Permit Application Status

PRCOM20112915


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20112915
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
ADDITION COMMERCIAL
SAINT LUKE'S EAST ER ADDITION #2
06/15/2011
08/04/2011
12/28/2011
04/04/2012
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:100 NW SAINT LUKES BOULEVARD  
ACI BOLAND, Address:11229 NALL, SUITE 140  
TURNER CONSTRUCTION COMPANY, Address:1220 WASHINGTON STE 1000, Phone:(816) 283-0555  
MARK ONE ELECTRIC CO INC, Address:1414 GENESSEE ST, Phone:(816) 842-7023  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 08/11/2011 12/15/2011
Jim Eden
Misc
Corrective Action Required
12/15/2011

No comments on resubmittal dated 11/3/11.
Sprinkler Plan Review Released for Construction 10/28/2011
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
10/28/2011

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Plans received October 26, 2011.
Installation acceptance testing
Corrective Action Required
10/28/2011

2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule hydrostatic and flow tests.
Internal Plan Review (Res) Approved 08/04/2011
Mike Weisenborn
Building Plan Review Approved 08/09/2011 08/04/2011
Mike Weisenborn
Misc
Corrective Action Required
08/04/2011

This project requires a third party review of the electrical system. A permit can not be issued until that review has been completed and required corrections have been made. Action required - Revised electrical sheets shall be provided based on the electrical comments provided.
Final Development Plan
Resolved
08/04/2011

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required - This comment is for information purposes.
Plumb - Indirect Waste General
Corrective Action Required
08/04/2011

2006 IPC Section 801.2 - Protection. All devices, appurtenances, appliances and apparatus intended to serve some special function, such as sterilization, distillation, processing, cooling, or storage of ice or foods, and that discharge to the drainage system, shall be provided with protection against backflow, flooding fouling, contamination and stoppage of the drain. Action required - This comment is in regards to the ice machine in the clean room. Compliance will be verified on inspection.
Internal Plan Review (Res) Rejected 06/29/2011 07/01/2011
Mike Weisenborn
Fire Plan Review Approved 06/29/2011 06/30/2011
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
06/30/2011

2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required: Provide shop drawings for sprinkler alteration.
Construction documents for fire alarm systems
Corrective Action Required
06/30/2011

2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required: Provide shop drawings for alarm alterations.
Misc
Corrective Action Required
06/30/2011

IFC 1411.2 Maintenance. Required means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress systems and facilities. Action required: Temporary exits and pathways shall be clearly marked. Verified at inspection.
Fire-resistant-rated construction - Maintenance
Corrective Action Required
06/30/2011

2006 IFC 703.1- Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, firestops, shaft enclosures, partitions, smoke barriers, floors, fire-resistive coatings and sprayed fire-resistant materials applied to structural members and fire-resistant joint systems) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance-rated assemblies shall be protected by self- or automatic-closing doors of approved construction meeting the fire protection requirements for the assembly. Verified at inspection.
Misc
Corrective Action Required
06/30/2011

3006.4 Medical gas systems. Medical gas systems including, but not limited to, distribution piping, supply manifolds, connections, pressure regulators and relief devices and valves, shall comply with NFPA 99 and the general provisions of this chapter. Action required: Provide documentation of pressure testing on the line. Line labeling verified at inspection.
Portable fire extinguishers - general
Corrective Action Required
06/30/2011

2006 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required: Any fire extinguisher removed from the existing area shall be replaced. Verified at inspection.
Fire protection equipment identification
Corrective Action Required
06/30/2011

2006 IFC 510.1- Identification. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location, shall be constructed of durable materials, permanently installed and readily visible. Action required: Fire sprinkler controls shall be accessible and marked. Verified at inspection.
Building Plan Review Rejected 06/29/2011 06/29/2011
Mike Weisenborn
Misc
Corrective Action Required
06/28/2011

This project requires a third party review of the electrical system. A permit can not be issued until that review has been completed and required corrections have been made. Action required - This comment is for information purposes.
Final Development Plan
Corrective Action Required
06/28/2011

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required - This comment is for information purposes.
Plumb - Indirect Waste General
Corrective Action Required
06/29/2011

2006 IPC Section 801.2 - Protection. All devices, appurtenances, appliances and apparatus intended to serve some special function, such as sterilization, distillation, processing, cooling, or storage of ice or foods, and that discharge to the drainage system, shall be provided with protection against backflow, flooding fouling, contamination and stoppage of the drain. Action required - This comment is in regards to the ice machine in the clean room. Compliance will be verified on inspection.
License Tax Codes Approved 06/29/2011 06/29/2011
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $12,812.76 $12,812.76 Paid 08/04/2011
9123001-Escrow Deposit $1,613.61 $1,613.61 Paid 07/06/2011
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Plumbing Inspection - Commercial Not Ready 8/24/2011 (8:00 to 5:00) 8/24/2011 at 12:00 AM 08/24/2011
Misc
Corrective Action Required
08/24/2011
STORM SEWER LINE REQUESTED FOR INSPECTION SUBSTANTIALLY COVERED BEFORE INSPECTION
Underground Plumbing Inspection - Commercial Partial 8/25/2011 at 12:00 AM 08/25/2011
Misc
Corrective Action Required
08/24/2011
STORM SEWER LINE SOUTH/SOUTHWEST FROM 0+56+90 SUBSTANTIALLY COVERED BEFORE REQUESTED INSPECTION
Misc
Partial Correction
08/25/2011
12" HDPE FROM FIELD INLET @ 0+56+90 105' EAST TO 1+45.35 AND 8" C.I. TO EXSTG STUB @ E.R. BLDG OK TO COVER WHEN READY AFTER ELECTRICAL GROUND RING & LIGHTNING PROTECTION AND BUILDING WATERPROOFING ARE REPAIRED
Underground Plumbing Inspection - Commercial Partial 8/25/2011 at 12:00 AM 08/25/2011
Misc
Corrective Action Required
08/25/2011
STORM SEWER LINE FROM CURB INLET @ 0+00.00 TO 0+56+90 SUBSTANTIALLY COVERED BEFORE REQUESTED INSPECTION
Misc
Partial Correction
08/25/2011
12" HDPE FROM FIELD INLET @ 0+56+90 105' EAST TO 1+61.76 AND 8" C.I. SE FROM 1+45.35 TO EXSTG STUB @ E.R. BLDG OK TO COVER WHEN READY. ELECTRICAL GROUND RING & LIGHTNING PROTECTION AND BUILDING WATERPROOFING HAVE BEEN REPAIRED PER G.C.
Underground Electrical Inspection - Commercial Partial 8/25/2011 8/25/2011 at 12:00 AM 08/25/2011
Misc
Partial Correction
08/25/2011
DAMAGED EXISTING GROUND RING AND LIGHTNING PROTECTION CABLE REPAIRED AND PREPARED FOR EXPANSION BY E.C.
Underground Plumbing Inspection - Commercial Passed 8/30/2011 at 12:00 AM 08/30/2011
Misc
Resolved
08/30/2011
STORM SEWER LINE FROM CURB INLET @ 0+00.00 TO 0+56+90 SUBSTANTIALLY COVERED BEFORE REQUESTED INSPECTION
Misc
Resolved
08/30/2011
12" HDPE FROM FIELD INLET @ 0+56+90 105' EAST TO 1+61.76 AND 8" C.I. SE FROM 1+45.35 TO EXSTG STUB @ E.R. BLDG OK TO COVER WHEN READY. ELECTRICAL GROUND RING & LIGHTNING PROTECTION AND BUILDING WATERPROOFING HAVE BEEN REPAIRED PER G.C.
Sewer Service Inspection Partial 9/1/2011 at 12:00 AM 09/01/2011
Misc
Partial Correction
09/01/2011
SANITARY SEWER SERVICE LINE FROM FCO @ (1)/(A.6) WEST TO M.H. LOCATION @ STA 0+07.95;
Sewer Service Inspection Partial 9/1/2011 at 12:00 AM 09/01/2011
Misc
Partial Correction
09/01/2011
OK TO COVER WHEN READY 4" C.I. SANITARY SEWER SERVICE LINE FROM FCO @ (1)/(A.6) WEST TO M.H. LOCATION @ STA 0+07.95;
Footing Inspection - Commercial Partial 9/2/2011 (11:00) 9/2/2011 at 12:00 AM 09/02/2011
Misc
Partial Correction
09/02/2011
OK TO POUR WHEN READY: PERIMETER FOOTING, GRADE BEAM, AND INTEGRAL PIERS;
Footing Inspection - Commercial Partial 9/2/2011 at 12:00 AM 09/02/2011
Misc
Partial Correction
09/02/2011
OK TO POUR WHEN READY: PERIMETER FOOTING, GRADE BEAM, AND INTEGRAL COLUMN FOOTINGS;
Foundation Inspection - Commercial Partial 9/7/2011 (8:00) 9/7/2011 at 12:00 AM 09/07/2011
Misc
Partial Correction
09/07/2011
OK TO POUR WHEN READY FOUNDATION WALL FOLLOWING SEGMENTS: (A)/(5) TO (A)/(1) TO (1)/(B.4);
Footing Inspection - Commercial Partial 9/9/2011 (1:00) 9/9/2011 at 12:00 AM 09/08/2011
Misc
Partial Correction
09/02/2011
OK TO POUR WHEN READY: PERIMETER FOOTING, GRADE BEAM, AND INTEGRAL COLUMN FOOTINGS; THREE TYPE F3 INTERIOR COLUMN FOOTINGS -- TWO WITH PIER RE-BAR
Foundation Inspection - Commercial Partial 9/9/2011 (10:30) 9/9/2011 at 12:00 AM 09/09/2011
Misc
Partial Correction
09/07/2011
OK TO POUR WHEN READY FOUNDATION WALL FOLLOWING SEGMENTS: (A)/(5) TO (A)/(1) TO (1)/(B.4); (1)/(B.4) TO (1)/(D) TO (1.7)/(D) TO (1.7)/(C) TO (4.8)/(C)
Sewer Service Inspection Partial 9/22/2011 at 12:00 AM 09/22/2011
Misc
Partial Correction
09/01/2011
OK TO COVER WHEN READY 4" C.I. SANITARY SEWER SERVICE LINE FROM FCO @ (1)/(A.6) WEST TO M.H. LOCATION @ STA 0+07.95;
Misc
Partial Correction
09/22/2011
OK TO COVER WHEN READY 4" PVC SAN SEWER LINE FROM WEST BUILDING LINE TO STA 0+07.95; SAMPLING M.H. PER LS D&C MANUAL SS-6; 4" PVC FROM M.H. TO TAPPING SLEEVE AT SEWER SERVICE LINE PER APROVED DRWG
Underslab Plumbing Inspection - Commercial Passed 9/29/2011 9/29/2011 at 12:00 AM 09/29/2011
Above Ceiling Inspection Partial 9/29/2011 at 12:00 AM 09/29/2011
Misc
Partial Correction
09/29/2011
OK TO COVER WHEN READY ABOVE-CEILING TIE-IN EXTENSIONS OF WATER, HEATING WATER, SPRINKLER F.P., MED GAS, AND ELECTRICAL SYSTEMS @ EXISTING EXAM ROOMS 4,5, & 6
In-wall Inspection Partial 11/28/2011 11/29/2011 at 12:00 AM 11/29/2011
Misc
Corrective Action Required
11/29/2011
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT SPACES: 81; 82 S,E,W,; 162 N;
In-wall Inspection Partial 12/13/2011 at 12:00 AM 12/13/2011
Misc
Partial Correction
12/13/2011
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT SPACES: 81; 82 S,E,W,; 162 N; 74; 75; 76; 77; 78; 78B; 79; 79B; 80;
In-wall Inspection Partial 12/14/2011 at 12:00 AM 12/14/2011
Misc
Partial Correction
12/13/2011
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT SPACES: 81; 82 S,E,W,; 162 N; 74; 75; 76; 77; 78; 78B; 79; 79B; 80; 98 W WALL; 95 N WALL FROM 73 TO WEST;
In-wall Inspection Partial 12/16/2011 12/16/2011 at 12:00 AM 12/16/2011
Misc
Partial Correction
12/14/2011
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT SPACES: 74; 75; 76; 77; 78; 78B; 79; 79B; 80; 81; 82 S,E,W; 95 N WALL FROM 73 TO WEST; 98 W WALL; 162 N; 71; 72; 83; 84; 85; 155 SW CORNER;
In-wall Inspection Partial 12/20/2011 12/20/2011 at 12:00 AM 12/20/2011
Misc
Partial Correction
12/16/2011
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT SPACES: 71; 72; 74; 75; 76; 77; 78; 78B; 79; 79B; 80; 81; 82 S,E,W; 83; 84; 85; 95 N WALL FROM 73 TO WEST; 98 W WALL; 155 SW CORNER; 162 N; 91; 92; 93; 94;
In-wall Inspection Partial 12/22/2011 12/22/2011 at 12:00 AM 12/22/2011
Misc
Partial Correction
12/20/2011
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT SPACES: 71; 72; 74; 75; 76; 77; 78; 78B; 79; 79B; 80; 81; 82 S,E,W; 83; 84; 85; 91; 92; 93; 94; 95 N WALL FROM 73 TO WEST; 98 W WALL; 155 SW CORNER; 162 N; 86; 88; 95 S WALL W OF DOOR 90A; 98 E WALL @ 93; 97 N WALL W OF DOOR 90B;
In-wall Inspection Partial 12/28/2011 12/28/2011 at 12:00 AM 12/28/2011
Misc
Partial Correction
12/22/2011
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT SPACES: 71; 72; 74; 75; 76; 77; 78; 78B; 79; 79B; 80; 81; 82 S,E,W; 83; 84; 85; 91; 92; 93; 94; 95 N WALL FROM 73 TO WEST; 98 W WALL; 155 SW CORNER; 162 N; 86; 88; 95 S WALL W OF DOOR 90A; 98 E WALL @ 93; 97 N WALL W OF DOOR 90B; 67;
Concrete Walls and Columns Inspection Partial 12/29/2011 (2:00) 12/29/2011 at 12:00 AM 12/29/2011
Misc
Partial Correction
12/29/2011
OK TO POUR WHEN READY RETAINING WALL FOR SIDEWALK OUTSIDE NORTH EXTERIOR BUILDING WALL
Above Ceiling Inspection Partial 12/29/2011 12/29/2011 at 12:00 AM 12/29/2011
Misc
Partial Correction
09/29/2011
OK TO COVER WHEN READY ABOVE-CEILING TIE-IN EXTENSIONS OF WATER, HEATING WATER, SPRINKLER F.P., MED GAS, AND ELECTRICAL SYSTEMS @ EXISTING EXAM ROOMS 4,5, & 6
Misc
Partial Correction
12/29/2011
OK TO COVER WHEN READY CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT SPACES: 162;
In-wall Inspection Partial 12/30/2011 12/30/2011 at 12:00 AM 12/30/2011
Misc
Partial Correction
12/28/2011
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT SPACES: 67; 71; 72; 74; 75; 76; 77; 78; 78B; 79; 79B; 80; 81; 82 S,E,W; 83; 84; 85; 86; 88; 91; 92; 93; 94; 98 W WALL; 155 SW CORNER; 162 N; ; 98 E WALL @ 93; 97 N WALL W OF DOOR 90B; 89; 90; 95; 96;
Sprinkler - Hydrostatic Test Passed 12/29/2011 at 12:00 AM 01/03/2012
Rated Assembly Inspection Partial 1/4/2012 1/4/2012 at 12:00 AM 01/04/2012
Misc
Partial Correction
01/04/2012
OK TO TAPE, MUD, AND FIRE-SEAL 5/8" TYPE X GWB AT FOLLOWING SPACES: 91 INNER AND OUTER FACES;
Rated Assembly Inspection Partial 1/6/2012 at 12:00 AM 01/06/2012
Misc
Partial Correction
01/04/2012
OK TO TAPE, MUD, AND FIRE-SEAL 5/8" TYPE X GWB AT FOLLOWING SPACES: 89; 90; 91; 95; 96; 97;
Above Ceiling Inspection Partial 1/11/2012 at 12:00 AM 01/11/2012
Misc
Partial Correction
12/29/2011
OK TO COVER WHEN READY ABOVE-CEILING TIE-IN EXTENSIONS OF WATER, HEATING WATER, SPRINKLER F.P., MED GAS, AND ELECTRICAL SYSTEMS @ EXISTING EXAM ROOMS 4,5, & 6
Misc
Partial Correction
12/29/2011
OK TO COVER WHEN READY CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT SPACES: 162; 112 AFTER ONE BOX ENTRY NIPPLE IS REMOVED AND HOLE PLUGGED + ENSURE UNSECURED LOW VOLTAGE BOX IS PROPERLY SECURED WHEN SYSTEM IS RE-CONFIGURED;
Above Ceiling Inspection Partial 1/17/2012 at 12:00 AM 01/17/2012
Misc
Partial Correction
01/11/2012
OK TO COVER WHEN READY ABOVE-CEILING TIE-IN EXTENSIONS OF WATER, HEATING WATER, SPRINKLER F.P., MED GAS, AND ELECTRICAL SYSTEMS @ EXISTING EXAM ROOMS 4,5, & 6
Misc
Partial Correction
01/11/2012
OK TO COVER WHEN READY CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT SPACES: 162; 112; 73-76; 84-86;
Above Ceiling Inspection Partial 1/19/2012 at 12:00 AM 01/19/2012
Misc
Partial Correction
01/17/2012
OK TO COVER WHEN READY ABOVE-CEILING TIE-IN EXTENSIONS OF WATER, HEATING WATER, SPRINKLER F.P., MED GAS, AND ELECTRICAL SYSTEMS @ EXISTING EXAM ROOMS 4,5, & 6
Misc
Partial Correction
01/17/2012
OK TO COVER WHEN READY CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT SPACES: 73-76; 84-86; 112; 162; 77-80B; 83; 88; 90; 95-98;
Above Ceiling Inspection Partial 1/20/2012 at 12:00 AM 01/20/2012
Misc
Partial Correction
01/19/2012
OK TO COVER WHEN READY ABOVE-CEILING TIE-IN EXTENSIONS OF WATER, HEATING WATER, SPRINKLER F.P., MED GAS, AND ELECTRICAL SYSTEMS @ EXISTING EXAM ROOMS 4,5, & 6
Misc
Partial Correction
01/19/2012
OK TO COVER WHEN READY CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT SPACES: 73-76; 77-80B; 83-86; 88; 90; 95-98; 112; 162; 71; 72; 87; 89; 91-94;
Misc
Corrective Action Required
01/20/2012
SPACE 155: REMOVE ABANDONED ANGLE BRACES; CHECK/REPAIR DISCONNECTED FLEX ELECTRICAL CONDUIT AND FIRE ALARM CONDUCTORS
Above Ceiling Inspection Partial 1/24/2012 at 12:00 AM 01/24/2012
Misc
Resolved
01/24/2012
OK TO COVER WHEN READY ABOVE-CEILING TIE-IN EXTENSIONS OF WATER, HEATING WATER, SPRINKLER F.P., MED GAS, AND ELECTRICAL SYSTEMS @ EXISTING EXAM ROOMS 4,5, & 6
Misc
Partial Correction
01/20/2012
OK TO COVER WHEN READY CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT SPACES: 71; 72; 73-76; 77-80B; 83-86; 87; 88; 89; 90; 91-94; 95-98; 112; 155; 162
Misc
Resolved
01/24/2012
SPACE 155: REMOVE ABANDONED ANGLE BRACES; CHECK/REPAIR DISCONNECTED FLEX ELECTRICAL CONDUIT AND FIRE ALARM CONDUCTORS
Above Ceiling Inspection Passed 1/26/2012 at 12:00 AM 01/26/2012
Misc
Resolved
01/26/2012
OK TO COVER WHEN READY CEILING FRAMING AND ABOVE-CEILING SYSTEMS AT SPACES: 71; 72; 73-76; 77-80B; 83-86; 87; 88; 89; 90; 91-94; 95-98; 112; 155; 162
Concrete Walls and Columns Inspection Passed 1/26/2012 at 12:00 AM 01/26/2012
Misc
Resolved
01/26/2012
OK TO POUR WHEN READY RETAINING WALL FOR SIDEWALK OUTSIDE NORTH EXTERIOR BUILDING WALL
Footing Inspection - Commercial Passed 1/26/2012 at 12:00 AM 01/26/2012
Misc
Resolved
01/26/2012
OK TO POUR WHEN READY: PERIMETER FOOTING, GRADE BEAM, AND INTEGRAL COLUMN FOOTINGS; THREE TYPE F3 INTERIOR COLUMN FOOTINGS -- TWO WITH PIER RE-BAR
Foundation Inspection - Commercial Passed 1/26/2012 at 12:00 AM 01/26/2012
Misc
Resolved
01/26/2012
OK TO POUR WHEN READY FOUNDATION WALL FOLLOWING SEGMENTS: (A)/(5) TO (A)/(1) TO (1)/(B.4); (1)/(B.4) TO (1)/(D) TO (1.7)/(D) TO (1.7)/(C) TO (4.8)/(C)
In-wall Inspection Passed 1/26/2012 at 12:00 AM 01/26/2012
Misc
Resolved
01/26/2012
OK TO COVER WHEN READY WALL FRAMING AND IN-WALL SYSTEMS AT SPACES: 67; 71; 72; 74; 75; 76; 77; 78; 78B; 79; 79B; 80; 81; 82 S,E,W; 83; 84; 85; 86; 88; 91; 92; 93; 94; 98 W WALL; 155 SW CORNER; 162 N; ; 98 E WALL @ 93; 97 N WALL W OF DOOR 90B; 89; 90; 95; 96;
Miscellaneous Inspection Passed 1/26/2012 at 12:00 AM 01/26/2012
Rated Assembly Inspection Passed 1/26/2012 at 12:00 AM 01/26/2012
Misc
Resolved
01/26/2012
OK TO TAPE, MUD, AND FIRE-SEAL 5/8" TYPE X GWB AT FOLLOWING SPACES: 89; 90; 91; 95; 96; 97;
Sewer Service Inspection Passed 1/26/2012 at 12:00 AM 01/26/2012
Misc
Resolved
01/26/2012
OK TO COVER WHEN READY 4" C.I. SANITARY SEWER SERVICE LINE FROM FCO @ (1)/(A.6) WEST TO M.H. LOCATION @ STA 0+07.95;
Misc
Resolved
01/26/2012
OK TO COVER WHEN READY 4" PVC SAN SEWER LINE FROM WEST BUILDING LINE TO STA 0+07.95; SAMPLING M.H. PER LS D&C MANUAL SS-6; 4" PVC FROM M.H. TO TAPPING SLEEVE AT SEWER SERVICE LINE PER APROVED DRWG
Underground Electrical Inspection - Commercial Passed 1/26/2012 at 12:00 AM 01/26/2012
Misc
Resolved
01/26/2012
DAMAGED EXISTING GROUND RING AND LIGHTNING PROTECTION CABLE REPAIRED AND PREPARED FOR EXPANSION BY E.C.
Occupancy Inspection - Fire Temporary C of O 1/27/2012 at 12:00 AM 01/27/2012
Misc
Corrective Action Required
01/27/2012
(1) label all mechanical and electrical rooms from the corridor (2) label the isolation valve for the sprinkler system in the water manifold closet (3) remove all dust covers from the smoke detectors throughout (4) confirm the mag lock on the man door exit drops off on alarm activation
Occupancy Inspection - Codes Commercial Temporary C of O 1/27/2012 at 12:00 AM 01/27/2012
Misc
Corrective Action Required
01/27/2012
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Corrective Action Required
01/27/2012
RESOLVE PLANNING & DEVELOPMENT ISSUES
Misc
Corrective Action Required
01/27/2012
RESOLVE PUBLIC WORKS ISSUES. ENSURE RUNOFF IS PREVENTED PER PUBLIC WORKS REQUIREMENTS PENDING SODDING AND COMPLETION OF FINISH SITEWORK.
Misc
Corrective Action Required
01/27/2012
PANIC HARDWARE TO BE INSTALLED AT STEEL GATE ON EGRESS PATH OUTSIDE NORTH WALL OF BUILDING ADDITION.
Misc
Corrective Action Required
01/27/2012
ROOFTOP LIGHTNING PROTECTION TO BE INSTALLED/RESTORED.
Misc
Corrective Action Required
01/27/2012
WHEN ALL ROOFTOP WORK IS COMPLETED ENSURE ALL DEBRIS AND UNUSED MATERIAL IS REMOVED FROM ROOFTOP AND FROM ROOF DRAINS.
Occupancy Inspection - Fire Passed 2/22/2012 at 12:00 AM 02/22/2012
Misc
Corrective Action Required
01/27/2012
(1) label all mechanical and electrical rooms from the corridor (2) label the isolation valve for the sprinkler system in the water manifold closet (3) remove all dust covers from the smoke detectors throughout (4) confirm the mag lock on the man door exit drops off on alarm activation
Misc
Corrective Action Required
02/22/2012
All pending issues from previous inspection have been corrected
Sprinkler - Flow Test Passed 1/25/2012 at 12:00 AM 02/22/2012
Occupancy Inspection - Codes Commercial Temporary C of O 2/22/2012 2/22/2012 at 12:00 AM 02/22/2012
Misc
Resolved
02/22/2012
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Corrective Action Required
02/09/2012
RESOLVE PLANNING & DEVELOPMENT ISSUES; RE-INSPECTION TO BE REQUESTED WHEN FINISH SITEWORK IS COMPLETED.
Misc
Corrective Action Required
02/09/2012
RESOLVE PUBLIC WORKS ISSUES
Misc
Resolved
02/22/2012
PANIC HARDWARE TO BE INSTALLED AT STEEL GATE ON EGRESS PATH OUTSIDE NORTH WALL OF BUILDING ADDITION.
Misc
Resolved
02/22/2012
ROOFTOP LIGHTNING PROTECTION TO BE INSTALLED/RESTORED.
Misc
Resolved
02/22/2012
WHEN ALL ROOFTOP WORK IS COMPLETED ENSURE ALL DEBRIS AND UNUSED MATERIAL IS REMOVED FROM ROOFTOP AND FROM ROOF DRAINS.
Occupancy Inspection - Codes Commercial Temporary C of O 2/9/2012 at 12:00 AM 03/01/2012
Misc
Corrective Action Required
01/27/2012
RESOLVE FIRE DEPARTMENT ISSUES
Misc
Corrective Action Required
01/27/2012
RESOLVE PLANNING & DEVELOPMENT ISSUES
Misc
Corrective Action Required
01/27/2012
RESOLVE PUBLIC WORKS ISSUES. ENSURE RUNOFF IS PREVENTED PER PUBLIC WORKS REQUIREMENTS PENDING SODDING AND COMPLETION OF FINISH SITEWORK.
Misc
Corrective Action Required
01/27/2012
PANIC HARDWARE TO BE INSTALLED AT STEEL GATE ON EGRESS PATH OUTSIDE NORTH WALL OF BUILDING ADDITION.
Misc
Corrective Action Required
01/27/2012
ROOFTOP LIGHTNING PROTECTION TO BE INSTALLED/RESTORED.
Misc
Corrective Action Required
01/27/2012
WHEN ALL ROOFTOP WORK IS COMPLETED ENSURE ALL DEBRIS AND UNUSED MATERIAL IS REMOVED FROM ROOFTOP AND FROM ROOF DRAINS.
Occupancy Inspection - Codes Commercial Full C of O 4/4/2012 at 12:00 AM 04/04/2012
Misc
Resolved
04/04/2012
RESOLVE PLANNING & DEVELOPMENT ISSUES; RE-INSPECTION TO BE REQUESTED WHEN FINISH SITEWORK IS COMPLETED.
Misc
Resolved
04/03/2012
NO REMAINING PUBLIC WORKS ISSUES PER TELECON W/ BILL LYON 4/3/12
Documents & Images
Date Uploaded File Type Document Name
07/01/2011 Letter Plan Review Conditions
08/04/2011 Letter Plan Review Conditions
08/04/2011 Letter Building Permit
08/25/2011 Letter Inspection Summary
08/25/2011 Letter Inspection Summary
08/30/2011 Letter Inspection Summary
09/01/2011 Letter Inspection Summary
09/02/2011 Letter Inspection Summary
09/07/2011 Letter Inspection Summary
09/08/2011 Letter Inspection Summary
09/09/2011 Letter Inspection Summary
09/22/2011 Letter Inspection Summary
09/29/2011 Letter Inspection Summary
11/29/2011 Letter Inspection Summary
12/13/2011 Letter Inspection Summary
12/14/2011 Letter Inspection Summary
12/16/2011 Letter Inspection Summary
12/20/2011 Letter Inspection Summary
12/22/2011 Letter Inspection Summary
12/28/2011 Letter Inspection Summary
12/29/2011 Letter Inspection Summary
12/30/2011 Letter Inspection Summary
01/04/2012 Letter Inspection Summary
01/06/2012 Letter Inspection Summary
01/11/2012 Letter Inspection Summary
01/17/2012 Letter Inspection Summary
01/19/2012 Letter Inspection Summary
01/20/2012 Letter Inspection Summary
01/24/2012 Letter Inspection Summary
01/27/2012 Letter Fire Loss Reduction Form
01/27/2012 Letter Temporary Certificate of Occupancy
02/09/2012 Letter Temporary Certificate of Occupancy
02/22/2012 Letter Fire Loss Reduction Form
02/22/2012 Letter Temporary Certificate of Occupancy
04/04/2012 Letter Field Certificate of Occupancy
04/05/2012 Letter Final Certificate of Occupancy
06/21/2013 Letter Fire Building Plan Review
06/21/2013 Letter Fire Building Plan Review
06/21/2013 Letter Fire Loss Reduction Form
06/21/2013 Letter Fire Loss Reduction Form
06/21/2013 Letter Fire Loss Reduction Form
06/21/2013 Letter Fire Loss Reduction Form
06/27/2013 Letter Fire (Sprinkler) Plan Review
08/21/2013 Letter Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home