Planning Application Status

PL2022044




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022044
Mega Storage Phase 1
Commercial Final Development Plan
Commercial Final Development Plan
Approved
02/03/2022
WHD MANAGEMENT LLC
Locations
Contacts
WHD MANAGEMENT LLC, Address:PO BOX 1059  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 10/10/2022 10/10/2022
Hector Soto Jr.
Mega Storage Phase I - Exterior changes
Building Codes Review No Comments 03/30/2022 03/31/2022
Mike Weisenborn
Miscellaneous Correction
Resolved
03/31/2022

Provide complete sight lighting plan that includes all circuitry and pole base details if applicable. Provided in the building permit set.
Engineering Review Approved with Conditions 03/30/2022 03/31/2022
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
03/31/2022

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE C&O #12 Cut & Fill
Corrective Action Required
03/31/2022

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
DE Contact Field Eng. Inspector
Corrective Action Required
03/31/2022

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
03/31/2022

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $32,553.46
DE Reclaimed Pond Site
Corrective Action Required
03/31/2022

Submittal of a geotechnical report to the City for the reclaimed pond site shall be required prior to the issuance of any building permit on the affected lots.
DE Future Repair Work
Corrective Action Required
03/31/2022

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Planning Review No Comments 03/30/2022 03/28/2022
Hector Soto Jr.
Traffic Review No Comments 03/30/2022 03/23/2022
Mike Weisenborn
Fire Review Approved with Conditions 03/30/2022 03/23/2022
Mike Weisenborn
Code Statement
Corrective Action Required
03/23/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fire Review Approved with Conditions 03/10/2022 03/13/2022
Jim Eden
Code Statement
Corrective Action Required
03/13/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Planning Review Corrections 03/10/2022 03/11/2022
Hector Soto Jr.
Corrective Action Required
03/11/2022

ROW WIDTH. Label the ROW widths for both NE Town Centre Dr and NE Town Centre Blvd.
Corrective Action Required
03/11/2022

SIDEWALKS. Label the width of the existing sidewalk along NE Town Centre Dr.
Corrective Action Required
03/11/2022

LIGHTING. Provide manufacturer specifications for all proposed wall pack fixture and parking lot pole fixtures for review. Fixtures shall comply with the requirements of UDO Section 8.220, 8.250 and 8.260.
Corrective Action Required
03/11/2022

STREET NAME. The architectural FDP plan set mistakenly identifies NE Town Centre Blvd (the north-south street to the west) as Independence Ave. Correct.
Engineering Review Corrections 03/10/2022 03/11/2022
Sue Pyles, P.E.
Corrective Action Required
03/11/2022

Submit an Engineer's Estimate of Probable Construction Costs, SWPPP, and MDNR Permit.
Corrective Action Required
03/11/2022

Please note: An As-Graded and As-Built drawing shall be submitted to and reviewed by the City for the detention basin. This shall be required prior to issuance of a Certificate of Substantial Completion. All precautions should be taken to ensure detention pond and outlet structure are constructed according to the approved plans; volumes and elevations are critical for As-Built approval.
Corrective Action Required
03/11/2022

Sheet C1.0: Show location of all oil/gas wells, or indicate none are present, and cite the source. Field survey evidence isn’t sufficient.
Corrective Action Required
03/11/2022

Sheet C1.2: • Clearly identify the existing retaining wall along the street frontage. • The curb and gutter detail or pavement detail must show that the aggregate base and compaction of native subgrade extends a minimum of one (1) foot beyond the back of curb.
Corrective Action Required
03/11/2022

Sheet C1.4: • Remove or reword Utility Notes 2 & 5. Coordination of the public water and sanitary lines with the city will be through separate projects and plan sets. • The vault standard detail specifies a concrete bottom, not gravel. Please revise or clarify. • All pipes greater than 6” diameter require profiles. Please add the fire line profile, with size, material, length, bends, valves, etc.
Corrective Action Required
03/11/2022

Sheet C2.1: • Please review proposed contours. Many near the south edge of the site are shown making 90 degree or greater bends, which aren’t practical. • At the north end of the detention basin, there is an end section or riprap, or similar. Please clarify what it is and if it is temporary or permanent.
Corrective Action Required
03/11/2022

Sheet C2.2: • Please revise the silt fence along the north edge of the site. As shown, it won’t provide sediment control. • The note and staging chart clearly indicate that there is to be a sediment basin constructed during this phase. Please include that information on the Plan view.
Corrective Action Required
03/11/2022

Sheet C2.3: Please revise the silt fence along the north edge of the site. As shown, it won’t provide sediment control.
Corrective Action Required
03/11/2022

Sheet C2.4: The maximum allowable design cross-slope for sidewalks is 1.5% Please revise the ADA Ramp details accordingly.
Corrective Action Required
03/11/2022

Sheet C3.4: • The Finish Floor Elevation text is covering part of the Str. 1-5 label in Plan view. Please revise for clarity. • Str. 1-2 thru 1-6 are labeled as existing in Profile view. Please revise. • Str. 1-4 and 1-5 do not meet the required 0.5’ drop across the inlet. Please revise. • Remove the hatching from the storm sewer pipes in Profile view for clarity on this and all other storm sewer profiles.
Corrective Action Required
03/11/2022

Sheet C3.6: • Bends are not allowed on storm sewers. Changes in direction must be made at a structure. Please revise Line 7 accordingly. • Please revise the size in the Str. 7-1 Plan view label. It includes a typo.
Corrective Action Required
03/11/2022

Standard Details: • Please include standard details for rock ditch check, sediment basin with design chart completed, nyloplast inlet, and driveway detail. • Remove all details not used on this project.
Corrective Action Required
03/11/2022

Sheet C4.5: • Weir opening width does not match between Plan and Section views. Please reconcile. • Weir elevation does not match between Plan and Section views. Please reconcile. • Section views show the 15” and 24” pipes as outlet pipes. Is this the intent? • Please include the elevation of the bottom hole in the perforated riser and verify the basin will not hold water.
Building Codes Review Corrections 03/10/2022 03/11/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
03/11/2022

Provide complete sight lighting plan that includes all circuitry and pole base details if applicable.
Traffic Review No Comments 03/10/2022 03/08/2022
Brad Cooley, P.E., RSPI
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $1,200.00 $1,200.00 Paid 02/24/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
02/03/2022 Application Form FDP - Mega Storage
02/24/2022 Engineer Report/Study 20231 - Micro Study - 02_18_2022
02/24/2022 Application Form FDP Checklist - Mega Storage
02/24/2022 Receipt Receipt for transaction:2022-000990
03/11/2022 Waiver/Modification Document Pavement Modification
03/14/2022 Letter Applicant Letter - FDP (DFDP)
03/21/2022 Waiver/Modification Document LS Design Mod Request
03/23/2022 Engineers Estimate 20231 - Mega Storage Site Dev
03/23/2022 Engineer Report/Study 20231 - SWPPP - 01_18_2022
03/23/2022 Waiver/Modification Document Pavement modification
03/23/2022 Activity Document MO DNR Permit #MORA19391
03/23/2022 Letter Town Centre - Mega Storage - FDP Resubmittal Letter
03/23/2022 Specifications Town Centre Lot 1 - Area Lighting Spec Sheet
03/31/2022 Letter Applicant Letter - FDP (DFDP)
04/05/2022 Engineers Estimate 20231 - Mega Storage Site Dev - 04.01.2022
04/22/2022 Activity Document Fees PL2022044 Mega Storage FDP
04/27/2022 Approved Plans Approved - 20231 - Mega Storage Arch FDP Set - 03_23_2022
04/27/2022 Approved Plans Approved - 20231 - Mega Storage Civil FDP Set - 03_23_2022
09/30/2022 Plans 20231 - Mega Storage Permit Set - 09_30_2022
09/30/2022 Plans A3_1 - Building Elevations
09/30/2022 Plans A3_2 - Building Elevations
10/13/2022 Letter Applicant Letter - FDP (DFDP)
10/13/2022 Email Mega Storage
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home