractors must be licensed and listed on permit prior to permit issuance.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
02/09/2014
|
02/06/2014
|
|
Brian Austerman
|
|
Misc
Corrective Action Required
901.2 Construction documents. The fire code official shall
have the authority to require construction documents and calculations
for all fire protection systems and to require permits
be issued for the installation, rehabilitation or modification of
any fire protection system. Construction documents for fire
protection systems shall be submitted for review and approval
prior to system installation.
Provide sprinkler plans for any alterations to the system
|
|
Misc
Corrective Action Required
907.1.1 Construction documents. Construction documents
for fire alarm systems shall be of sufficient clarity to
indicate the location, nature and extent of the work proposed
and show in detail that it will conform to the provisions
of this code, the International Building Code, and
relevant laws, ordinances, rules and regulations, as determined
by the fire code official.
Provide alarm plans if any modifications are made
|
|
Misc
Corrective Action Required
906.2 General requirements. Portable fire extinguishers
shall be selected, installed and maintained in accordance with
this section and NFPA 10.
Provide a minimum of 2A10B:C extinguishers. Verified at inspection
|
|
Misc
Corrective Action Required
2-6-14 No additional FD comments
|
|
|
Building Plan Review
|
Approved with Conditions
|
02/09/2014
|
02/04/2014
|
|
Joe Frogge
|
|
Misc
2012 IBC 803.9 Interior finish requirements based on group. Interior wall and ceiling finish shall have a flame spread index not greater than that specified in Table 803.9 for the group and location designated. Interior wall and ceiling finish materials tested in accordance with NFPA 286 and meeting the acceptance criteria of Section 803.1.2.1 shall be permitted to be used where a Class A Classification in accordance with ASTM E 84 or UL 723 is required.
Required Action: Provide additional information that verifies that finish materials FB-1 & FB-2 meet minimum Class B requirements per 803.1.1
|
|
Bldg - Occupant load posting 1004.3
2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
Required Action: Provide additional information as to what the maximum occupancies will be and where they will be posted.
|
|
Misc
2012 IMC 2406.1 Human impact loads. Individual glazed areas, including glass mirrors, in hazardous locations as defined in Section 2406.4 shall comply with sections 2406.1.1 through 2406.1.4.
Action Required. Provide additional information to verify that safety glass will be installed in appropriate locations.
|
|
Bldg - Occupant load posting 1004.3
2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
Corrective Action: Provide justifiction for 39 occupants in the Enrollement Center #205.
|
|
Misc
Corrective Action Required
2012 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions)
Action Required: This item will be verified in field.
|
|
|
Building Plan Review
|
Rejected
|
07/29/2014
|
01/27/2014
|
|
Joe Frogge
|
|
Misc
Corrective Action Required
2012 IBC 803.9 Interior finish requirements based on group. Interior wall and ceiling finish shall have a flame spread index not greater than that specified in Table 803.9 for the group and location designated. Interior wall and ceiling finish materials tested in accordance with NFPA 286 and meeting the acceptance criteria of Section 803.1.2.1 shall be permitted to be used where a Class A Classification in accordance with ASTM E 84 or UL 723 is required.
Required Action: Provide additional information that verifies that finish materials FB-1 & FB-2 meet minimum Class B requirements per 803.1.1
|
|
Bldg - Occupant load posting 1004.3
Corrective Action Required
2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
Required Action: Provide additional information as to what the maximum occupancies will be and where they will be posted.
|
|
Misc
Corrective Action Required
2012 IMC 2406.1 Human impact loads. Individual glazed areas, including glass mirrors, in hazardous locations as defined in Section 2406.4 shall comply with sections 2406.1.1 through 2406.1.4.
Action Required. Provide additional information to verify that safety glass will be installed in appropriate locations.
|
|
Bldg - Occupant load posting 1004.3
Corrective Action Required
2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
Corrective Action: Provide justifiction for 39 occupants in the Enrollement Center #205.
|
|
Misc
Corrective Action Required
2012 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions)
Action Required: This item will be verified in field.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
01/29/2014
|
01/16/2014
|
|
Brian Austerman
|
|
Misc
Corrective Action Required
901.2 Construction documents. The fire code official shall
have the authority to require construction documents and calculations
for all fire protection systems and to require permits
be issued for the installation, rehabilitation or modification of
any fire protection system. Construction documents for fire
protection systems shall be submitted for review and approval
prior to system installation.
Provide sprinkler plans for any alterations to the system
|
|
Misc
Corrective Action Required
907.1.1 Construction documents. Construction documents
for fire alarm systems shall be of sufficient clarity to
indicate the location, nature and extent of the work proposed
and show in detail that it will conform to the provisions
of this code, the International Building Code, and
relevant laws, ordinances, rules and regulations, as determined
by the fire code official.
Provide alarm plans if any modifications are made
|
|
Misc
Corrective Action Required
906.2 General requirements. Portable fire extinguishers
shall be selected, installed and maintained in accordance with
this section and NFPA 10.
Provide a minimum of 2A10B:C extinguishers. Verified at inspection
|
|
|