Review Type |
Outcome |
Est. Completion Date |
Completed |
Sprinkler Plan Review
|
Released for Construction
|
|
06/09/2011
|
|
Jim Eden
|
|
Construction documents - Fire protection systems
Corrective Action Required
2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Plans recieved May 27, 2011.
|
|
Installation acceptance testing
Corrective Action Required
2006 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Action required: Call (816) 969-1300 to schedule testing.
|
|
|
Internal Plan Review (Res)
|
Approved
|
|
04/27/2011
|
|
Mike Weisenborn
|
|
|
Building Plan Review
|
Approved
|
05/02/2011
|
04/27/2011
|
|
Mike Weisenborn
|
|
Health Dept Review
For the Health Department review contact Chris Saxton with the Jackson County Public Works Department, Environmental Services Division, at 816-881-4455. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Action required - Provide documentation of the Health Departments plan review approval.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Chris Saxton with the Jackson County Public Works Department, Environmental Health Division at 816-881-4455. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required - This comment is for information purposes. A responce is not necessary.
|
|
Planning - Signs
Corrective Action Required
Exterior signage is not included in the building permit review. Please contact the Planning and Development Department at (816) 969-1600 for application, review and permit requirments.
Action required - This comment is for information purposes.
|
|
Misc
Corrective Action Required
The license tax shall be paid on the shell building prior to receiving any type of occupancy on this tenant space.
This comment is for information purposes.
|
|
Misc
Corrective Action Required
This tenant finish can not be issued any type of occupancy, either temporary of full, until the shell building which it is located in is sufficiently completed.
Action required - This comment is for information purposes.
|
|
|
Internal Plan Review (Res)
|
Rejected
|
|
04/15/2011
|
|
Mike Weisenborn
|
|
|
Building Plan Review
|
Rejected
|
04/15/2011
|
04/15/2011
|
|
Mike Weisenborn
|
|
Health Dept Review
Corrective Action Required
For the Health Department review contact Chris Saxton with the Jackson County Public Works Department, Environmental Services Division, at 816-881-4455. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Action required - Provide documentation of the Health Departments plan review approval.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Chris Saxton with the Jackson County Public Works Department, Environmental Health Division at 816-881-4455. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required - This comment is for information purposes. A responce is not necessary.
|
|
Planning - Signs
Corrective Action Required
Exterior signage is not included in the building permit review. Please contact the Planning and Development Department at (816) 969-1600 for application, review and permit requirments.
Action required - This comment is for information purposes.
|
|
Misc
Corrective Action Required
The license tax shall be paid on the shell building prior to receiving any type of occupancy on this tenant space.
This comment is for information purposes.
|
|
Misc
Corrective Action Required
This tenant finish can not be issued any type of occupancy, either temporary of full, until the shell building which it is located in is sufficiently completed.
Action required - This comment is for information purposes.
|
|
|
License Tax Codes
|
Approved
|
04/15/2011
|
04/13/2011
|
|
Mike Weisenborn
|
|
|
Fire Plan Review
|
Approved
|
04/15/2011
|
04/12/2011
|
|
Jim Eden
|
|
Address numbers required
Corrective Action Required
2006 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Action required: Post the address on the front and rear doors. Verified at inspection.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2006 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action required: Provide shop drawings for sprinkler alteration..
|
|
Construction documents for fire alarm systems
Corrective Action Required
2006 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action required: Provide shop drawings for alarm notification appliances.
|
|
Posting of occupant load
Corrective Action Required
2006 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
Verified at inspection.
|
|
Misc
Corrective Action Required
1008.1.8.5 Unlatching.
The unlatching of any door or leaf shall not require more than one operation.
Action required: A deadbolt lock shall not be used on the front door with panic hardware. Verified at inspection.
|
|
|
Zoning Review
|
Approved
|
04/15/2011
|
04/08/2011
|
|
Chris Hughey
|
|
|
Historical Preservation Review
|
Approved
|
04/15/2011
|
04/08/2011
|
|
Mike Weisenborn
|
|
|