Cornerstone at Bailey Farms 1st Plat - Erosion and Sediment Control and Mass Grading
Engineering Plan Review
Engineering Plan Review
Approved
12/21/2021
CLAYTON PROPERTIES GROUP INC
Locations
Contacts
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
Reviews
Review Type Outcome Est. Completion Date Completed
As-graded MDP Review No Comments 03/17/2025 03/13/2025
Gene Williams, P.E.
Engineering Review Approved with Conditions 01/02/2024 12/14/2023
Gene Williams, P.E.
Engineering Review No Comments 06/01/2022 06/02/2022
Gene Williams, P.E.
Engineering Review No Comments 05/12/2022 05/13/2022
Gene Williams, P.E.
Engineering Review Corrections 02/28/2022 02/28/2022
Gene Williams, P.E.
Corrective Action Required
02/28/2022

Appendix L is referenced within the SWPPP. However, Appendix L is blank. It is our understanding that endangered species of bats are the most likely wildlife to be encountered during construction, and it is also our understanding to cease consruction activities and immediately contact the MDNR, Dept. of Conservation, and U.S. Fish and Wildlife Service if bats are observed during tree removal, even during the window of tree removal in the winter. Otherwise, not only are the bats deprived of their habitat, but will migrate to existing attics within homes, causing a threat to health and safety of adjacent residents. Please take a look at the requirements of the SWPPP, and ensure Appendix L is updated as appropriate.
Corrective Action Required
02/28/2022

One single note was provided at the bottom of sheet 5 concerning the sediment basin construction. I had requested a prominant note be placed within the plans, and the most logical placement of this note would have been in the staging chart - Stage A "Pre-Clearing Phase". Why was this vital element of the erosion and sediment control plan left out of the staging chart? And why is the faircloth skimmer a generic detail rather than a site specific detail? A site-specific detail is needed for all of these features, including the faircloth skimmer. A contractor and inspector need to know exactly what they are installing, and they need to know elevations, where to discharge, etc. In other words, all the details shall be provided. Please review and revise as appropriate.
Corrective Action Required
02/28/2022

Please see comments in Street, Stormwater, and Master Drainage Plan dated Feb. 25, 2022. The outlet structure would be better located to the south to avoid short-circuiting of the water quality aspect of the basin. Please revise this plan to match what is shown on the other plans.
Engineering Review Corrections 01/10/2022 01/10/2022
Gene Williams, P.E.
Corrective Action Required
01/10/2022

It would appear the detention basin should be used for temporary sediment basin during construction, along with approprieate skimmers and outlet controls. Please show how this will be accomplished, along with details on skimmers, etc.
Corrective Action Required
01/10/2022

A SWPPP is required prior to approval.
Corrective Action Required
01/10/2022

A note shall be placed on the first sheet which makes it clear the sediment basin described in comment #1 is constructed first, prior to any other activities related to this project.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home