Planning Application Status

PL2025277




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2025277
Les Schwab Tire Center
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
In Plan Review
10/09/2025
WSO PARTNERS LLC
6-bay retail tire service store
Locations
Contacts
LAMP RYNEARSON, Address:9001 STATE LINE RD STE 200, Phone:(402) 496-2498  
WSO PARTNERS LLC, Address:1000 PROGRESS DR UNIT 299  
SFP-E, LLC, Address:20900 Cooley Rd, Phone:(541) 416-5629  
Dan McGhee, Address:9001 State Line Rd, Phone:(816) 823-7239  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Approved with Conditions 11/18/2025 11/12/2025
Jim Eden
Code Statement
Informational
11/12/2025

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Engineering Review Approved with Conditions 11/18/2025 11/10/2025
Susan Nelson, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
11/07/2025

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
11/07/2025

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #06 Land Disturbance
Corrective Action Required
11/07/2025

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #09 FDP Reviews
Corrective Action Required
11/07/2025

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
11/07/2025

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Future Repair Work
Corrective Action Required
11/10/2025

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Corrective Action Required
11/10/2025

For informational purposes only: Please be aware of the improvements that were completed within the Summit Fair, Lot 10C Site Development Plans (Project Number - PL2024063) that were released for construction on 5/15/25. The Final Development Plans will need to accurately show the existing conditions and how those improvements will be modified for the permanent build.
Planning Review Corrections 11/18/2025 11/07/2025
Adair Bright
Miscellaneous Correction
Corrective Action Required
11/07/2025

Please provide a comment response letter addressing the following requested revisions.
Miscellaneous Correction
Corrective Action Required
11/07/2025

Sheet 1 - Per UDO Sec. 8.620.E.4, drive aisle widths shall not include the curb and gutter. Please revise drive aisle dimensions to reflect this. Minimum drive aisle width is 24-ft.
Miscellaneous Correction
Corrective Action Required
11/07/2025

Sheet E003 - Per UDO Sec. 8.250.D.1, the maximum light pole height is 15-ft., including the base, when within 100-ft. of a residential use. A few light poles will need to be requested or an additional modification will need to be sought and reflected in the modification request letter.
Miscellaneous Correction
Corrective Action Required
11/07/2025

Sheet E003 - Per UDO Sec. 8.250.E, the maximum footcandle adjoining a residential property line shall be 0.5 footcandles. There are just a few in the northwest corner that exceed that 0.5 maximum. A few light poles will need to be requested or an additional modification will need to be sought and reflected in the modification request letter.
Planning Review Corrections 10/24/2025 10/24/2025
Adair Bright
Miscellaneous Correction
Corrective Action Required
10/24/2025

Please provide a comment response letter addressing the following requested revisions.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Sheet 1 - Under the Building Summary Table what is "approved not shown" in reference to?
Miscellaneous Correction
Corrective Action Required
10/24/2025

Sheet 1 - Provide the building setback to the southern property line.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Sheet 1 - Confirm all parking stalls are a minimum 9-ft. in width excluding the curb.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Sheet 1 - Provide a legend or note for the different paving types.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Sheet 1 - Provide parking lot setbacks. UDO Sec. 8.620.B requires a minimum 20-ft. setback from public right-of-way.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Sheet 4 - Perimeter landscaping shall include both deciduous and coniferous trees to help provide year round buffering. Please revise the landscape plan to include evergreen trees.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Elevations - Include additional labels to address which direction the facades face (i.e., north elevation, south elevation).
Miscellaneous Correction
Corrective Action Required
10/24/2025

Elevations - Dash in the height of any roof-mounted equipment.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Elevations - Per UDO Sec. 8.080.B, commercial/retail buildings must include 3 different Class 1 and 2 materials that comprise as least 50% of the primary facade(s). Note which materials are meeting that requirement and the percentage of the facade those materials occupy. The material classification table is located in UDO Sec. 8.060. Primary facades are street-facing facades. For the proposed development that would be the east and west facades.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Elevations, Material Legend - Provide information on the glass (clear, tinted, spandrel, etc.).
Miscellaneous Correction
Corrective Action Required
10/24/2025

Elevations, Material Legend - Provide more detail on the metal proposed to be used. Non-insulated metal siding and panels is considered a Class 4 material which is prohibited on this building type.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Elevations, Material Legend - Provide information about the roofing material. Only Class 1, 2, or 3 materials are allowed.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Elevations, Wall Articulation - Per UDO Sec. 8.080.B, primary facades are required to have an articulation no less than once every 60 linear feet. Wall articulations include, but are not limited to, projections or recesses in the wall plane of at least 2 feet in depth or the use of columns, piers, or equivalent structural or decorative elements that project at least 2 feet beyond the wall plane. Confirm the requirement is being met for the east and west facades and provide information detailing that.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Elevations, Fenestration - Per UDO Sec. 8.050.B.4.i, all commercial and retail building facades that face a public or private street shall have fenestrations with clear glass that occupy no less than 50% of the pedestrian view zone. The pedestrian view zone is defined as the 8-foot-tall area of the subject building's primary façade(s) that is between two feet and ten feet above the adjacent sidewalk or ground level. I understand the intent of the code is being met through the transom windows; however, we do need a modification request letter outlining the UDO requirement, the proposed modification, and the justification.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Misc. - Confirm all ground-mounted and building-mounted equipment will be screened.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Misc. - Per UDO Sec. 2.310, Preliminary Development Plan application contents shall include proposed exterior lighting, including parking lot lights and wall-mounted fixtures, including fixture type, location, height and intensity. Also, manufacturer's specification sheets shall be submitted. This can be deferred to the Final Development Plan. Please note when this information will be received.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Misc. - Please remove the floor plan and the FF&E sheets from the plan set.
Miscellaneous Correction
Corrective Action Required
10/24/2025

Misc. - If you have photos or examples of existing buildings that will be utilizing the same materials or design, it could be helpful to provide since the texture of the materials don't always show through via elevations.
Engineering Review Approved with Conditions 10/24/2025 10/22/2025
Susan Nelson, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
10/22/2025

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
10/22/2025

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #06 Land Disturbance
Corrective Action Required
10/22/2025

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #09 FDP Reviews
Corrective Action Required
10/22/2025

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
10/22/2025

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Future Repair Work
Corrective Action Required
10/22/2025

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Corrective Action Required
10/22/2025

For informational purposes only: Please be aware of the improvements that were completed within the Summit Fair, Lot 10C Site Development Plans (Project Number - PL2024063) that were released for construction on 5/15/25. The Final Development Plans will need to accurately show the existing conditions and how those improvements will be modified for the permanent build.
Traffic Review No Comments 10/24/2025 10/20/2025
Erin Ralovo
Fire Review Approved with Conditions 10/24/2025 10/16/2025
Jim Eden
Code Statement
Corrective Action Required
10/24/2025

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fees
Paid Fees Amount Paid Owing Date Paid
Commercial Preliminary Development Plan fee $2,175.00 $2,175.00 Paid 10/24/2025
Legal Notice Publishing Charge $165.00 $165.00 Paid 10/24/2025
Legal Notice Publishing Charge $165.00 $165.00 Paid 10/24/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
10/10/2025 Application Form Application Form_PL2025277
10/10/2025 Plans Plan set_Rev 0_PL2025277
10/10/2025 Engineer Report/Study Stormwater Memo_Rev 0_PL2025277
10/10/2025 Engineer Report/Study Traffic Memo_Rev 0_PL2025277
10/20/2025 Public Notice Document Notification list_Les Schwab_PL2025277
10/24/2025 Letter Applicant Letter_Rev 0_PL2025277
10/24/2025 Receipt Receipt_PL2025277
11/07/2025 Plans Full Plan Set_Rev 1_PL2025277
11/07/2025 Letter Response Letter_Rev 1_PL2025277
11/07/2025 Waiver/Modification Document Modification Request Letter_Rev 1_PL2025277
11/07/2025 Public Notice Document Neighborhood Meeting Documentation_Rev 1_PL2025277
11/10/2025 Full Plan Set_Rev 2_PL2025277
11/10/2025 2025_11_10 LSTC PDP Response Letter
11/10/2025 Response Letter_Rev 2_PL2025277
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents