Review Type |
Outcome |
Est. Completion Date |
Completed |
Traffic Review
|
Approved with Conditions
|
12/21/2018
|
01/19/2018
|
|
Gene Williams, P.E.
|
|
|
Engineering Review
|
Approved with Conditions
|
12/21/2018
|
01/19/2018
|
|
Gene Williams, P.E.
|
|
|
Engineering Review
|
Corrections
|
10/03/2017
|
10/02/2017
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
An erosion and sediment control plan appeared to be missing.
|
|
Corrective Action Required
Driveways impacted by this project should be replaced with KCMMB concrete from the roadway, to the right of way line.
|
|
Corrective Action Required
The minimum size driveway culvert is 15". If using CMP, it should be aluminized.
|
|
Corrective Action Required
Sheet C317: KCMMB concrete mix should be specified for the driveway typical section.
|
|
|
Traffic Review
|
Corrections
|
10/03/2017
|
10/02/2017
|
|
Michael Park
|
|
Corrective Action Required
Sheet C303. Typical Road Sections are inconsisent with the Saw Cut/Mill & Overlay detail.
|
|
Corrective Action Required
Is the existing manhole structure and lid near Station 29+40 (Note for Contractor to Raise Lid 0.56') traffic rated?
|
|
Corrective Action Required
Sheet C305. Detour Plan is incomplete and not efficient (consideration of northbound traffic is lacking north of M-150, use of Scherer Road should be signed, the signing for traffic south of M-150 can be minimized/relocated, etc.). Use of M-150 as detour route requires MoDOT permitting and review. Hook Road west of Pryor Road should not be part of the detour route.
|
|
Corrective Action Required
Sheet C306. Use consistent scale on a roadway plan across match lines.
|
|
Corrective Action Required
Plan sheets generally lack complete details, dimensions, stations/offsets for construction, inspection and record drawings.
|
|
Corrective Action Required
Driveway culverts do not align with ditch sections.
|
|
Corrective Action Required
Driveways require at least 50' depth of hard surface from edge of pavement per ordinances. Where this condition exceeds right-of-way or ability to acquire temporary construction easement, a waiver may be considered.
|
|
Corrective Action Required
Are the locations of mail boxes (relocated) adjacent to the properties addressed? Has this issue been coordinated with the postal service and their (as well as property owner) preference been accommodated? It's possible some of these mail boxes may be relocated across the street if better/safer access can be provided.
|
|
Corrective Action Required
Pavement Marking Sheets. The diagonal lines between Arbor Valley Dr and Arborridge Drive are in the wrong direction.
|
|
Corrective Action Required
Pavement Marking Sheets. Pavement markings for the right-turn lanes and left-turn lanes are missing.
|
|
Corrective Action Required
Signing Sheets. The R3-8 lane use signs should be removed.
|
|
|