Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
No Comments
|
09/22/2023
|
09/22/2023
|
|
Sue Pyles, P.E.
|
|
|
Engineering Review
|
No Comments
|
09/18/2023
|
09/11/2023
|
|
Sue Pyles, P.E.
|
|
|
Traffic Review
|
No Comments
|
09/18/2023
|
09/01/2023
|
|
Scott Ready
|
|
|
Engineering Review
|
Corrections
|
08/02/2023
|
08/02/2023
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Please revise the 100-yr WSE shown on Sheet C.200 to match the detention basin sheet and the storm study.
|
|
Corrective Action Required
If the existing curb inlet is being converted to a junction box, how will the drainage be handled in the absence of the inlet? Include the Junction Box standard detail.
|
|
Corrective Action Required
Please show the proposed ADA-ramps in Plan views throughout the plan set.
|
|
Corrective Action Required
Please revise the ADA-ramp locations as shown on the attached sheet.
|
|
Corrective Action Required
Please revise the right-turn arrows to be right-turn/straight arrows.
|
|
Corrective Action Required
Additional comments regarding the intersection with Colbern Road will be forthcoming under separate cover.
|
|
|
Traffic Review
|
No Comments
|
08/02/2023
|
07/19/2023
|
|
Scott Ready
|
|
|
Engineering Review
|
Corrections
|
06/21/2023
|
06/21/2023
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Sheet C.001:
• Revise the Street & Storm Construction and Design Notes to match this project.
• Revise the Site Location Map to reflect the construction of the east-west street.
• Include a Vicinity Map.
• Revise the Summary of Quantities Table to include all items included in construction.
|
|
Corrective Action Required
Sheet C.100: Please label the Street 2 R/W.
|
|
Corrective Action Required
Sheet C.200:
• Show and label the detention basin 100-year WSE and the emergency spillway.
• Please show the swale location for the swale referenced by the typical section.
|
|
Corrective Action Required
Sheets C.202-C.203: Please include ADA-accessible ramps at the intersections with NE Colbern Road NE Rice Road and include in the street profiles.
|
|
Corrective Action Required
Sheet C.204:
• Include designs for the ramps mentioned above.
• What does the Spot Elevation Table refer to?
|
|
Corrective Action Required
Sheets C.251-C.253:
• Show and label all required demolition.
• Include construction design information for the proposed right turn lane on Colbern.
• What is on Street 1, median or striping?
|
|
Corrective Action Required
Sheet C.254: Include pavement marking information for Street 1.
|
|
Corrective Action Required
Sheet C300: There is an existing curb inlet shown to be used that will be in the middle of the widening for the Colbern right turn lane. Please revise.
|
|
Corrective Action Required
Sheet C.301:
• Revise Storm Line 1 to match proposed conditions.
• The angle between Storm Line 4 and Storm Line 2 is less than 90 degrees. Please revise.
• Please show the design HGL in the Profile views.
• Please include a drainage map, storm drainage calculations, and inlet calculation in the plan set.
|
|
Corrective Action Required
Sheet C.305: Label the top of spillway elevation.
|
|
Corrective Action Required
Please revise the estimate to include all items included in construction.
|
|
|
Traffic Review
|
No Comments
|
06/21/2023
|
06/19/2023
|
|
Erin Ralovo
|
|
|
Engineering Review
|
Corrections
|
03/29/2023
|
03/31/2023
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Plans will not be reviewed until all road improvements associated with the approved traffic study are incorporated into one set of public plans. Thei will mean combining the multiple sets of road plans submitted as well as adding any additional improvements, such as traffic signals, to the plan set.
|
|
|
Traffic Review
|
Corrections
|
03/29/2023
|
03/29/2023
|
|
Brad Cooley, P.E., RSPI
|
|
Corrective Action Required
Plans should reflect the traffic improvements associated with the C-Store.
|
|
|
Engineering Review
|
Corrections
|
09/27/2022
|
09/28/2022
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Please include construction of Street 2 between NE Rice Road and Street 1 in this plan set.
|
|
Corrective Action Required
Include a staging/phasing chart with the ESC plan. Is the detention basin to be used as a sediment basin? Please clarify.
|
|
Corrective Action Required
Please revise the sheets labeled Master Drainage Plan to be labeled Grading Plan and Spot Elevations.
|
|
Corrective Action Required
Please expand the grading limits to include the detention basin area.
|
|
Corrective Action Required
There are no spot elevations on the spot elevation sheet. Are there supposed to be?
|
|
Corrective Action Required
Include ADA ramps at street crossings.
|
|
Corrective Action Required
Modify the detention basin outlet to drain northeast. Perhaps a swale will be required. This will allow the flow to stay on property under the same ownership prior to reaching the pond.
|
|
Corrective Action Required
Hatch all areas requiring compacted fill in storm sewer Profile views.
|
|
Corrective Action Required
Include design details of the outlet structure in the plan set.
|
|
Corrective Action Required
Include both proposed and required detention basin volume.
|
|
Corrective Action Required
Show and label the proposed detention basin, including 100-year WSE elevation and boundary, throughout the plan set.
|
|
Corrective Action Required
Please prominently include the following note: CONTRACTOR TO CONSTRUCT STORMWATER MANAGEMENT FACILITIES, SPECIFICALLY THOSE FEATURES RELATED TO DETENTION, PRIOR TO ANY LAND DISTURBANCE OF THE SITE AND PRIOR TO THE CONSTRUCTION OF ANY OTHER SITE DEVELOPMENT WORK AS NOT TO EFFECT DOWNSTREAM NEIGHBORS WITH UNDETAINED STORMWATER DISCHARGE.
|
|
|
Traffic Review
|
Corrections
|
09/27/2022
|
09/26/2022
|
|
Brad Cooley, P.E., RSPI
|
|
Corrective Action Required
Plans have not been reviewed. Until we have an approvable traffic study, we can not review plans for compliance.
|
|
|