Planning Application Status

PL2021475




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021475
Renourish
Commercial Final Development Plan
Commercial Final Development Plan
Approved
12/08/2021
RENOURISH LLC
Locations
Contacts
RENOURISH LLC, Address:102 SW 2ND ST  
MATT SCHLICHT, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Scott Ready, Phone: 8169691225  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Codes Review No Comments 04/20/2022 04/20/2022
Joe Frogge
Miscellaneous Correction
Resolved
04/20/2022

Show accessible route from parking to building entry. 3/24/22 - not addressed. accessible parking looks hemmed in by curbs. are there stairs/ramp into building?
Fire Review No Comments 04/20/2022 04/20/2022
Jim Eden
Engineering Review Approved with Conditions 04/20/2022 04/15/2022
Loic Nguinguiri, E.I.
DE Future Repair Work
Corrective Action Required
04/15/2022

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE C&O #11 Pavement Thickness
Corrective Action Required
04/15/2022

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
04/15/2022

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
04/15/2022

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $286.93
Traffic Review No Comments 04/20/2022 04/14/2022
Brad Cooley, P.E., RSPI
Planning Review No Comments 04/20/2022 04/14/2022
Shannon McGuire
Engineering Review Corrections 03/31/2022 03/31/2022
Loic Nguinguiri, E.I.
Corrective Action Required
03/31/2022

Sheet numbers shown, such as C.100 and C.101, don’t match with the index of sheets. Please revise.
Corrective Action Required
03/31/2022

A construction detail of the proposed retaining wall needs to be included in the set of plans. A design also has to be provided if the wall is higher than 4 feet tall.
Corrective Action Required
03/31/2022

Edges of proposed retaining walls must be at least 15 feet away from the existing 6” public water main.
Corrective Action Required
03/31/2022

Show proposed finish spot elevations, such as bottom/top of curb and finish grade elevations, over the new asphalt parking and curb area. Include arrows showing the direction of (runoff) flow, as well.
Corrective Action Required
03/31/2022

On sheet C.101, revise the concrete flume leader. A (shallow) curb cut at this location may be sufficient.
Corrective Action Required
03/31/2022

Provide the clarification for, or remove the bubbled “added 4” aggregate” shown on sheet C.600.
Traffic Review No Comments 03/31/2022 03/30/2022
Brad Cooley, P.E., RSPI
Fire Review No Comments 03/31/2022 03/30/2022
Jim Eden
Planning Review No Comments 03/31/2022 03/27/2022
Shannon McGuire
Building Codes Review Corrections 03/31/2022 03/24/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
03/24/2022

Show accessible route from parking to building entry. 3/24/22 - not addressed. accessible parking looks hemmed in by curbs. are there stairs/ramp into building?
Planning Review Corrections 02/22/2022 02/23/2022
Shannon McGuire
Corrective Action Required
02/23/2022

The approved PDP landscaping plan required parking lot screening of 12 shrubs per 40 linear feet to a height of two and one-half (2.5’) feet, be provided along the edge of the parking lot area parallel to the western property line. Please update the plans to meet this requirement.
Corrective Action Required
02/23/2022

All signs must comply with the sign requirements as outlined in the sign section of the ordinance.
Corrective Action Required
02/23/2022

Please provide a brief narrative of the proposed work to be complete on the exterior of the existing building.
Traffic Review No Comments 02/22/2022 02/17/2022
Susan Barry, P.E.
Engineering Review Corrections 02/22/2022 02/15/2022
Loic Nguinguiri, E.I.
Corrective Action Required
02/15/2022

Mention “Renourish”, with(in) the title on the cover sheet.
Corrective Action Required
02/15/2022

Title block information (i.e. sheet title & sheet number), shown throughout the set of plans, must match the information shown in the index of sheets located on the cover sheet.
Corrective Action Required
02/15/2022

Revise the bar scale(s), shown throughout the set of plans, as necessary. (i.e. 1” = 10’ appears to be the accurate one)
Corrective Action Required
02/15/2022

Show proposed temporary construction entrance on sheet C.051 or revise the language. The language shown on sheet C.051 should discuss the ESC measures to be used only, as part of this scope of work.
Corrective Action Required
02/15/2022

Include construction details for the two (2) proposed retaining walls.
Corrective Action Required
02/15/2022

Show proposed finish spot elevations over the new parking and curb area.
Corrective Action Required
02/15/2022

Specify the type(s) of curb and gutter to be used, on the site plan sheet. A curb cut (or a concrete flume) would also be needed between the rip-rap and the new asphalt pavement.
Corrective Action Required
02/15/2022

Should not an ADA ramp be installed for this development?
Corrective Action Required
02/15/2022

Show the proposed direction for the 1” PVC discharge pipe draining to daylight. Stormwater runoff from discharge pipe needs to drain towards the northwest corner of the lot.
Corrective Action Required
02/15/2022

Include the GEN-1, GEN-2 and GEN-4 standard details. ESC details are accessible through the Design & Construction manual tab located on the City’s website.
Corrective Action Required
02/15/2022

Please provide a stormwater management memorandum.
Corrective Action Required
02/15/2022

Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet
Building Codes Review Corrections 02/22/2022 02/10/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
02/10/2022

Show accessible route from parking to building entry.
Fire Review No Comments 02/22/2022 02/07/2022
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $725.00 $725.00 Paid 02/04/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
02/03/2022 Plans Renourish FDP 2-3-2022
02/04/2022 Receipt Receipt for transaction:2022-000625
02/07/2022 Application Form SKM_C36822020708480
02/23/2022 Letter Applicant Letter - FDP (DFDP)
03/24/2022 Plans RENOURISH FDP 3-24-2022
03/24/2022 Engineers Estimate COST ESTIMATE FDP 2022-3-21
10/05/2021 Letter STORM MEMO 211005
03/31/2022 Letter Applicant Letter - FDP (DFDP)
04/13/2022 Plans RENOURISH FDP 4-13-2022
04/13/2022 Letter COMMENT RESPONSE STREET AND STORM 4-13-2022
04/13/2022 Engineers Estimate COST ESTIMATE FDP 2022-4-13
04/15/2022 Activity Document CV Fee Worksheet PL2021-475
04/21/2022 Letter Applicant Letter - FDP (DFDP)
04/21/2022 Approved Plans FDP Approved_042122_RENOURISH FDP 4-13-2022
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home