Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
Approved with Conditions
|
01/06/2023
|
12/29/2022
|
|
Mike Weisenborn
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #12 Cut & Fill
Corrective Action Required
Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
|
|
|
GIS Review
|
No Comments
|
01/06/2023
|
12/29/2022
|
|
Mike Weisenborn
|
|
|
Planning Review
|
No Comments
|
01/06/2023
|
12/29/2022
|
|
Mike Weisenborn
|
|
Miscellaneous Correction
Remove the Access Easement description form the plat and add a note on the plat that the easement will be dedicated by separate document.
|
|
|
Planning Review
|
Approved with Conditions
|
11/28/2022
|
12/12/2022
|
|
Mike Weisenborn
|
|
Miscellaneous Correction
Corrective Action Required
Remove the Access Easement description form the plat and add a note on the plat that the easement will be dedicated by separate document.
|
|
|
GIS Review
|
Corrections
|
11/28/2022
|
11/22/2022
|
|
Kathy Kraemer
|
|
Corrective Action Required
The ownership is flipped: City of LS owns lot 6A and Wais owns lot 7.
|
|
|
Engineering Review
|
Approved with Conditions
|
11/28/2022
|
11/18/2022
|
|
Gene Williams, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #12 Cut & Fill
Corrective Action Required
Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
|
|
|
Engineering Review
|
Corrections
|
11/03/2022
|
11/03/2022
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
A ten (10) foot general utility easement is required along the Bowlin Rd. street frontage. This shall be dedicated on the plat, and shall overlap what is already dedicated in the form of a separately-recorded water line easement. Please revise.
|
|
Corrective Action Required
The easement near the southwest corner of Lot 7-A does not appear to include the limits of the extended public sanitary sewer line and manhole. Please verify, and ensure there is sufficient width around the manhole to allow for future maintenance.
|
|
|
GIS Review
|
Corrections
|
11/03/2022
|
10/24/2022
|
|
Kathy Kraemer
|
|
Corrective Action Required
Please provide an ITB on one end of the curve along Lakewood Way.
|
|
|
Planning Review
|
Corrections
|
10/26/2022
|
10/20/2022
|
|
Shannon McGuire
|
|
Corrective Action Required
Please label each lot with their respective street number
Lot 6-A1 - 5031 NE LAKEWOOD WAY
Lot 7-A - 5051 NE LAKEWOOD WAY.
|
|
Corrective Action Required
Please show the location of all oil and gas well on the subject properties. If none are present, please add a note stating such and cite the source of your information.
|
|
Corrective Action Required
Please show the required sidewalks adjacent to Lakewood Way and Bolin Road.
|
|
Corrective Action Required
Please update the City signature blocks to reflect the current city officials, George M. Binger, III P.E., City Engineer, Ryan A. Elam, P.E., Director of Development Services, Trisha Fowler Arcuri, City Clerk.
|
|
Corrective Action Required
City certificate of approval should read as follows “This is to certify that the plat of “Plat Name” was submitted and duly approved by the City of Lee’s Summit, pursuant to Chapter 33, the Unified Development Ordinance, of the City of Lee's Summit Code of Ordinances.”
|
|
Corrective Action Required
Language shall be added to every plat in which an easement is dedicated, stating that the grantor, on behalf of himself, his heirs, his assigns and successors in interest, hereby waives, to the fullest extent allowed by law, including, without limitation, Section 527.188 RSMo. (2006) any right to request restoration of rights previously transferred and vacation of the easements herein granted.
|
|
Corrective Action Required
All easements must be defined as to who they are dedicated to and for what use. Access easement dedication language should read as follows “An easement to provide access to and from (define who gets access) is herby established as shown on the plat and designated as Access Easement (A/E). Said easement is for the mutual benefit of the present and future owners, their mortgagees, tenants, business invitees and any emergency vehicles, equipment and personal.”
|
|
Corrective Action Required
The signature of all property owners is required. As Lot 6-A1 & Lot 7-A are under separate ownership, signature block will be required for both. Please add a signature block for the owner of lot 6-A1.
|
|
|