Planning Application Status

PL2021435




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021435
Manor at Bailey Farms 1st Plat - Mass Grading and Erosion and Sediment Control
Engineering Plan Review
Engineering Plan Review
Approved
11/05/2021
CLAYTON PROPERTIES GROUP INC
Locations
Contacts
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
Reviews
Review Type Outcome Est. Completion Date Completed
As-graded MDP Review No Comments 03/17/2025 03/13/2025
Gene Williams, P.E.
Engineering Review Approved with Conditions 01/02/2024 12/14/2023
Gene Williams, P.E.
Engineering Review No Comments 05/31/2022 06/02/2022
Gene Williams, P.E.
Engineering Review Corrections 05/11/2022 05/11/2022
Gene Williams, P.E.
Corrective Action Required
05/11/2022

Engineer's Estimate appeared to be missing the following items: 1) construction entrances, 2) final restoration, and 3) sediment basin construction. If possible, please break out the estimate according to erosion and sediment control and mass grading covered by these plans.
Corrective Action Required
05/11/2022

Please remove the phrase "Not for Construction".
Engineering Review Corrections 02/14/2022 02/15/2022
Gene Williams, P.E.
Corrective Action Required
02/15/2022

Please refer to comments on Street, Stormwater and Master Drainage Plan dated Feb. 14, 2022. It would appear the outlet pipe for the detention basin /sediment basin is in direct conflict with the preliminary design for the box culvert at Cape Dr. and the creek. Please review the preliminary design, and revise as appropriate.
Corrective Action Required
02/15/2022

Please add the words "and Mass Grading Plan" to the title of the plans.
Corrective Action Required
02/15/2022

Please refer to previous comments related to construction of the sediment basin as the first step in the project. I did not see anywhere in the construction staging table where the sediment basin is called-out for construction. It would appear this should be completed at step 1 in the process.
Corrective Action Required
02/15/2022

Sheet 11: The note on the bottom states the basin shall be built prior to any infrastructure being constructed. Please revise the note to state "prior to any work being performed", or simply remove the note and revise the table as described earlier in these comments (see comment 3 above).
Corrective Action Required
02/15/2022

Sheet 11: The faircloth skimmer is connected to an outlet structure with no references to its construction. Provide all necessary notation specifying where these construction details are located (i.e., within separate plan set, or alternatively, elsewhere within this plan set). In any case, the outlet structure and all appurtenances such is incoming pipe, trash rack, orifices, weirs, etc. shall require detailing in some fashion, whether in these plans or elsewhere. Proper referencing within this plan set shall be provided so there is no confusion within the field. It is also recommended that sufficient detailing be provided for the emergency spillway, the grading for the detention basin, and the 100 year WSE for the clogged condition in graphic format since these items are critical for easy conversion of the basin into a permanent detention basin at a later date.
Corrective Action Required
02/15/2022

Sheet 11: The design table located in upper right presents a "Time to Drain" as 2. What are the units for "Time to Drain"?
Corrective Action Required
02/15/2022

Sheet 11: No notes were provided on this sheet or elsewhere within the plan set regarding silt removal during construction activities. This shall be noted in the plans, with a target depth of silt when silt removal is required by the contractor. Silt shall be disposed properly off-site.
Corrective Action Required
02/15/2022

Sheet 11: Sufficient notation and diagrams are required showing how the faircloth skimmer will be attached to the trash rack of the 15 inch RCP. If this is not the intent (i.e., if the faircloth skimmer is being attached differently), then please be specific how it is being attached.
Corrective Action Required
02/15/2022

Sheet 11: Farcloth skimmer detail does not match the grading contours shown on this sheet. The skimmer detail shows a depression at the skimmer end of the assembly. Please be specific on the plan view by showing this depressed area, with separate notation as necesary.
Corrective Action Required
02/15/2022

All Sheets with Erosion and Sediment Control Staging Chart: Please add the sediment basin and installation of the faircloth skimmer details into this chart. Revise as appropriate, with suitable refernces to the details and sheet number contained within this plan set.
Corrective Action Required
02/15/2022

Please remove the easements for the incoming and outgoing pipes serving the detention basin. These lines are private, and no easement is desired by the City. Please ensure this comment is carried-through to the final plat.
Corrective Action Required
02/15/2022

Note 2 under Site Specific Notes: It is our understanding that wetlands do exist on this site. Is this correct, or am I misunderstanding? The note should be revised if this is correct.
Corrective Action Required
02/15/2022

All Sheets with Erosion and Sediment Control Staging Chart: Please add notes concerning the removal of silt within the sediment basin. The note shall be specific as to the depth of silt when removal is warranted. Notes shall be specific as to the disposal of silt, since this cannot be used as structural fill anywhere on the project site, and proper disposal is required.
Corrective Action Required
02/15/2022

A Stormater Pollution Prevention Plan (SWPPP) was missing from the submittal package. This shall be required prior to approval of any plans for this project.
Corrective Action Required
02/15/2022

It is our understanding that wetlands exist on this project. Please submit all required documentation concerning this issue from the U.S. Fish and Wildlife Service. This shall be required prior to approval of any plans.
Corrective Action Required
02/15/2022

A cost estimate was requested in previous applicant letter, and the response to comments states this was included in the resubmittal package. I did not see any cost estimate included with the package. This shall be required prior to approval of these plans.
Engineering Review Corrections 11/19/2021 11/19/2021
Gene Williams, P.E.
Corrective Action Required
11/19/2021

A SWPPP shall be required prior to approval of the erosion and sediment control plan.
Corrective Action Required
11/19/2021

A Master Drainage Plan was included within the erosion and sediment control plan. Please remove. This should be included within the Stret, Stormwater, and Master Drainage Plan set.
Corrective Action Required
11/19/2021

Will the detention basin be utilized as a sediment basin? If not, why not?
Corrective Action Required
11/19/2021

If utilizing the detention basin for a sediment basin, then appropriate design shall be shown for the sediment basin, and sufficient notes stating this shall be the constructed along with all other erosion and sediment control devices on the project.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home