PL2022052




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022052
The Retreat at Bailey Farms, 1st Plat - Erosion and Sediment Control and Mass Grading Plan
Engineering Plan Review
Engineering Plan Review
Approved
02/10/2022
DOMAIN TIMBERLAKE MULTISTATE LLC
Locations
Contacts
Not shown for privacy reasons.
Not shown for privacy reasons.
Not shown for privacy reasons.
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
DOMAIN TIMBERLAKE MULTISTATE LLC, Address:590 MADISON AVE FL 13TH  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 01/02/2024 12/14/2023
Gene Williams, P.E.
Engineering Review No Comments 05/14/2022 05/14/2022
Gene Williams, P.E.
Engineering Review Corrections 02/25/2022 02/25/2022
Gene Williams, P.E.
Corrective Action Required
02/25/2022

Please re-title the plans as "Erosion and Sediment Control and Mass Grading Plan" or equivalent language. There has been confusion in the past regarding the mass grading aspect of erosion and sediment control plans, and since this plan shows extensive mass grading, the title should reflect the scope.
Corrective Action Required
02/25/2022

A Stormwter Pollution Prevention Plan (SWPPP) is required prior to formal approval of this plan.
Corrective Action Required
02/25/2022

There are areas off-site to the north which have the potential to create erosion and migration of sediment without adequate erosion control measures installed. Please evaluate this area near "future Arberetum Dr." and show additional erosion and sediment control measures in this area as appropriate.
Corrective Action Required
02/25/2022

It would appear turf reinforcement mat is warranted within the swales to be constructed. This would include the areas discussed in the Feb. 25, 2022 comment letter on the Street, Stormwater, and Master Drainage Plan. Please evaluate and revise as appropriate. The City continues to see issues with swales, especially in rear yards, and the installation of turf reinforcement mat to establish vegetation early along with increased sheer stress strength will mitigate these issues.
As-graded MDP Review Pending 03/18/2025
Gene Williams, P.E.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
02/10/2022 Plans 21-133-EROS(REV0) signed
02/25/2022 Letter DE-Comment Letter (Engineering Plans)
04/26/2022 Plans 21-133 EROS(REV1)sealed
04/26/2022 Letter Response to Comments - DE Comment Letter dated 2-25-2022 - Erosion Control Plan
04/26/2022 Engineers Estimate 21-133-Retreat - EOPC(REV0)
06/06/2023 Letter APPLICATION EXTENSION REQUEST_Rev 0_PL2021431
12/14/2023 Activity Document FeeWorksheetMassGradingESCRetreatBailey
12/14/2023 Approved Plans STAMPED CONSTRUCTION PLANS
12/14/2023 Email STKY APPROVAL
03/13/2025 Plans MASTER DRAINAGE AS-BUILTS_Rev 0_PL2021431
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home