Planning Application Status

PL2022091




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022091
COBEY CREEK 2ND PLAT
Final Plat
Final Plat
Withdrawn
03/14/2022
JCM DEVELOPMENT LLC
Locations
Contacts
JCM DEVELOPMENT LLC, Address:1314 SW MARKET ST  
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
ANDERSON ENGINEERING INC, Address:941 W 141ST TERRACE SUITE A, Phone:(816) 777-0400  
Reviews
Review Type Outcome Est. Completion Date Completed
GIS Review No Comments 10/05/2022 10/05/2022
Kathy Kraemer
Engineering Review Approved with Conditions 10/05/2022 09/29/2022
Gene Williams, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
09/28/2022

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
09/28/2022

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
09/28/2022

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
09/28/2022

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #05 As-Graded MDP
Corrective Action Required
09/28/2022

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
09/28/2022

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
09/28/2022

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
DE C&O #08 Changes to MDP
Corrective Action Required
09/28/2022

A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
DE C&O #12 Cut & Fill
Corrective Action Required
09/28/2022

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
09/28/2022

All ADA sidewalk ramps shall be constructed by the developer at the time the street is constructed.
DE C&O #14 Common Area Sidewalks
Corrective Action Required
09/28/2022

All sidewalks adjacent to a common area tract, unplatted land or any land where no structure is intended to be built, and is required, shall be constructed by the developer at the time the street is constructed.
DE Commercial Detention Basin
Corrective Action Required
09/28/2022

The applicant shall submit and the City shall accept an “As-built / As-graded” detention basin plan prior to issuance of any Certificate of Substantial Completion for the proposed development.
Corrective Action Required
09/29/2022

MoDOT approval of the west entrance is still pending. The plat cannot be approved until MoDOT approves the geometry of the west entrance.
Traffic Review Approved with Conditions 10/05/2022 09/28/2022
Scott Ready
Fire Review No Comments 10/05/2022 09/28/2022
Scott Ready
Planning Review Approved with Conditions 10/05/2022 09/28/2022
Scott Ready
Planning Review Approved with Conditions 09/15/2022 09/15/2022
Scott Ready
Traffic Review Approved with Conditions 09/15/2022 09/15/2022
Scott Ready
GIS Review Corrections 09/15/2022 09/15/2022
Kathy Kraemer
Corrective Action Required
09/13/2022

Bearing on lthe back of lot 49 has wrong direction.
Corrective Action Required
09/13/2022

the back line of lot 47 should have a dimension of 52.80, to equal the overall length of 72.63
Corrective Action Required
09/13/2022

Please double check all dimensions on lot 38. when I draw using the listed dimensions, the "curb cut" ends up being 50 feet long. I believe the front of lot 38 should be closer to 62 than 53.40
Corrective Action Required
09/14/2022

The overall distance of the curve along the backs of lots 36 and 37 is 87.77, however the combined lot distances equal 88.77 Also, on the drawing, it lists the radius as 325, but it should be 175. Please revise.
Corrective Action Required
09/14/2022

Please confirm that the part of the plat boundary on the back of lot 34 is 28.55 (96.71-68.16)
Corrective Action Required
09/14/2022

Please provide a dimension on the straight part along the back of lot 33 (near the curb cut)
Corrective Action Required
09/15/2022

Please add the dimension of 16.94 to the back of lot 60.
Engineering Review Approved with Conditions 09/15/2022 09/15/2022
Gene Williams, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
09/15/2022

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
09/15/2022

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
09/15/2022

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
09/15/2022

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #05 As-Graded MDP
Corrective Action Required
09/15/2022

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
09/15/2022

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
09/15/2022

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
DE C&O #08 Changes to MDP
Corrective Action Required
09/15/2022

A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
DE C&O #12 Cut & Fill
Corrective Action Required
09/15/2022

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
09/15/2022

All ADA sidewalk ramps shall be constructed by the developer at the time the street is constructed.
DE C&O #14 Common Area Sidewalks
Corrective Action Required
09/15/2022

All sidewalks adjacent to a common area tract, unplatted land or any land where no structure is intended to be built, and is required, shall be constructed by the developer at the time the street is constructed.
DE Commercial Detention Basin
Corrective Action Required
09/15/2022

The applicant shall submit and the City shall accept an “As-built / As-graded” detention basin plan prior to issuance of any Certificate of Substantial Completion for the proposed development.
Fire Review No Comments 09/15/2022 09/08/2022
Scott Ready
Fire Review No Comments 09/02/2022 09/02/2022
Dawn Bell
Planning Review Approved with Conditions 09/02/2022 09/02/2022
Shannon McGuire
Corrective Action Required
09/02/2022

Tract K should to be included in the Common Area dedication paragraph along with tracts A and B.
Engineering Review Corrections 09/02/2022 09/02/2022
Gene Williams, P.E.
Corrective Action Required
09/02/2022

Sheet 5 of 6: For clarity, please add two (2) labels along the south side of Gillette St. and two (2) labels along the east and west side of Sunset Ridge, and one (1) label along the west side of Cobey Creek Dr. denoting "U/E". It is a little difficult to make this determination, and hoping this will clarify where the easements are located. Please revise.
Corrective Action Required
09/02/2022

"Corner" easements shown on the monument sign tracts should be labeled to avoid confusion. Please add a label and leader line to each corner specifying the fact these are "U/E"s. Please revise as appropriate.
Corrective Action Required
09/02/2022

Ensure the monument signs are not encroaching within the limits of the "corner" easements. The monument sign application is currently under review, so please keep in mind the potential for Traffic, Planning, or Fire comments related to the monument signs that may cause the plat to change.
Corrective Action Required
09/02/2022

Please be aware the email from Garrett Cates concerning the monument signs dated Aug. 29, 2022 appears to meet the requirements of Engineering in terms of setback from the water mains, but will need to be reviewed by Traffic, Planning, and Fire. We did notice, however, the "corner" easements within the tracts were not shown, but it did not appear the monument signs were located within them. This will eventually need to be corrected to show these "corner" easements within the tracts, but as previously discussed, comments shall be forthcoming on this application.
Corrective Action Required
09/02/2022

Please call me if any clarification is needed concerning the "corner" easements and how to show them on the plat and the monument sign application. We are looking for a clear identification of the U/E along the corners of these monument sign tracts.
Corrective Action Required
09/02/2022

We are still awaiting MoDOT approval of the new access to the development. This shall be required prior to formal approval of the plat.
GIS Review Corrections 09/02/2022 08/31/2022
Kathy Kraemer
Corrective Action Required
08/31/2022

The ownership at Jackson Co is both Clayton Properties AND JCM Development LLC. If ownership has transferred, please provide recorded document number of deed.
Traffic Review Approved with Conditions 09/02/2022 08/31/2022
Brad Cooley, P.E., RSPI
Corrective Action Required
08/31/2022

Review and acceptance from the State is required. Any requirements presented by MoDOT will be subject to conditioning approval.
Planning Review Corrections 07/29/2022 07/29/2022
Shannon McGuire
Corrective Action Required
07/29/2022

If you are re-platting Tract K to clarify and re-dedicate the area as a stormwater detention tract, you will need to include it in the dedication paragraph as such.
Engineering Review Corrections 07/29/2022 07/29/2022
Gene Williams, P.E.
Corrective Action Required
07/29/2022

Tract K does not appear to have been identified on the dedication language. Please ensure Tract K is defined on the dedication language.
GIS Review Corrections 07/29/2022 07/27/2022
Kathy Kraemer
Corrective Action Required
07/27/2022

There is still no ownwership on this plat, only a "member" name.
Corrective Action Required
07/27/2022

Coordinates are still incorrect. Please check each one. For example, 25 is correct, but 27, 28, 29, 30 and 51 are incorrect and the 2 values listed for coordinate 2 (top of table and bottom of table) are not even the same. It appears only 2-26 were corrected.
Corrective Action Required
07/27/2022

Since there is already a n/s Corbin Dr, please rename the e/w portion of Corbin (from Sunset Ridge to Fairbrook).
Fire Review No Comments 07/29/2022 07/27/2022
Jim Eden
Misc.
Corrective Action Required
07/25/2022

NE Jud Circle is not an acceptable name.
Traffic Review Approved with Conditions 07/29/2022 07/27/2022
Brad Cooley, P.E., RSPI
Corrective Action Required
07/27/2022

Review and acceptance from the State is required. Any requirements presented by MoDOT will be subject to conditioning approval.
Planning Review Corrections 03/29/2022 03/30/2022
Shannon McGuire
Corrective Action Required
03/30/2022

Tract K has already been plated with the 1st Plat. Is there a completing reason to replat the tract?
Corrective Action Required
03/30/2022

East of the future north south stub in the 3rd plat (adjacent to lots 221-232), SE Coby Creek Rd will need to have a unique name for addressing reasons.
Corrective Action Required
03/30/2022

The portion of SE Corbin Drive adjacent to lots 205-219 & 236-250 will need to have a unique name for addressing reasons.
Corrective Action Required
03/30/2022

The bump out of SW Judd Court should remain SW Jud Circle (to be renamed).
Corrective Action Required
03/30/2022

The bump out of NE Coby Creek Court should remain SE Cobey Creek Road (to be renamed).
Corrective Action Required
03/30/2022

All directional suffixes in this subdivision shall be Southeast.
Corrective Action Required
03/30/2022

Please label the street names on all sheets.
Corrective Action Required
03/30/2022

Please label the area in square feet for each lot, parcel, or tract.
Corrective Action Required
03/30/2022

Please show the location of all oil and/or gas wells. If none are present please add a note stating such and cite your source of information.
Corrective Action Required
03/30/2022

Please assign lot numbers to the commercial lots adjacent to MO-150.
Corrective Action Required
03/30/2022

Please update the Planning Commission Secretary signature block to reflect the current City official, Cynda Rader.
Corrective Action Required
03/30/2022

Please update Ryan A. Elam’s signature block to reflect his correct title P.E. and Director of Development Services.
Corrective Action Required
03/30/2022

Please add the required signature block for the City Engineer, George M. Binger III, P.E.
Corrective Action Required
03/30/2022

The Section 527.188 RSMo. (2006) statement should be included with the easement dedication statement.
Corrective Action Required
03/30/2022

Please included a note on the plat specifying that individual lot owner(s) shall not change or obstruct the drainage flow lines on the lots covered by the Master Drainage Plan, unless specific application is made and approved by the City Engineer.
Corrective Action Required
03/30/2022

Please ensure that the required sidewalks extend to the full limits of the plat boundary. Specifically, adjacent to lot 233, tract K (across from lot 220).
Corrective Action Required
03/30/2022

Please show the required sidewalk adjacent to M-150 Highway.
Traffic Review Corrections 03/29/2022 03/30/2022
Brad Cooley, P.E., RSPI
Informational
03/30/2022

The City will require proof of acceptance from MoDOT for any connection to the State highway.
Corrective Action Required
03/30/2022

The City will require proof of acceptance from MoDOT for any connection to the State highway.
Engineering Review Corrections 03/30/2022 03/30/2022
Gene Williams, P.E.
Corrective Action Required
03/29/2022

Please refer to the Cobey Creek 1st Plat. The large detention basin on Tract H on the 1st Plat has already been platted. Was this done intentionally? If not, please reconcile since this area, along with other adjacent portions shown on the 2nd Plat have already been platted under the 1st Plat.
Corrective Action Required
03/29/2022

Please capitalize the "Master Drainage Plan" note since this is a document defined by Ordinance. In addition, please reference "the Master Drainage Plan for Cobey Creek 2nd Plat" to differentiate between other Master Drainage Plans (e.g., Cobey Creek 1st, etc.).
Corrective Action Required
03/29/2022

An exclusive easement for sanitary sewer is required between lots 229/230 and lots 68/69. These easements are located on the sideyards, and present a challenge for Water Utilities for ongoing maintenance. The language to place on the dedication language is as follows: "Sanitary Sewer Easement: A permanent and exclusive easement is hereby granted to the City of Lee’s Summit to patrol, alter, conduct surveys, construct, erect, inspect, install, maintain, operate, rebuild, reconstruct, relocate, remove, renew, repair and replace sewer pipe lines, manholes, and appurtenances thereto, including the right and privilege at any time and from time to time to enter upon, over, under, through, across, in, and upon those areas outlined or designated upon this plat at “Sanitary Sewer Easement” or within any street or thoroughfare dedicated to the public use on this plat. Grantor, its successors and assigns, shall not obstruct or interfere with Grantee’s use and enjoyment of the easement granted hereunder by any means, including, without limitation, obstructing or interfering with the operation, maintenance, or access to such pipe lines, manholes, and appurtenances thereto, by erecting, or causing or allowing to be erected, any building, structure, or other improvements on said easement. Grantor, its successors and assigns, to the fullest extent allowed by law, including, without limitation, section 527.188, RSMo., hereby waives any right to request vacation of the easements herein granted. All easements shall, at all times, be deemed to be and shall be a continuing covenant running with the land and shall be binding upon the successors and assigns of the Grantor."
Corrective Action Required
03/30/2022

Please see Planning comment related to abandoned oil and gas wells.
GIS Review Corrections 03/29/2022 03/29/2022
Kathy Kraemer
Corrective Action Required
03/22/2022

The ITB between coord 49 and 50 has S87-48-48E on the dwg and S87-44-48E in the legal. Please correct one so they match.
Corrective Action Required
03/22/2022

The coordinates are incorrect.
Corrective Action Required
03/22/2022

There is no ownership listed on this plat.
Corrective Action Required
03/23/2022

Please provide distances on every road segment (example SE Cobey Creek RD near CC Ct lacks segment distances for both the curve where CC Ct intersects, as well as the straight segment north of Corbin St). Also along Cobey Creek Rd at Jud.
Corrective Action Required
03/23/2022

Please provide road widths along the irregular curves on Gillette and Cobey Creek Rd.
Corrective Action Required
03/23/2022

Dimensions on lot 200 is wrong. Back of lot is more like 102 ft
Corrective Action Required
03/23/2022

Dimensions on Cobey Creek Dr (curve) is incorrect.
Corrective Action Required
03/23/2022

Please label every street on each page.
Corrective Action Required
03/23/2022

On Cobey Creek Rd, there is a curve with radius 335 and length of 36.50, near the intersection with Gillette. I believe this radius is incorrect;when I georeference the drawing to the map, it goes off the centerline at that point. Also, it makes the centerline off by 2.5-3 ft in relation to the plat boundary. If I change the radius to 135, it once again aligns and puts the centerline at 25 ft.
Corrective Action Required
03/23/2022

The dimensions on Jud Road is incorrect. Where it comes off Cobey Creek Dr, the centerline should be 74 ft, not 62.77
Corrective Action Required
03/23/2022

There is a mislabel on lot 70. There are 3 curves, and one is mislabeled as a radius instead of a length.
Corrective Action Required
03/23/2022

Please use tic marks throughout to indicate where one dimension starts and where it ends. For example, on pad 3, there is a straight segment near Carter Way. The street length of that segment is 105.94, but the pad length is 102.58 I'd need to use the tic marks to make sure it's drawn properly. This is especially important on the whole section at Gillette and Cobey Creek Rd with many dimensions and curves.
Corrective Action Required
03/23/2022

Please label the "cut" on lot 72 with bearing and distance
Corrective Action Required
03/24/2022

Please provide lot dimensions along Cobey Creek Dr for lots 36, 37, 38, and 39.
Corrective Action Required
03/24/2022

The outside plat dimension along M150 (682) on page 6 is incorrect.
Corrective Action Required
03/24/2022

Please rename Jud Circle to 2 separate, distinct street names.
Corrective Action Required
03/24/2022

The road segment on the northeast part of the plat currently named Cobey Creek Rd should be renamed to a different name. While a 3rd plat may connect them in the future, addressing and 911 centerline ranges will be problematic because the street runs both north/south and east/west. This is also the case on Corbin Dr. Since there is already a n/s Corbin Dr, please rename the e/w portion of Corbin
Corrective Action Required
03/24/2022

Please check the back lot dimensions on lot 75. When I draw out this lot, the line measures 113.85, but the 2 dimensions listed equal 131.05 Same thing with lot 76: when drawn out using the listed dimensions, the line is 99.70, but it's too short. My line is 115.89
Corrective Action Required
03/24/2022

Where is the ROW on Jud Rd? It's not listed on this plat. Because it looks like 25ft on the north side of the centerline, and 30ft on the south side of the centerline (using map measuring tools).
Fire Review Corrections 03/29/2022 03/23/2022
Jim Eden
Misc.
Corrective Action Required
03/23/2022

NE Jud Circle is not an acceptable name.
Fees
Paid Fees Amount Paid Owing Date Paid
Final Plat fee $1,231.00 $1,231.00 Paid 03/15/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 01/12/2023 5:00 PM Council Chambers 01/12/2023 05:00 PM
Public Hearing Review
Approved
01/12/2023
City Council Ordinance 1st Reading 02/07/2023 6:00 PM Council Chambers 02/07/2023 06:00 PM
Public Hearing Review
Approved
Documents & Images
Date Uploaded File Type Document Name
03/14/2022 Receipt Receipt for transaction: 2022-001379
03/14/2022 Application Form cobey creek 2nd plat - application
03/14/2022 Plans Cobey Creek 2nd Plat Description_Rev0_2022-03-14
03/14/2022 Plans Cobey Creek 2nd Plat Final Plat_Rev0_2022-03-14
03/14/2022 Plans Cobey Creek 2nd Plat Map Check_Rev0_2022-03-14
03/15/2022 Receipt Receipt for transaction:2022-001401
03/30/2022 Letter Applicant Letter - FP (DRCF)
07/22/2022 Letter 2022_07_22 - Cobey Creek 2nd Plat - Final Plat Comment Response
07/22/2022 Plans Cobey Creek 2nd Plat Final Plat_Rev1_2022-07-22
07/29/2022 Letter Applicant Letter - FP (DRCF)
08/26/2022 Letter 2022_08_26 - Cobey Creek 2nd Plat - Final Plat Comment Responnse
08/26/2022 Plans Cobey Creek 2nd Plat Final Plat_Rev2_2022-08-26
09/02/2022 Letter Applicant Letter - FP (DRCF)
09/08/2022 Letter 2022_09_08 - Cobey Creek 2nd Plat - Final Plat Comment Response
09/08/2022 Plans Cobey Creek 2nd Plat Final Plat_Rev3_2022-09-08
09/08/2022 Letter KCT 237022 WD - recorded
09/08/2022 Letter KCT 237024 SWD 1 - recorded
09/08/2022 Letter KCT 237024 SWD 2 - recorded
09/15/2022 Letter Applicant Letter - FP (DRCF)
09/28/2022 Letter 2022_09_28 - Cobey Creek 2nd Plat - Final Plat Comment Response
09/28/2022 Plans Cobey Creek 2nd Plat Final Plat_Rev4_2022-09-28
10/11/2022 Letter Applicant Letter - FP (DRCF)
11/08/2022 Email MoDOT email correspondence 110822
01/06/2023 Letter PL2022-091 FP Coney Creek 2nd Plat PC
03/08/2023 Drawing Cobey Creek Elevations_Recvd 030823
03/08/2023 Letter Cobey Creek_2nd Plat_Twin Product exterior materials_Recvd 030823
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home