PL2023042




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2023042
Summer Moon Coffee
Commercial Final Development Plan
Commercial Final Development Plan
Approved
03/01/2023
SUMMIT NORTHRIDGE LLC
Locations
Contacts
SUMMIT NORTHRIDGE LLC, Address:605 W 47TH ST STE 200  
Jessica Wardle, Address:8655 Penrose Lane Suite 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 04/24/2023 04/24/2023
Sue Pyles, P.E.
DE Contact Field Eng. Inspector
Corrective Action Required
04/24/2023

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
04/24/2023

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee of $2,537.28 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit.
Planning Review No Comments 04/24/2023 04/24/2023
Hector Soto Jr.
Building Codes Review No Comments 04/24/2023 04/17/2023
Scott Ready
Traffic Review No Comments 04/24/2023 04/17/2023
Scott Ready
Fire Review Approved with Conditions 04/24/2023 04/17/2023
Scott Ready
Code Statement
Corrective Action Required
04/17/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Planning Review Corrections 03/15/2023 03/15/2023
Hector Soto Jr.
Corrective Action Required
03/15/2023

TRASH ENCLOSURE PAD. Trash enclosure areas shall be improved with a Portland cement concrete pad and a Portland cement concrete approach 30 feet in length, measured from the enclosure opening. The pad and approach shall be improved with a minimum six inches of full depth unreinforced Portland cement concrete constructed on a sub-grade of four inches of granular base course. The proposed pad in front of the enclosure is only 20' in length, measured from the enclosure opening.
Corrective Action Required
03/15/2023

WALL PACK LIGHT FIXTURE. Provide a cut sheet of the proposed new wall pack fixture to the left of the new drive-through window for review. Wall packs shall comply with the requirements under UDO Section 8.260.
Engineering Review Corrections 03/15/2023 03/15/2023
Sue Pyles, P.E.
Corrective Action Required
03/15/2023

Submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
03/15/2023

Please clarify the plans to better delineate what curb & gutter is existing and remains, is to be removed, and is proposed.
Corrective Action Required
03/15/2023

The pavement sections shown do not meet the requirements shown in Section 8.620 of the Unified Development Ordinance. Revise details to meet requirements as shown in the table on Sheet C05.
Building Codes Review No Comments 03/15/2023 03/10/2023
Joe Frogge
Fire Review Approved with Conditions 03/15/2023 03/09/2023
Jim Eden
Code Statement
Corrective Action Required
03/15/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Traffic Review No Comments 03/15/2023 03/06/2023
Brad Cooley, P.E., RSPI
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $725.00 $725.00 Paid 03/02/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
03/01/2023 Application Form Summer Moon Ownership Affidavit_11-18-2022
03/01/2023 Plans Summer Moon FDP_03-01-2023
03/01/2023 Application Form Summer Moon FDP Checklist_03-01-2023
03/02/2023 Receipt Receipt for transaction:2023-001190
03/15/2023 Letter Applicant Letter - FDP (DFDP)
04/17/2023 Letter 2023-04-17 FDP Response Letter
04/17/2023 Plans 22-0188 FDP
04/24/2023 Letter Applicant Letter - FDP (DFDP)
04/24/2023 Activity Document Fees Summer Moon Coffee FDP
04/25/2023 Approved Plans Approved FDP Summer Moon Coffee_042523_22-0188 FDP
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home