Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
Approved with Conditions
|
12/02/2022
|
12/02/2022
|
|
Gene Williams, P.E.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee/sanitary sewer impact fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $27,353.55
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
Misc.
Corrective Action Required
The stormwater waiver is currently under review. Staff is recommending approval of the waiver, but in the event the waiver is not approved, revisions to the Final Development Plan may be required.
|
|
|
Planning Review
|
No Comments
|
12/02/2022
|
11/28/2022
|
|
Hector Soto Jr.
|
|
|
Building Codes Review
|
No Comments
|
12/02/2022
|
11/23/2022
|
|
Joe Frogge
|
|
Miscellaneous Correction
Water service backflow to be inside building.
11/17/22 - still shown on C800-A
|
|
Miscellaneous Correction
Specify size, type, and location of water meter.
11/17/22 - Not found on plans.
|
|
|
Fire Review
|
Approved with Conditions
|
12/02/2022
|
11/23/2022
|
|
Mike Weisenborn
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Imposed Loads
Corrective Action Required
IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
The sidewalk FD Acess shall support the weight of a fire apparatus (75,000-pounds).
|
|
|
Traffic Review
|
No Comments
|
12/02/2022
|
11/23/2022
|
|
Mike Weisenborn
|
|
|
Fire Review
|
Approved with Conditions
|
11/18/2022
|
11/21/2022
|
|
Mike Weisenborn
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Imposed Loads
Corrective Action Required
IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
The sidewalk FD Acess shall support the weight of a fire apparatus (75,000-pounds).
|
|
|
Planning Review
|
Corrections
|
11/18/2022
|
11/17/2022
|
|
Hector Soto Jr.
|
|
Corrective Action Required
SITE DATA TABLE (Sheet C100-A).
- Correct the listed property zoning from PO to AG (Agricultural).
- Fill in the setback information for Front (30' per plat); Rear (50'); and side (50').
- Provide building square footage for the existing school; the proposed robotics building; and total (existing + proposed).
- List the number of existing classrooms; the number of proposed classrooms (from the addition); and total classrooms (existing + proposed).
- List the number of existing parking parking spaces and the number of required parking spaces. The number of required parking spaces for a high school is calculated at a rate of 6 spaces per total classrooms.
The comments listed above were previously made but not addressed on the resubmittal. The FDP response letter indicates that they have been addressed on Sheet C100-A, but they have not been.
|
|
|
Building Codes Review
|
Corrections
|
11/18/2022
|
11/17/2022
|
|
Joe Frogge
|
|
Miscellaneous Correction
Sanitary connection at manhole not allowed.
|
|
Miscellaneous Correction
Corrective Action Required
Water service backflow to be inside building.
11/17/22 - still shown on C800-A
|
|
Miscellaneous Correction
Corrective Action Required
Specify size, type, and location of water meter.
11/17/22 - Not found on plans.
|
|
|
Engineering Review
|
Corrections
|
11/18/2022
|
11/17/2022
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Sheet C800-A: Backflow vault is shown on the domestic line rather than the fire line. Backflow devices for domestic service lines shall be located within the building, not outside the building and not within a vault.
|
|
Corrective Action Required
Sheet C500-A: Please see above comment. The same comment applies to this sheet. Please revise.
|
|
Corrective Action Required
The location and sizing of the water meter shall be shown on the utility sheet. Please show the location and sizing of the meter. Please revise.
|
|
Corrective Action Required
A separately-recorded easement may need to be submitted for the new water meter to be installed. If required by Water Utilities, it should extend 5 feet around the perimeter of the water meter pit. Please use our standard template for water line easement, and provide a courtesy review copy with an 8.5 inch by 11 inch exhibit showing the limits of the easement in graphic format prior to execution and recording.
|
|
Corrective Action Required
The Design Criteria Modification Request template form was submitted without the summary sheet and exhibits. Please submit the template form, summary sheet, and exhibits as one (1) single pdf file.
|
|
Corrective Action Required
It appears a water meter already exists on the west side of the service entrance, and it may be possible to install a tee to this existing domestic service line. Please evaluate, as this will enable the elimination of the water meter and tap on the east side of the service drive.
|
|
|
Traffic Review
|
No Comments
|
11/18/2022
|
11/11/2022
|
|
Scott Ready
|
|
|
Traffic Review
|
No Comments
|
11/04/2022
|
11/04/2022
|
|
Brad Cooley, P.E., RSPI
|
|
|
Fire Review
|
Approved with Conditions
|
11/04/2022
|
11/01/2022
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Imposed Loads
Corrective Action Required
IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
The sidewalk FD Acess shall support the weight of a fire apparatus (75,000-pounds).
|
|
|
Planning Review
|
Corrections
|
11/04/2022
|
11/01/2022
|
|
Hector Soto Jr.
|
|
Corrective Action Required
SITE DATA TABLE (Sheet C100-A).
- Correct the listed property zoning from PO to AG (Agricultural).
- Fill in the setback information for Front (30' per plat); Rear (50'); and side (50').
- Provide building square footage for the existing school; the proposed robotics building; and total (existing + proposed).
- List the number of existing classrooms; the number of proposed classrooms (from the addition); and total classrooms (existing + proposed).
- List the number of existing parking parking spaces and the number of required parking spaces. The number of required parking spaces for a high school is calculated at a rate of 6 spaces per total classrooms.
|
|
Corrective Action Required
ROOF-TOP UNITS. In order to comply with City ordinances, all RTUs shall be fully screened from view by raising building parapet heights at least equal to the height of the units being screened.
|
|
Corrective Action Required
EXTERIOR MATERIALS. Label the proposed exterior building material colors.
|
|
Corrective Action Required
LIGHTING. Identify which light fixture(s) listed on the fixture schedule on Sheet E700 will be used on the building exterior. All exterior lighting fixtures shall comply with UDO Sections 8.220 and 8.260.
|
|
|
Engineering Review
|
Corrections
|
11/04/2022
|
11/01/2022
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Please add the project number to the waiver request form (i.e., PL2022373).
|
|
|
Building Codes Review
|
Corrections
|
11/04/2022
|
10/26/2022
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
Sanitary connection at manhole not allowed.
|
|
Miscellaneous Correction
Corrective Action Required
Water service backflow to be inside building.
|
|
Miscellaneous Correction
Corrective Action Required
Specify size, type, and location of water meter.
|
|
|