Summary
PL2025343
Discovery Beach Club
Commercial Final Development Plan
Commercial Final Development Plan
In Plan Review
12/31/2025
New Clubhouse Facility
Locations
Contacts
Brian Maenner - Intrinsic Development, Address:3622 Endeavor Ave., Ste. 101, Phone:(573) 881-0280  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Corrections 03/17/2026 03/17/2026
Susan Nelson, P.E.
Corrective Action Required
03/17/2026

Submit a SWPPP specific to this project with appropriate signature blocks completed.
Corrective Action Required
03/17/2026

The trench drain between the two pools will likely accept chlorinated or otherwise treated pool water and this may not drain to any part of the public storm sewer system.
Corrective Action Required
03/17/2026

Add a typical section that depicts the composition of the proposed retaining wall.
Corrective Action Required
03/17/2026

Add a note that states that the domestic water connection is made by a corporation stop.
Planning Review Corrections 03/17/2026 03/16/2026
Hector Soto Jr.
Corrective Action Required
03/16/2026

EASEMENTS. The plan set shows some sort of retaining/landscape wall sign at the southeast corner of the site. Said sign structure encroaches into an existing sanitary sewer easement and is shown to be built over a sanitary sewer line. The City's encroachment policy prohibits the encroachment of a retaining/landscaping wall into an easement, nor within 15' from the nearest outside edge of a sanitary sewer line. The response to the previously made comment above is that the developer acknowledges the encroachment and takes responsibility for any damage. However, the City's policy is that no structures such as landscaping or retaining walls are allowed to encroach into a public easement, thus the proposed wall must be relocated out of the easement. Should you want further discussion regarding the Public Works Department's Encroachment Policy, please reach out to your assigned Project Manager to coordinate said discussion.
Corrective Action Required
03/16/2026

LIGHTING. 1) As previously commented, provide manufacturer specifications for all proposed exterior light fixtures for review and approval. 2) No information is provided on the photometric plan regarding the proposed pole light fixture height(s). Light pole fixtures within 100' of residential uses is limited to 15' above grade; light pole fixtures greater than 100' from residential uses is limited to 20' above grade.
Corrective Action Required
03/16/2026

MECHANICAL EQUIPMENT. It does not appear from the FDP that any exterior mechanical equipment is being employed with the proposed improvements. Should any exterior equipment be needed, said mechanical equipment shall be fully screened from view in accordance with UDO Sections 8.110.B and 8.110.C and confirmed at the time of occupancy inspection.
Corrective Action Required
03/16/2026

FORM 7460. An FAA Form 7460 shall be completed and submitted to the FAA, and comments received back prior to the issuance of any building permits.
Building Codes Review Approved with Conditions 03/17/2026 03/16/2026
Joe Frogge
Miscellaneous Correction
Corrective Action Required
03/10/2026

Pool and pool house plans are not part of this review. Action required: Comment is informational. 3/16/2026 - Acknowledged in letter.
Miscellaneous Correction
Resolved
03/16/2026

Water service piping from main to meter and 10' past meter must be 2" copper.
Miscellaneous Correction
Resolved
03/16/2026

Specify size of sanitary sewer piping.
Miscellaneous Correction
Corrective Action Required
03/10/2026

Provide complete designs for retaining wall. 3/16/2026 - Deferred per request.
Fire Review Corrections 03/17/2026 03/12/2026
Jim Eden
Code Statement
Corrective Action Required
03/10/2026

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Corrective Action Required
03/10/2026

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Show the location of the hydrant.
Planning Review Corrections 01/14/2026 01/14/2026
Hector Soto Jr.
Corrective Action Required
01/14/2026

LEGAL DESCRIPTION. 1) The legal description on Sheet C001 is incorrect. The current plat of record for the site is "Discovery Park, Lot 9-1 and Tract A-1". The subject project site is Tract A-1 of said plat. 2) Some of the proposed improvements extend outside of Tract A-1 and onto the following abutting lots: Lot 10, Village at Discovery Park; and Lot 1, Alura 1st Plat. The proposed improvements cannot cross established lot lines, thus a replat of the affected properties is required so that the common property improvements are contained within the boundaries of a single common area tract. 3) Revise the legal description as needed to reflect the extent of the project site boundaries.
Corrective Action Required
01/14/2026

SITE DATA TABLE. Add a site data table that includes the following information: Site/Lot Area (in both sq. ft. and acres); Building Floor Area (in sq. ft.); Impervious Coverage (in sq. ft., acres, and expressed as a percentage of the site area; Pervious/Open Area (in sq. ft., acres and expressed as a percentage of the site area)
Corrective Action Required
01/14/2026

STREETS/PRIVATE DRIVE. Dimension the width of the private drive and the tract that contains the private drive that provides access to the site along the east boundary.
Corrective Action Required
01/14/2026

EASEMENTS. The plan set shows some sort of retaining/landscape wall sign at the southeast corner of the site. Said sign structure encroaches into an existing sanitary sewer easement and is shown to be built over a sanitary sewer line. The City's encroachment policy prohibits the encroachment of a retaining/landscaping wall into an easement, nor within 15' from the nearest outside edge of a sanitary sewer line.
Corrective Action Required
01/14/2026

SIDEWALKS. Construction of the sidewalk along the private street/drive along the site's eastern frontage shall be constructed as part of the subject development, if not already existing.
Corrective Action Required
01/14/2026

RECREATIONAL FACILITY REQUIREMENTS. The proposed pickleball courts are subject to the use conditions under UDO Section 6.1350.N, inclusive of the following: 1) Courts and fields for one- or two-person teams shall be set back at least 50 feet from the property line for the abutting apartment development to the north; 2) A fence more than six feet in height shall be set back from the abutting apartment development boundaries the north a distance equal to the height of the fence; 3) It shall not be lighted for night use; and 4) The design and layout of the recreational facility on the property shall be such that it minimizes sound and light at the property line. At the time the application was submitted and approved for Discover Park - Zone 1 (that included the subject site), the subject amenity area was only shown as the site for a swimming pool area. No pickleball or other type of recreational athletic court was proposed by the applicant for the amenity area at that time, therefore the aforementioned athletic court regulations did not apply at time time. The athletic court regulations are now triggered with the proposed pickleball courts.
Corrective Action Required
01/14/2026

LIGHTING. Provide a photometric plan for the amenity area that complies with the requirements of UDO Section 8.230. Proposed exterior light fixtures shall comply with the requirements of UDO Sections 8.220, 8.260 and 8.270. Provide manufacturer specifications for all proposed exterior light fixtures for review.
Corrective Action Required
01/14/2026

MECHANICAL EQUIPMENT. Will any mechanical equipment be housed outside the utility/pool equipment or storage rooms (e.g., HVAC condensers, etc.)? If so, show the location of any exterior mechanical equipment on the site plan (for any ground-mounted units) or building elevations (for any RTUs). Mechanical equipment shall be fully screened from view in accordance with UDO Sections 8.110.B and 8.110.C.
Corrective Action Required
01/14/2026

LANDSCAPE PLAN. The landscape plan shows proposed evergreen trees being of a height of 6' at the time of planting. To comply with City ordinance, evergreen trees shall be a minimum 8' in height at the time of planting. Revise.
Corrective Action Required
01/14/2026

FORM 7460. An FAA Form 7460 shall be completed and submitted to the FAA, and comments received back prior to any construction.
Building Codes Review Corrections 01/14/2026 01/14/2026
Joe Frogge
Miscellaneous Correction
Corrective Action Required
01/14/2026

Pool and pool house plans are not part of this review. Action required: Comment is informational.
Miscellaneous Correction
Corrective Action Required
01/14/2026

Water service piping from main to meter and 10' past meter must be 2" copper.
Miscellaneous Correction
Corrective Action Required
01/14/2026

Specify size of sanitary sewer piping.
Miscellaneous Correction
Corrective Action Required
01/14/2026

Provide complete designs for retaining wall.
Engineering Review Corrections 01/14/2026 01/14/2026
Susan Nelson, P.E.
Corrective Action Required
01/14/2026

Submit an Engineer's Estimate of Probable Construction Costs and the SWPPP.
Corrective Action Required
01/14/2026

Submit a storm water memo specific to this project. Add drainage maps, calculations, and storm pipe profiles to the plans. Please be aware that the trench drains shown may not connect to the storm sewer.
Corrective Action Required
01/14/2026

Add a note to the plans stating: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.”
Corrective Action Required
01/14/2026

Make sure that the trail is located on the flat area of the embankment, adjust as necessary. Add elevations where there are placeholders (???). Provide slope and cross slope information for the trail.
Corrective Action Required
01/14/2026

Provide a complete plan for ADA-accessible sidewalks and curb ramps. Ensure that all elevation callouts, running slope callouts, and cross-slope points are shown. Show existing sidewalk information for the transition areas where the proposed sidewalk joins the existing sidewalk facilities. Add City standard details for sidewalks and ramps.
Corrective Action Required
01/14/2026

Show the limits of the retaining walls more clearly. Add the retaining wall details to the plans. The complete sealed retaining wall plans, if not contained within these plans, must be submitted prior to construction of the walls.
Corrective Action Required
01/14/2026

Show all existing easements with documentation on the plans. Remove any vacated easements. Provide the sizes of the existing water and sanitary sewer lines.
Corrective Action Required
01/14/2026

Add a note that the domestic water main connection is by corporation stop. Show soft type “K” copper service line (diameter in accordance with the City standard details) shall extend a minimum of 10 feet beyond the meter well (between the meter and the private customer) (LS 6901 K. Service Lines).
Corrective Action Required
01/14/2026

Show and label the sanitary sewer connection as a cut-in wye. Label the existing sanitary manholes with the City numbering system.
Corrective Action Required
01/14/2026

Please be aware that the proposed putting green is located over the sanitary sewer and storm sewer easements with infrastructure buried beneath. If future issues with this infrastructure occur and the putting green is disturbed, the City will not be responsible for replacing the putting green and the owner is assuming this risk.
Fire Review Corrections 01/14/2026 01/12/2026
Jim Eden
Code Statement
Informational
03/12/2026

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Corrective Action Required
01/12/2026

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Show the location of the hydrant on Alura Ct.
Traffic Review No Comments 01/14/2026 01/05/2026
Erin Ralovo
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $1,200.00 $1,200.00 Paid 01/15/2026
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
12/31/2025 Plans Sheet C001_PL2025343_Rev 0
12/31/2025 Application Form FDP Application_PL2025343
12/31/2025 Plans FDP Plan Set_Rev0_PL2025343
12/31/2025 Plans Elevations and Floor Plan_PL2025343
12/31/2025 Plans Color Elevations_PL22025343
12/31/2025 Application Form Ownership Affidavit_PL2025343
12/31/2025 Application Form Application_PL2025343
12/31/2025 Plans Landscape Plan_Rev0_PL2025343
01/14/2026 Letter Applicant Letter - FDP_PL2025343
01/15/2026 Receipt Receipt_PL2025343
03/10/2026 Engineer Report/Study Stormwater Plan_Rev0_PL2025343
03/10/2026 Plans FDP Plan Set_Rev1_PL2025343
03/10/2026 Engineers Estimate Engineer's Cost Estimate_Rev0_PL2025343
03/10/2026 Letter Response Letter_PL2025343
03/10/2026 Engineer Report/Study Stormwater Memo_Rev0_PL2025343
03/10/2026 Plans Landscape Plan_Rev1_PL2025343
03/10/2026 Letter MDNR Letter_PL2025343
03/12/2026 Plans Photometric Plan_PL2025343
03/17/2026 Letter Applicant Letter - FDP (DFDP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home