Planning Application Status

PL2025056




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2025056
Lawn & Leisure of Lee's Summit
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
Capital Improvement Plan
Commercial Preliminary Development Plan
Commercial Final Development Plan
Commercial Preliminary Development Plan
Approved
03/12/2025
KRAFT THOMAS ANTHONY-TRUSTEE
Display and Parking Area
Locations
Contacts
KRAFT THOMAS ANTHONY-TRUSTEE, Address:706 SE BLUE PKWY  
Steve Kraft, Address:706 SE Blue Pkwy, Phone:(816) 524-6695 Ext:229  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 03/28/2025 03/31/2025
Hector Soto Jr.
Fire Review Approved with Conditions 03/28/2025 03/26/2025
Jim Eden
Knox Locks
Corrective Action Required
03/25/2025

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Gates shall have Knox padlocks.
Traffic Review No Comments 03/28/2025 03/24/2025
Erin Ralovo
Engineering Review Approved with Conditions 03/28/2025 03/19/2025
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
03/19/2025

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
03/19/2025

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
03/19/2025

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
03/19/2025

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 04/10/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 04/10/2025 5:00 PM Council Chambers 04/10/2025 05:00 PM
Agenda Item
Approved
04/10/2025
Documents & Images
Date Uploaded File Type Document Name
03/12/2025 Plans Site Plan_Rev 0_PL2025056
03/14/2025 Application Form Application and Affidavit_PL2025056
03/31/2025 Letter Applicant Letter_PL2025056
04/01/2025 Drawing Location Map_PL2025056
04/04/2025 Letter Staff Report_PL2025056
04/10/2025 Receipt Receipt_PL2025056
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home