100 NE Douglas conversion
Commercial Final Development Plan
Commercial Final Development Plan
In Plan Review
07/09/2025
SMITH ANTHONY E & JENNIFER E
Conversion of a single-family home into a business office. Parking lot addition and detention
Locations
Contacts
SMITH ANTHONY E & JENNIFER E, Address:100 NE DOUGLAS ST  
Engineering Solutions, Address:50 SE 30th St, Phone:(816) 623-9888  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Codes Review No Comments 07/23/2025 07/23/2025
Joe Frogge
Engineering Review Corrections 07/23/2025 07/22/2025
Susan Nelson, P.E.
Corrective Action Required
07/22/2025

Please incorporate into the plans the permanent sidewalk/utility easements and temporary construction easements recently obtained for the City’s CIP roadway project. This has been provided to the designer by separate document.
Corrective Action Required
07/22/2025

The landscape plan must be amended to better coordinate with the CIP roadway project. No new trees or shrubs should not be planted in the areas needed for permanent or temporary easements. The submitted landscape plan shows larger caliper trees proposed withing the new permanent 10’ utility easement which will not be allowed. Please verify and note on the plans that only ornamental trees and shrubs may be planted within any easement.
Corrective Action Required
07/22/2025

Show in the pavement sections and add the following notes to the plans regarding paving per Section 2200 of the City Design and Construction Manual. Note that the minimum surface course thickness for KCMMB asphalt is 2 inches and the Unified Development Ordinance Section 8.620 – Parking Lot Design will still govern for overall thickness requirements. - All asphalt materials shall conform to the KCMMB ASPHALT MATERIAL SPECIFICATION, current edition. - All concrete materials for paving curb and gutter, sidewalks, paths, commercial driveways and other pavements in the right of way shall conform to the KCMMB specifications.
Corrective Action Required
07/22/2025

Add City Standard Details for curb/gutter and sidewalks/ramps.
Corrective Action Required
07/22/2025

Add site specific ADA design information for the sidewalk/ramps, including access to the building and through the proposed driveway.
Corrective Action Required
07/22/2025

Submit an Engineer's Estimate of Probable Construction Costs and the SWPPP.
Corrective Action Required
07/22/2025

Detention plan, profile and detail conflict, please reconcile. Show trees removed from detention basin. Show that the end section treatment can withstand the shear stress of the discharge velocities. Add a detail for the flume from the parking lot to the detention basin.
Corrective Action Required
07/22/2025

The Storm Water Memorandum provides conflicting information on whether the design meets or does not meet the City and APWA 5600 requirements, please revise.
Planning Review Corrections 07/23/2025 07/22/2025
Adair Bright
Corrective Action Required
07/14/2025

Sheet C.001: Update zoning to TNZ and remove proposed zoning.
Corrective Action Required
07/14/2025

Sheet C.101: Provide further information on the flattened curb for the ADA route (full dimension of the flattened curb, will all other curbs be standard curbs, etc.).
Corrective Action Required
07/14/2025

Sheet L.100: Show which existing trees will be removed.
Corrective Action Required
07/14/2025

Sheet L.100: Given discussions at Planning Commission concerning landscaping and screening of the parking lot, replace some of the shrubs adjacent to the parking on the west with evergreens.
Corrective Action Required
07/14/2025

Sheet L.100: Switch out the trees along the perimeter for ornamental trees.
Corrective Action Required
07/14/2025

Is any additional lighting proposed? If so, provide a photometric plan.
Corrective Action Required
07/14/2025

Sheet C.101: Show and label sight triangles.
Corrective Action Required
07/14/2025

Sheet C.101: Provide setbacks to the deck.
Corrective Action Required
07/22/2025

Provide manufacturer specifications for the proposed decking and railing along with elevations for the deck area.
Corrective Action Required
07/22/2025

The sidewalk wrapping all around the building was not shown in the PDP, is that just desired by the property owner for full circulation?
Corrective Action Required
07/22/2025

A minor plat will be required. When will this be submitted?
Corrective Action Required
07/22/2025

Sheet L.100: Replace all invasive species with a non-invasice species (the burning bush shrub).
Traffic Review No Comments 07/23/2025 07/18/2025
Erin Ralovo
Fire Review Approved with Conditions 07/23/2025 07/15/2025
Jim Eden
Code Statement
Corrective Action Required
07/15/2025

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid
Final Development Plan fee $725.00 $0.00 $725.00 Not Paid


$725.00    Add Fees to My Cart
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
07/09/2025 Plans Plan set_Rev 0_PL2025176
07/09/2025 Engineer Report/Study Storm Study_Rev 0_PL2025176
07/10/2025 Application Form Application form_signed_PL2025176
07/23/2025 Letter Applicant Letter - FDP (DFDP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home