Summary
PRCOM20120281
Building Permit - Commercial
Final Completion
NEWPORT INVESTMENTS INC
REPAIR REPLACE UPGRADE
ALTER PUMP SYSTEM TO ACCOMMODATE DIESEL FUELING
02/22/2012
02/24/2012
07/19/2012
Locations
Contacts
DOUBLE CHECK COMPANY INC, Address:PO BOX 300347, Phone:(816) 921-5032  
NEWPORT INVESTMENTS INC, Address:PO BOX 3475  
D E A ELECTRIC LLC, Address:37605 E JIM OWNES RD, Phone:(816) 690-3199  
Reviews
Review Type Outcome Est. Completion Date Completed
Internal Plan Review (Res) Approved 02/24/2012 02/24/2012
Codes Admin
True
Building Plan Review Approved 02/24/2012 02/24/2012
Codes Admin
Fire Plan Review Approved 02/24/2012 02/24/2012
Jim Eden
Misc
Corrective Action Required
02/24/2012

Per a phone conversation with Jack Carmitcheal at Double Check, the raised 6 " islands will remain along with the existing bollards. Confirmed at inspection.
Misc
Corrective Action Required
02/24/2012

The Fire Department shall be called at (816) 969-1300 to witness the line pressure test. The automatic and emergency fuel shut-off tests will be completed at the conclusion of the project.
Misc
Corrective Action Required
02/24/2012

The new dispenser shall have all of the appropriate labeling per IFC 2205.6: Warning signs. Warning signs shall be conspicuously posted within sight of each dispenser in the fuel-dispensing area and shall state the following: 1. No smoking. 2. Shut off motor. 3. Discharge your static electricity before fueling by touching a metal surface away from the nozzle. 4. To prevent static charge, do not reenter your vehicle while gasoline is pumping. 5. If a fire starts, do not remove nozzle—back away immediately. 6. It is unlawful and dangerous to dispense gasoline into unapproved containers. 7. No filling of portable containers in or on a motor vehicle. Place container on ground before filling.
Misc
Corrective Action Required
02/24/2012

The use and installation of new and existing fuel dispensers shall be in accordance with IFC Chapter 22 Motor Fuel Dispensing Facilities.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Repair/Replace/Upgrade $335.30 $335.30 Paid 02/24/2012
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Miscellaneous Inspection Passed 2/28/2012 at 12:00 AM 07/13/2012
Misc
Corrective Action Required
07/13/2012
fuel line pressure test for a diesel fuel pump addition, the normal operating pressure for the system is 30-35psi. the test started and ended with 40 psi after a 1-hour test period
Final Inspection - Commercial Passed 7/19/2012 7/19/2012 at 12:00 AM 07/19/2012
Occupancy Inspection - Fire Passed 7/19/2012 at 12:00 AM 07/19/2012
Misc
Corrective Action Required
07/19/2012
Appeared OK at the time of the inspection
Documents & Images
Date Uploaded File Type Document Name
02/24/2012 Letter Building Permit
02/24/2012 Letter Plan Review Conditions
07/13/2012 Letter Fire Loss Reduction Form
07/13/2012 Letter Fire Loss Reduction Form
07/19/2012 Letter Inspection Summary
07/19/2012 Letter Fire Loss Reduction Form
06/25/2013 Letter Fire Building Plan Review
06/26/2013 Letter Fire Building Plan Review
06/26/2013 Letter Fire Loss Reduction Form
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home