Planning Application Status

PL2022354




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022354
Mega Storage - Phase II
Commercial Final Development Plan
Commercial Final Development Plan
Approved
10/04/2022
Locations
Contacts
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 11/22/2022 11/22/2022
Sue Pyles, P.E.
DE Contact Field Eng. Inspector
Corrective Action Required
11/22/2022

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
11/22/2022

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee of $16,332.02 (which is based on 3% of the total infrastructure cost plus a water test inspection fee(s)) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit.
DE Future Repair Work
Corrective Action Required
11/22/2022

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Fire Review Approved with Conditions 11/22/2022 11/21/2022
Jim Eden
Code Statement
Corrective Action Required
11/22/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Resolved
11/21/2022

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. The three northern most buildings on the northeast side do not meet this requirement.
Building Codes Review No Comments 11/22/2022 11/21/2022
Joe Frogge
Miscellaneous Correction
Resolved
11/21/2022

Provide complete, engineered design for retaining wall.
Planning Review No Comments 11/22/2022 11/17/2022
Hector Soto Jr.
Traffic Review No Comments 11/22/2022 11/15/2022
Mike Weisenborn
Planning Review Corrections 10/18/2022 10/21/2022
Hector Soto Jr.
Corrective Action Required
10/21/2022

PHOTOMETRIC PLAN. Provide a plan with foot-candle levels for the subject phase.
Engineering Review Corrections 10/18/2022 10/20/2022
Sue Pyles, P.E.
Corrective Action Required
10/20/2022

The angles between Lines 6 and 5 at Str. 5-2 and between Lines 13 and 1 at Str. 1-6 are less than 90 degrees, which is not desirable. Please revise if possible.
Corrective Action Required
10/20/2022

Please verify that the Str. 5-2 outflow pipe will fit the structure wall opening requirements given the exit angle.
Corrective Action Required
10/20/2022

Please label the separation between the fire line and storm pipe at the Lines 12 and 13 crossings.
Corrective Action Required
10/20/2022

The City does not approve the alternate pavement section request submitted to eliminate the 4” aggregate base layer.
Building Codes Review Corrections 10/18/2022 10/19/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
10/19/2022

Provide complete, engineered design for retaining wall.
Fire Review Corrections 10/18/2022 10/18/2022
Jim Eden
Code Statement
Corrective Action Required
10/18/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Hydrants
Corrective Action Required
10/18/2022

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. The three northern most buildings on the northeast side do not meet this requirement.
Traffic Review No Comments 10/18/2022 10/18/2022
Brad Cooley, P.E., RSPI
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 06/14/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings

There are no hearings for this planning application.

Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home