Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
Approved with Conditions
|
11/21/2023
|
11/22/2023
|
|
Shannon McGuire
|
|
Corrective Action Required
Per UDO requirements, no exposed wood will be permitted. All wood must be capped with a syntactic material such as Trex, metal or other manmade medium. Failure to comply with this UDO requirement may result in the delayed issuance of Occupancy Permits.
|
|
|
Fire Review
|
Approved with Conditions
|
11/21/2023
|
11/15/2023
|
|
Mike Weisenborn
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Building Codes Review
|
No Comments
|
10/19/2023
|
10/25/2023
|
|
Joe Frogge
|
|
MISC
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Action required: Comment is informational as this is typically provided at building permit stage. Full analysis at that submittal will be required and will also need to provide information to justify not being on an "accessible route" presumably by an exception in IBC 1103.
|
|
|
Planning Review
|
Corrections
|
10/19/2023
|
10/19/2023
|
|
Shannon McGuire
|
|
Corrective Action Required
Sheet A2 still lists 4x4 treated deck supports at stairs as a material. Wood is not an approved material. Please confirm that nor exposed wood will be present when the deck is constructed.
|
|
|
Engineering Review
|
No Comments
|
10/19/2023
|
10/12/2023
|
|
Scott Ready
|
|
|
Traffic Review
|
No Comments
|
10/19/2023
|
10/12/2023
|
|
Scott Ready
|
|
|
Fire Review
|
Approved with Conditions
|
10/19/2023
|
10/12/2023
|
|
Scott Ready
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Engineering Review
|
No Comments
|
08/17/2023
|
08/16/2023
|
|
Gene Williams, P.E.
|
|
|
Traffic Review
|
No Comments
|
08/17/2023
|
08/16/2023
|
|
Erin Ralovo
|
|
|
Fire Review
|
Approved with Conditions
|
08/17/2023
|
08/14/2023
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Building Codes Review
|
Approved with Conditions
|
08/17/2023
|
08/14/2023
|
|
Joe Frogge
|
|
MISC
Corrective Action Required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Action required: Comment is informational as this is typically provided at building permit stage. Full analysis at that submittal will be required and will also need to provide information to justify not being on an "accessible route" presumably by an exception in IBC 1103.
|
|
|
Planning Review
|
Corrections
|
08/17/2023
|
08/13/2023
|
|
Shannon McGuire
|
|
Corrective Action Required
Building Materials – Wood is not an approved material for building exteriors. This includes the columns, deck supports, handrails, stair risers, etc. These will need to be constructed out of or wrapped in an approved material.
|
|
Corrective Action Required
Building Materials – What material will be used on the underside of the deck? Exposed wood beams and floor joists are not administratively approvable if they are wood.
|
|
Corrective Action Required
Building Materials – What material is the railing made out of?
|
|
Corrective Action Required
Building Materials – Please label the proposed wall material to replace the removed roof.
|
|
|