PL2023109
MIDWEST CARWASH - PUBLIC WATER AND SANITARY MAIN EXTENSION
Engineering Plan Review
Engineering Plan Review
Withdrawn
05/08/2023
MIDWEST WASH GROUP LLC
Public water main between M 291 Hwy and Decker St on the north side of Thompson Dr. Extend existing sanitary and install manhole.
Locations
Contacts
MIDWEST WASH GROUP LLC, Address:1362 NE WINDSOR DR  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Corrections 07/20/2023 07/20/2023
Mike Weisenborn
Corrective Action Required
07/19/2023

Please provide HGL for sanitary sewer main profile.
Corrective Action Required
07/19/2023

Provide the sanitary service line stub in these plans to prevent a cut-in to the new sanitary line in the FDP plans. Wyes shall be located at least 4 feet from manholes (edge to edge).
Corrective Action Required
07/19/2023

Please note that there may be additional comments after the FDP plans are submitted and subsequently coordinated in review.
Engineering Review Corrections 07/03/2023 06/28/2023
Susan Nelson, P.E.
Corrective Action Required
06/28/2023

WM3.00 It appears that there is 3.5 to 4 feet of cover over the proposed water main. Water Utilities direction indicates providing 3 feet of cover over the water main with about a foot of separation to the storm sewer crossing. With less than 18 inches of separation, all water main joints within 10 feet of the outside of the storm pipe need to be restrained. Please revise.
Corrective Action Required
06/28/2023

Please include the public sanitary sewer main extension plans within the public water main plan set.
Engineering Review Corrections 05/23/2023 05/22/2023
Susan Nelson, P.E.
Corrective Action Required
05/22/2023

Please provide Engineer’s Estimate of Probable Costs.
Corrective Action Required
05/22/2023

Please provide MDNR Land Disturbance Permit and SWPPP.
Corrective Action Required
05/22/2023

Revise these plans with any revisions to the Final Development Plans.
Corrective Action Required
05/22/2023

Please show and label all right of way and easements within the project area.
Corrective Action Required
05/22/2023

Label U/E instead of W/E and be consistent with the legend.
Corrective Action Required
05/22/2023

Install 8” pipe and associated fittings for the proposed water main.
Corrective Action Required
05/22/2023

Add a note that the proposed water main must be bored beneath Thompson Dr. No open-trench shall be allowed for installation of the proposed water main.
Corrective Action Required
05/22/2023

Concrete encasement is shown on the proposed water main near the utility conflict. Please explain why this is being used.
Corrective Action Required
05/22/2023

The existing water main that is to be abandoned is the east-west water main along the northern boundary.
Corrective Action Required
05/22/2023

Remove the note that indicates abandoning any north-south water mains. These are not being abandoned with this project.
Corrective Action Required
05/22/2023

There appears to be conflicts with the existing utilities and the proposed construction in the southwest corner. Also, verify that all existing water mains are identified.
Corrective Action Required
05/22/2023

Notes shall be provided on the existing water main to the north of Thompson Dr. denoting the existing east/west lines are not to be disturbed. One of the water mains is a special district line and no disturbance of this line is allowed.
Corrective Action Required
05/22/2023

Sheet #### needs a number.
Corrective Action Required
05/22/2023

Please explain why you are specifying DIP? C900 pipe is needed, not ductile iron, unless you are proposing to use zinc-coated DIP.
Corrective Action Required
05/22/2023

Inadequate cover (need 3.5 feet minimum) over the pipe where it is shown being installed over the 6-inch HDPE line. Note: The 6-inch HDPE line which appears to be the outlet for the detention basin is too small, please see comments in the Final Development Plans.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home