Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
Corrections
|
04/04/2025
|
04/04/2025
|
|
Hector Soto Jr.
|
|
Corrective Action Required
SIDEWALKS. 1) The 10'-wide shared use path shall be extended along the development's entire NW/NE Colbern Rd frontage. 2) Label and dimension the 10'-wide shared use path.
|
|
Corrective Action Required
SIDEWALK EASEMENT. Based on comments from our Development Engineering group, it appears that additional ROW width will be required to be dedicated as part of this plat so that the entirety of the 10'-wide shared use path resides within the ROW and thus not require the path to encroach onto private property. Following this approach, there will be no need for the dedication of a sidewalk easement and therefore needs to be removed from the plat.
|
|
Corrective Action Required
STREET NAMES. 1) Correct the street name prefixes for Discovery Ave and Trails Edge Blvd from SE to NE. 2) Correct the quadrant prefix for the existing Colbern Rd street name label above Lot 4 from NW to NE. 3) Add a second street name label for Colbern Rd above Lot 9 that reads NW Colbern Rd. 4) Correct the street name spelling in the Access Restriction note. The correct street name spelling is "Colbern", not "Colburn".
|
|
Corrective Action Required
BUILDING SETBACK LINES. Show, label and dimension 15' front setbacks lines for all proposed lots.
|
|
Corrective Action Required
EASEMENTS. It doesn't appear that any utility easements are proposed to be dedicated to serve Lots 6-8. There is a call-out for an existing general utility easement along the frontage of Lots 1-5, but it isn't clear if it extends onto Lot 9. Clearly shown and call out all proposed utility easements to be dedicated as part of the subject plat.
|
|
Corrective Action Required
COMMON AREA. A copy of the CC&Rs for the development shall be provided to review for compliance with the common area requirements of UDO Section 4.290. The subject plat will not be released for recording until such time as staff reviews and approves the CC&Rs for compliance with said common area requirements.
|
|
Corrective Action Required
CITY SIGNATURE BLOCKS. 1) The approval language above the City signature block is missing the last part. Revise the language so the end reads as follows: "...Lee's Summit, Missouri, this [insert a blank] day of [insert a blank], 20[insert a blank] by Ordinance No. [insert a blank]. 2) The plat name listed in the plat approval language is incomplete. It reads Discovery Crossing instead of Discovery Park Crossing. Revise. 3) Correct the spelling of the first name of the Deputy Director of Development Services. The correct spelling of her first name is Aimee. 4) A new Planning Commission Secretary was recently appointed. Replace the name of Terry Trafton with the name of Charles E. Touzinsky, III.
|
|
Corrective Action Required
CROSS-ACCESS. 1) Add a cross-access dedication note establishing an access easement over all of Tract A (the private streets) to ensure perpetual public access between Tract A and all of Lots 1-9. 2) An access easement shall be provided and dedicated to allow the property owners association perpetual access to Tract B across Lot 7 and/or 8.
|
|
Corrective Action Required
ADDRESSES. Addresses for the proposed lots and tracts will be provided under separate cover once finalized.
|
|
|
Fire Review
|
No Comments
|
04/04/2025
|
04/04/2025
|
|
Jim Eden
|
|
Corrective Action Required
Correct the quadrants on the street names to NE.
|
|
|
Traffic Review
|
No Comments
|
04/04/2025
|
04/04/2025
|
|
Erin Ralovo
|
|
|
Engineering Review
|
Corrections
|
04/04/2025
|
04/03/2025
|
|
Susan Nelson, P.E.
|
|
Corrective Action Required
As previously mentioned, this plat requires coordination with the City roadway project. The following comments have not been adequately addressed, please revise and resubmit.
|
|
Corrective Action Required
Right-of-way and utility easements must be modified along Colbern Rd. to accommodate the widening for the added turn lanes and shared-use path. Show and label all right-of-way and utility easements (existing and proposed) with appropriate documentation throughout the entire plat both along Colbern Rd. and Douglas St.
|
|
Corrective Action Required
The new right-of-way should extend one foot beyond the 10-foot-wide shared use path. The utility easement should extend a minimum of 10 feet beyond the new right-of-way.
|
|
Corrective Action Required
Incorporate these right-of-way and utility easement additions throughout all development plan sets. Be sure that all linework is clearly labeled to identify what is being represented.
|
|
|
GIS Plat Review
|
No Comments
|
04/04/2025
|
03/31/2025
|
|
Kathy Kraemer
|
|
|
Fire Review
|
Corrections
|
01/24/2025
|
01/24/2025
|
|
Jim Eden
|
|
Corrective Action Required
Correct the quadrants on the street names to NE.
|
|
|
Planning Review
|
Corrections
|
01/24/2025
|
01/23/2025
|
|
Hector Soto Jr.
|
|
Corrective Action Required
PLAT TITLE. 1) To follow the City's naming conventions, add the lot numbers and tract letters to the plat title so it reads, "Discovery Park Crossing, Lots 1-9 and Tracts A & B". Revise all references to the plat title throughout the document as necessary to reflect the full plat title. 2) The plat drawing currently references an incorrect plat title of "Discovery Park, Lot 9-1 and Tract A-1" in the plat dedication paragraph and in the approval language above the City signature block.
|
|
Corrective Action Required
LOT LINE INFORMATION. 1) Revise the labeled dimension for the western segment of Lot 2's northern property line. It is labeled as 164.04', but scales as approximately 178'-4". 2) Label the western segment of Lot 1's northern property line. It scales as approximately 47'-6". 3) See additional property line information comments from the City's GIS Dept review contained in this letter.
|
|
Corrective Action Required
SIDEWALKS. 1) Add a 10'-wide shared use path along the development's entire NW/NE Colbern Rd frontage. 2) As commented upon during the related Discovery Crossing rezoning and preliminary development plan application process, City ordinance requires that sidewalks be constructed along both sides off all non-residential streets. This requirement applies to the subject development's NE Douglas St frontage. But as addressed in the staff report for the Discovery Crossing rezoning and preliminary development plan application that went before the Planning Commission and City Council, staff recommends that the developer make
payment in lieu of constructing the required sidewalk, as allowed under UDO Section 7.370, due to the fact
that pedestrians going to/coming from the south along NE Douglas St can only cross over I-470 by using the
sidewalk along the east side the NE Douglas St overpass because the overpass is not designed to accommodate a sidewalk on both sides of the bridge. See UDO Section 7.370.C for the requirements to submit a written request to the Director of Development Services for payment in lieu of construction.
|
|
Corrective Action Required
SIDEWALK EASEMENT. A sidewalk easement shall be dedicated on the plat to cover the portions of the public sidewalk/shared use path along NW/NE Colbern Rd that will encroach onto the abutting lots due to the presence of the turn lanes. The following Sidewalk Easement dedication language shall be added to the plat: "A permanent easement is hereby granted to the City of Lee's Summit to locate, construct and maintain or to authorize the location, construction and maintenance of a sidewalk for pedestrian access over, along and across the strips of land designated as "SIDEWALK EASEMENT" or by the abbreviation "S/E" on the accompaning plat."
|
|
Corrective Action Required
STREET NAMES. 1) Correct the street name prefixes for Discovery Ave and Trails Edge Blvd from SE to NE. 2) Add a street name label of "NW Annie Way" for the private street segment west of the Trails Edge Blvd intersection. Trails Edge Blvd is the dividing line between the NW and NE addressing quadrants, so the segment of NE Annie Way east of the Trails Edge Blvd intersection is correctly labeled as currently shown.
|
|
Corrective Action Required
RIGHT-OF-WAY. Label the right-of-way widths for NW Colbern Rd, NE Douglas St and I-470. Variable width ROW can be labeled as such.
|
|
Corrective Action Required
BUILDING SETBACK LINES. 1) Show, label and dimension 15' front setbacks lines for all proposed lots. 2) Add the City's standard building line dedication paragraph. Staff can provide the language upon request.
|
|
Corrective Action Required
EASEMENTS. It doesn't appear that any utility easements are proposed to be dedicated to serve Lots 6-8. There is a call-out for an existing general utility easement along the frontage of Lots 1-5, but it isn't clear if it extends onto Lot 9. Clearly shown and call out all proposed utility easements to be dedicated as part of the subject plat.
|
|
Corrective Action Required
COMMON AREA. 1) Revise the common area dedication paragraph to state that ownership and maintenance responsibilities of Tracts A & B are dedicated to the property owners association. 2) A copy of the CC&Rs for the development shall be provided to review for compliance with the common area requirements of UDO Section 4.290. The subject plat will not be released for recording until such time as staff reviews and approves the CC&Rs for compliance with said common area requirements.
|
|
Corrective Action Required
CITY SIGNATURE BLOCKS. 1) The approval language above the City signature block is that of a minor plat, not a final plat. Replace said language with the City's standard approval language for a final plat. 2) Replace the name and title of Joshua Johnson, AICP with the name and title of Aimee Nassif, AICP, Deputy Director of Development Services. 3) Add a signature line for William A. Baird, Mayor. 4) Add a signature line for Terry Trafton, Planning Commission Secretary.
|
|
Corrective Action Required
PROPERTY OWNER SIGNATURE BLOCK. Update the year listed in the property owner and notary certification paragraphs from 2024 to 2025.
|
|
Corrective Action Required
CROSS-ACCESS. 1) Add a cross-access dedication note establishing an access easement over all of Tract A (the private streets) to ensure perpetual public access between Tract A and all of Lots 1-9. 2) An access easement shall be provided and dedicated to allow the property owners association perpetual access to Tract B across Lot 7 and/or 8.
|
|
Corrective Action Required
ACCESS RESTRICTION. Add a note and symbology to Lots 1-5 and 9 indicating that no direct vehicular access shall be allowed from said lots onto NW/NE Colbern Rd. Also reference NE Douglas St and I-470 to the access restriction note, which already show controlled access symbology.
|
|
Corrective Action Required
SURVEYOR'S GENERAL NOTES. 1) Remove or revise the note stating that the subject property is zoned PMIX and R-1. The property is now all zoned PMIX following approval of the related rezoning and preliminary development plan application. 2) A note is provided stating that the plat was prepared June 20, 2024. However, this date conflicts by four (4) months with the "Issued Date" of 02/23/2024 listed under the Drawing Information title block section.
|
|
Corrective Action Required
ADDRESSES. Addresses for the proposed lots and tracts will be provided under separate cover once finalized.
|
|
|
Engineering Review
|
Corrections
|
01/24/2025
|
01/22/2025
|
|
Susan Nelson, P.E.
|
|
Corrective Action Required
Right-of-way and utility easements must be modified along Colbern Rd. to accommodate the widening for the added turn lanes and shared use path. Show and label all right-of-way and utility easements (existing and proposed) with appropriate documentation throughout the entire plat both along Colbern Rd and Douglas St.
|
|
Corrective Action Required
The new right-of-way should extend one foot beyond the 10-foot-wide shared use path. The utility easement should extend a minimum of 10’ beyond the new right-of-way.
|
|
Corrective Action Required
Incorporate these right-of-way and utility easement additions throughout all development plan sets.
|
|
|
Traffic Review
|
Corrections
|
01/24/2025
|
01/21/2025
|
|
Erin Ralovo
|
|
Corrective Action Required
10' Shared Use path should be shown and labeled on the plat.
|
|
|
GIS Plat Review
|
Corrections
|
01/24/2025
|
01/15/2025
|
|
Kathy Kraemer
|
|
Corrective Action Required
Please mark dimensions on each side of centerline for all streets.
|
|
Corrective Action Required
Lot line between lots 6 and 1 is missing the bearing.
Lot line between Tract B and lots 7 and 8 is missing the bearing.
Lot line between lots 2 and 3 are missing bearing and dimension.
Lot line between lot 2 and Annie/private drive is missing dimension.
Also please mark the dimension of the west part of lot 1; the 273.23 is for lot 2.
|
|
Corrective Action Required
North line of lot 2 is not 164.04 but 178.34
|
|
Corrective Action Required
The certification near the signatures, the dedication, and the common area note all reference the wrong plat name.
|
|
Corrective Action Required
The ownership must match exactly what is at Jackson County. One parcel has ownership as ORR STREETS LOFTS LLC and the other as DISCOVERY PARK LEES SUMMIT LLC. Neither of these are listed as owners on the plat. "DPLS P1 LLC" is referenced in the box at the top, but cannot be used on the plat because it is different from the owner of record at Jackson Co.
|
|
|