Review Type |
Outcome |
Est. Completion Date |
Completed |
Record Drawings Review
|
No Comments
|
01/06/2025
|
01/14/2025
|
|
Susan Nelson, P.E.
|
|
|
Engineering Review
|
No Comments
|
06/05/2023
|
05/25/2023
|
|
Susan Nelson, P.E.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $3,337.24
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
MISC
Corrective Action Required
Thrust block are required at the 90 degree bends. Please show on the record drawings.
|
|
|
Engineering Review
|
Corrections
|
05/16/2023
|
05/16/2023
|
|
Susan Nelson, P.E.
|
|
Corrective Action Required
Please station the inline gate valve and both private fire line connection points in the plan view.
|
|
Corrective Action Required
At Sta: 0+00, install a 90-degree bend. No valves are needed.
|
|
Corrective Action Required
At the location of the west side fire line (needs a station), install a new 8” tee with two 8” gate valves (NE) and (SE) and thrust block. Add note that the (SE) valve to the fire line must be restrained to the tee with an anchor fitting.
|
|
Corrective Action Required
At Sta. 17+31.66, install new 16” x 8” cut-in tee with an 8” gate valve (W) an a 16” butterfly valve (N).
|
|
Corrective Action Required
At Sta. 16+66.76 install a 90-degree bend. No valves are needed.
|
|
Corrective Action Required
Move the private fire line connection (needs a station) to approximately mid distance between Sta. 16+66.76 and the first bend at Sta. 16+50.76. Install a new 8” tee with an 8” gate valve (W) and thrust block. Add note that the (W) valve to the fire line must be restrained to the tee with an anchor fitting.
|
|
|
Engineering Review
|
Corrections
|
03/31/2023
|
03/31/2023
|
|
Susan Nelson, P.E.
|
|
Corrective Action Required
Please explain how the location for the west connection to the existing water line was determined.
|
|
Corrective Action Required
An inline valve is required for every 1000’ of water line.
|
|
Corrective Action Required
Please provide 3-8” Gate Valves for the connection to the existing water line (2 locations).
|
|
Corrective Action Required
All bends must be labeled.
|
|
Corrective Action Required
Please add an 8” Tee with 2-8” Gate Valves for the new private line west connection.
|
|
Corrective Action Required
Please change the 90 to a Tee w 2-8” Gate Valves on the east private line connection.
|
|
Corrective Action Required
The plans must note that directional boring will be required under all City streets and that no open cuts will be allowed.
|
|
Corrective Action Required
Please be aware that further comments are possible pending the water model analysis.
|
|
|